Table
3.1 Location for
Air Quality Monitoring Locations
EP No. |
Contract No. |
Monitoring Station |
Location |
EP-473/2013/A |
ND/2019/03 |
FLN-DMS1[2] |
Scattered
Village Houses North of Proposed Potential Ecopark |
ND/2019/05 |
FLN-DMS3[3] |
House
near Tong Hang |
|
EP-466/2013 EP-467/2013/A EP-468/2013/A |
ND/2019/01 |
KTN-DMS4 |
Temporary
Structure near Fanling Highway (near Pak Shek Au) |
EP-468/2013/A |
ND/2019/03 |
Remark:
[1]: Noting that construction phase air
quality monitoring at the other proposed monitoring stations (e.g. planned),
where access is permitted, will be conducted during the relevant works
contract(s).
[2]: Since the distance between monitoring
station and site boundary of ND/2019/05 under EP-473/2013/A exceeds 500m. The
monitoring station is not applicable to ND/2019/05.
[3]: Since the distance between monitoring
station and site boundary of ND/2019/03 under EP-473/2013/A exceeds 500m. The
monitoring station is not applicable to ND/2019/03.