Wellab Limited was commissioned
by Civil Engineering and Development Department (CEDD) as the Environmental
Team to undertake the Environmental Monitoring and Audit (EM&A) services
for the Works Contracts involved in the implementation of First Phase
Development of Kwu Tung North (KTN) and Fanling North
(FLN) New Development Areas (NDAs) Project to ensure that the
environmental performance of the Works Contracts comply with the requirements
specified in the Environmental Permits (EPs), Updated Environmental Monitoring
& Audit (EM&A) Manual, Environmental Impact Assessment (EIA) Report of
the KTN FLN NDAs project and other relevant statutory requirements.
1.2
This is the 11th
EM&A Report which summarises the key findings of
the EM&A programme in September 2020.
1.3
The structure
of the report is as follows:
Section 1: |
Introduction
- purpose
and structure of the report. |
Section 2: |
Project
Information - summarises background and scope of the Project, site
description, project organisation and contact
details, construction programme, the construction
works undertaken and the status of Environmental Permits/Licences
during the reporting month. |
Section 3: |
Air Quality Monitoring - summarises the monitoring parameters, monitoring programmes, monitoring methodologies, monitoring
frequencies, monitoring locations, Action and Limit Levels, monitoring
results and Event / Action Plans. |
Section 4: |
Noise
Monitoring - summarises the monitoring parameters, monitoring programmes, monitoring methodologies, monitoring
frequencies, monitoring locations, Action and Limit Levels, monitoring
results and Event / Action Plans. |
Section 5: |
Water Quality Monitoring - summarises the monitoring parameters,
monitoring programmes, monitoring methodologies,
monitoring frequencies, monitoring locations, Action and Limit Levels and
Event / Action Plans. |
Section 6: |
Land Contamination (Ambient Arsenic Monitoring) -
summarises the monitoring parameters,
monitoring programmes, monitoring methodologies,
monitoring frequencies, monitoring locations, Action and Limit Levels,
monitoring results and Event / Action Plans. |
Section 7: |
Landfill
Gas Monitoring -
summarises the monitoring requirement, monitoring
parameters and frequency, monitoring locations, Action and Limit Levels,
monitoring results and observation, and Event / Action Plans. |
Section 8: |
Ecological Monitoring ¡V summarises the details of Monitoring
of Measures to Minimise Disturbance to Waterbirds in Ng Tung River, Sheung
Yue River, Shek Sheung
River and Long Valley, Monitoring of Measures to Minimise
Impacts to Ma Tso Lung Stream and Siu Hang San Tsuen Stream, and Long Valley,
Monitoring of Measures to Minimise Impacts on
Ecological Sensitive Habitats from Disturbance and Pollution , result and
observation during the Reporting Month |
Section 9: |
Environmental
Site Inspection -
summarises the audit findings of the weekly site
inspections undertaken within the reporting month. |
Section 10: |
Environmental
Non-conformance - summarises any monitoring exceedance, environmental
complaints, environmental summons and successful prosecutions within the
reporting month. |
Section 11: |
Future
Key Issues - summarises the impact forecast, proposed mitigation
measures and monitoring schedule for the upcoming months. |
Section 12: |
Conclusions
and Recommendations |