12.1
This Monthly EM&A Report presents the EM&A work undertaken in October 2020 in accordance with Updated EM&A Manual.
12.2 No Action/Limit Level exceedance were recorded for air
quality, construction noise,
ambient arsenic, and landfill gas monitoring.
Contract No. ND/2019/01
12.3 Environmental site inspection were conducted on 6th,15th,
20th, 27th October 2020 by ET
in the reporting month.
Contract No.
ND/2019/02
12.4 Environmental site inspection were conducted on 28th
October 2020 by ET
in the reporting month.
Contract No. ND/2019/03
12.5 Environmental site inspection were conducted on 9th,16th,20th,30th
October 2020 by ET
in the reporting month.
Contract No. ND/2019/05
12.6 Environmental site inspections were conducted on 7th,12th,19th,27th
October 2020 by ET in the reporting month.
Contract No. ND/2019/06
12.7 Environmental site inspections were conducted on 8th,14th,22nd,29th
October 2020 by ET in the reporting month.
12.8 There were no environmental complaints, no notification of
summons or successful prosecutions received in the reporting month.
12.9 The ET would keep track on the EM&A programme to ensure
compliance of environmental requirements and the proper implementation of all
necessary mitigation measures.
12.10
According to the environmental audits performed in the reporting month,
the following recommendations were made:
Air Quality Impact
¡P To enhance the dust suppression measures such as water
spraying on all haul roads and expose work site area; and
¡P To maintain the impervious material to cover the
stockpile of dusty materials; and
¡P To ensure all regulated machines with valid Non-road
Mobile Machinery (NRMM) labels.
Water Impact
¡P To prevent any surface runoff discharge into nearby
drainage or stream;
¡P To divert all the water generated from construction
site to de-silting facilities with enough handling capacity before discharge; and
¡P To ensure the drainage facilities would not be clogged
with waste to avoid overflow.
Waste/Chemical Management
¡P To avoid improper handling, storage and dispose of oil
drums or chemical containers on site; and
¡P To store chemical waste/waste oil properly in the
designated place before disposal.
Landscape & Visual Impact
¡P To clear the construction materials/wastes properly
within the tree protection zone.
¡P Retained trees should be carefully protected.
¡P Dull green fencing should
be secured with no gaps or no holes.
Landfill Gas Hazard
¡P ¡§No Smoking¡¨ and ¡§No Naked Flame¡¨ notices in Chinese and
English should be posted prominently around the construction site.
Land Contamination
¡P Stockpiling site(s) should
be lined with impermeable sheeting and bunded. Stockpiles should be properly
covered by impermeable sheeting to reduce dust emission during dry season or
contaminated run-off during rainy season. Watering should be avoided on stockpiles
of soil to minimize runoff.