Table 11.1 Summary Table for
Site Activities, Potential Environmental Impacts and Recommended Mitigation
Measures in the coming Two Months
Contract No. |
Site Activities (October and November 2020) |
Potential Environmental Impact |
Control Measures |
ND/2019/01 |
(a)
Ground Investigation, Site Clearance, Tree Felling in Portion 1f; |
Dust impact from
exposed site surfaces during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
Noise from drill rigs, other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
Timber waste |
1.
Sorting, cutting & delivering the suitable timber to shredding facilities
for recycling and reuse |
||
(b)
Site Clearance, Ground Investigation, Construct temporary road in
Portion 2 |
Dust impact from
exposed site surfaces during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from drill
rigs, other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
(c)
Tree Survey, Site Clearance in Portion 3 |
Dust impact from
exposed site surfaces during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from grass
trimmer or other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
(d)
Construct temporary noise barrier, construct open channel and sand trap
in Portion 4 |
Dust impact from
exposed site surfaces during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from hand-held
breaker or other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
(e)
Site Clearance, temporary slope cutting temporary soil nailing in
Portion 5 |
Dust impact from
exposed site surfaces during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from grass
trimmer or other plants |
1. Well-maintained
plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
Wash water from
dust suppression sprays |
1.
Appropriate & sufficient desilting/sedimentation devices provided on site
for treatment before discharge 2.
Establish sediment control measure (retention pit with soil berm) at near all excavation area /
low-lying region |
||
(f)
Site Clearance, temporary slope cutting temporary soil nailing, sheetpiling and excavation, pipes laying in Portion 6a |
Dust impact from
exposed site surfaces during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from grass
trimmer or other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive receivers |
||
Wash water from
dust suppression sprays |
1.
Appropriate & sufficient desilting/sedimentation devices provided on site
for treatment before discharge 2.
Establish sediment control measure (retention pit with soil berm) at near all excavation area /
low-lying region |
||
(g)
Completion of Soil Treatment Facility, Pilot trial for Ex-situ cement
mixing (ECM) for soil treatment, provide soil treatment for HAC soil by ECM
in Portion 6b; |
Dust impact from
active works area, exposed site surfaces and unpaved roads, particularly
during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from concrete mixing
backhoes, other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
Dust from Arsenic-containing
soil |
1.Cover
the Arsenic-containing soil with impervious sheeting to prevent dust emission
or run-off during heavy rain |
||
(h)
Site Clearance, Tree felling, Construction of temporary road for
alternative Po Lau Road, Land contamination assessment in Area T1, T2 &
T3 in Portion 7; |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from grass trimmer or
other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
(i)
Ground Investigation, Construction of Retaining Wall, cut slope and
soil nailing works in Portion 8a; |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from drill
rigs, other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
Runoff and
drainage from the works area |
1.
Appropriate & sufficient desilting/sedimentation devices provided on site
for treatment before discharge 2. Well
maintain the drainage system to prevent the spillage of wastewater 3.
Establish sediment control measure (retention pit with soil berm) at near all excavation area /
low-lying region 4.
Covering stockpiling area by impervious sheets 5. Slope
stabilization (such as hydroseeding) |
||
Fuel and
lubricants from maintenance of construction vehicles and mechanical
equipment. |
1.
Sufficient drip tray & spill kit on
site 2.
Store chemical containers in chemical
storage area/on drip-tray |
||
(j)
Tree Survey, Site Clearance, Ground Investigation in Portion 9b&9d |
Dust impact from
exposed site surfaces during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from grass
trimmer or other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
(k)
Stockpile of soil in Portion 9c; |
Dust from
stockpiles in dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations |
|
Wash water from
dust suppression sprays Runoff and
drainage from the works area |
1.
Appropriate & sufficient desilting/sedimentation devices provided on site
for treatment before discharge 2.
Establish sediment control measure (retention pit with soil berm) at near all excavation area /
low-lying region |
||
(l)
Site Clearance, Tree felling, Excavation, Pipes Laying in Portion 10a;
and |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from grass trimmer or
other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
(m)
Site Clearance, Demolition of existing structure in 10b |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed
control for the site vehicles |
|
Noise from concrete breaker
or other plants |
1.
Well-maintained plant and equipment 2.
