Table 4.1         Location of Noise Monitoring Stations

Contract No.

Monitoring Station(s)

Location(s)

ND/2019/06

CP-FLN-NMS1

Belair Monte

ND/2019/05

CP-FLN-NMS2[2]

Scattered Village Houses in Tong Hang

ND/2019/01

CP-KTN-NMS2[3]

Residential Buildings at Ma Tso Lung

CP-KTN-NMS3[4]

Fung Kong Garden

ND/2019/01

CP-KTN-NMS5

N/A

Remark:

[1]: Noting that construction phase noise monitoring at the other proposed monitoring stations (e.g. planned), where access is permitted, will be conducted during the relevant works contract(s).

[2]: Since the distance between monitoring station and site boundary of ND/2019/03 under EP-473/2013/A exceeds 300m. The monitoring station is not applicable to ND/2019/03.