Deployment of proprietary noise barriers for noisy works near sensitive
receivers |
||
ND/2019/03 |
(a) Road and Drainage work, Soil Replacing in Portion 1; |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
Noise from concrete breaker
or other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
(b) Portion 2 to Portion 20 |
|
|
|
-
Recommended initial maintenance work |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
-
Erection of Permanent Boundary Structure at
Portion 18 in Portion 2 to 20 |
Dust impact from exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
-
Installation of Lockable Gate at Portion 18 |
Noise from electric breaker,
other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
|
-
Construction of Irrigation Channel |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from concrete breaker
or other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
-
Geotechnical Works in Long Valley(Trail
Pits & Drill Hole) |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from drill
rigs, other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
-
Construction of Temporary Road in Long
Valley |
Dust impact from active works
area, exposed site surfaces and unpaved roads, particularly during dry
weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from
roadworks |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
-
Demolition of Existing Construction in Handed over Area |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from concrete breaker
or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
-
Construction works of storage shed and type
2 Storage House |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from concrete breaker
or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
-
Wetland Creation & Restoration works
after Obtaining Approval from AFCD |
N/A |
N/A |
|
(c)
Site clearance and Demolition in Portion 22 |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from concrete breaker
or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
(d) Fish Cage Placing for Pre-Translocation in Portion 23 and 24 |
N/A |
N/A |
|
(e)
Fence off Portion 26 |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
ND/2019/05 |
(a)
Site Clearance |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
Noise from concrete breaker
or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
(b) Establishment of Temporary Site |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
(c)
Tree Felling |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from grass
trimmer or other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
Timber waste |
1. Sorting, cutting &
delivering the suitable timber to shredding facilities for recycling and
reuse |
||
(d) Trial Pits |
Dust impact from
active works area, exposed site surfaces and unpaved roads, particularly
during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from excavator,
other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
(e)
Installation of site hoarding, fencing and
temp. facilities |
Dust impact from
active works area, exposed site surfaces and unpaved roads, particularly
during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
(f)
Construction of PM¡¦s Site Accommodation Ground
Investigation/Pre-drilling |
Dust impact from
active works area, exposed site surfaces and unpaved roads, particularly
during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from drill
rigs, other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
ND/2019/06 |
(a) Construction of Management Office Building; |
Dust impact from
active works area, exposed site surfaces and unpaved roads, particularly
during dry weather |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
Noise from drill rigs, other plants |
1. Well-maintained
plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
Runoff and drainage from the works area |
1. Appropriate & sufficient
desilting/sedimentation devices provided on site for treatment before
discharge 2. Well maintain the drainage
system to prevent the spillage of wastewater 3. Establish sediment control
measure (retention pit with soil berm)
at near all excavation area / low-lying region 4. Covering stockpiling area by
impervious sheets 5. Slope stabilization (such as hydroseeding) |
||
(b) Breaking up the concrete surface and disposal of C&D material off
site at Portion 3 |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from concrete breaker or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
Fuel and lubricants from maintenance of
construction vehicles and mechanical equipment. |
1. Sufficient drip tray &
spill kit on site 2. On-site sorting and screening
for reuse (e.g. backfilling, hard paving the haul road & reuse in other
projects) 3. Store
chemical containers in chemical storage area/on drip-tray |
||
(c) Construction of footings of steel canopy of final stage market |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Fuel and
lubricants from maintenance of construction vehicles and mechanical
equipment. |
1. Sufficient drip tray &
spill kit on site 2. Store
chemical containers in chemical storage area/on drip-tray |
||
1. Tree felling at Portion 3 and 6 |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from grass
trimmer or other plants |
1.
Well-maintained plant and equipment 2. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
Timber waste |
1. Sorting, cutting &
delivering the suitable timber to shredding facilities for recycling and
reuse |
||
2. Fabrication of Container type toilets for relocation of public toilet |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
3. Fabrication and welding test of columns and steel truss of steel
canopy in China. |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2. Spraying
all dusty material with water immediately prior to any loading transfer
operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
4. Application of coating for columns and steel truss of steel canopy in
China. |
Fuel and
lubricants from maintenance of construction vehicles and mechanical
equipment. |
1. Sufficient drip tray &
spill kit on site 2. Store chemical containers in
chemical storage area/on drip-tray |
|
5. Site clearance and concreting of blinding layer for erection of
container type toilets. |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading transfer
operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from concrete breaker
or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
6. Erection of temporary public toilet. Connection of electricity and water
supply for the container type toilets. |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading
transfer operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from electric breaker
or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary noise
barriers for noisy works near sensitive receivers |
||
7. Demolition of existing public toilet. |
Dust impact from
exposed area |
1.
Covering stockpiling area by impervious sheets 2.
Spraying all dusty material with water immediately prior to any loading transfer
operations 3. Keep
the haul road wet by water sprinkler or water bowser 4. Cover
the dusty material on the dump truck 5. Speed control for the site
vehicles |
|
Noise from concrete breaker
or other plants |
1. Well-maintained plant and
equipment 2. Enclose relatively noisy
mechanical part by noise isolating mat 3. Deployment of proprietary
noise barriers for noisy works near sensitive receivers |
||
8. Relocation of Refuse Collection Point (RCP). |
Accumulation of
refuse on site |
1.Clear
the refuse on site regularly 2.Provide
rubbish bins for workforces |