9.1
Site
audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures on the Contract site. The
summaries of site audits are presented in Table 9.1 and Appendix L.
Table
9.1 Summary of
Site Audit
Environmental Site Inspection |
Works Contracts |
||||
ND/2019/01 |
ND/2019/02 |
ND/2019/03 |
ND/2019/05 |
ND/2019/06 |
|
Weekly site audit with representative
of the Supervisor¡¦s Representative
and the Contractor |
3rd, 10th, 17th,
24th November 2020 |
4th, 11th, 20th,
25th November 2020 |
6th, 13th, 17th,
27th November 2020 |
2nd, 11th, 16th,
23rd, 30th November 2020 |
5th, 9th, 19th,
26th November 2020 |
Joint Site Audit with representative
of the Supervisor¡¦s Representative,
the Contractor and IEC |
17th
November 2020 |
20th
November 2020 |
17th
November 2020 |
11th
November 2020 |
9th
November 2020 |
9.2
During
site inspections in the reporting month, no non-conformance was identified. The
observations and recommendations made during the audit sessions are summarised in Table
9.2.
Table
9.2 Observations and Recommendations during Site Audits |
|||||
|
Date |
Observations and
Recommendations |
Follow-up |
||
Contract No.: ND/2019/01 Date Observations and
Recommendations Follow-up |
|||||
Air Quality |
27/10/2020 |
Contractor was reminded to enhance dust control
measures in works area. |
Improvement/Rectification was
observed during follow-up audit session on 3 November 2020. |
||
03/11/2020 |
Contractor was reminded to enhance dust control
measures in works area Portion 7. |
Improvement/Rectification was
observed during follow-up audit session on 10 November 2020. |
|||
Water Quality |
17/11/2020 |
Contractor was reminded to clear the
sedimentation tank at Portion 6 regularly. |
Improvement/Rectification
was observed during follow-up audit session on 24 November 2020. |
||
Contract
No.: ND/2019/02 |
|||||
Air Quality |
04/11/2020 |
Exposed worksites should be watered regularly. |
Improvement/Rectification
was observed during follow-up audit session on 11 November 2020. |
||
11/11/2020 |
Stockpile of dusty materials should be covered
entirely by impervious sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 20 November 2020. |
|||
25/11/2020 |
Slope should be covered entirely by impervious
sheeting. |
Follow-up
action is needed to be reported in the following month. |
|||
Water Quality |
20/11/2020 |
Contractor was reminded to enhance water control
measure to prevent any discharge of wastewater into nearby watercourse. |
Improvement/Rectification
was observed during follow-up audit session on 25 November 2020. |
||
Waste / Chemical Management |
04/11/2020 |
Chemical waste/oil should be stored properly in
designated area. |
Improvement/Rectification
was observed during follow-up audit session on 11 November 2020. |
||
11/11/2020 |
Chemical waste/oil should be stored properly in
designated area. |
Improvement/Rectification
was observed during follow-up audit session on 20 November 2020. |
|||
Contract No.: ND/2019/03 |
|||||
Air Quality |
30/10/2020 |
Stockpile of dusty materials should be covered
by impervious materials/sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 6 November 2020. |
||
6/11/2020 |
Stockpile of dusty materials should be covered
by impervious materials. |
Improvement/Rectification
was observed during follow-up audit session on 13 November 2020. |
|||
13/11/2020 |
Stockpile of dusty materials should be covered
by impervious materials. |
Improvement/Rectification
was observed during follow-up audit session on 17 November 2020. |
|||
Contract No.: ND/2019/05 |
|||||
Water Quality |
02/11/2020 |
Contractor was reminded to review and ensure
surface runoff would not be discharged to nearby watercourse. |
Improvement/Rectification
was observed during follow-up audit session on 11 November 2020. |
||
23/11/2020 |
Contractor was reminded to cover the manhole at
Portion 11. |
Improvement/Rectification
was observed during follow-up audit session on 30 November 2020. |
|||
Waste / Chemical Management |
02/11/2020 |
Contractor was reminded to store chemical
properly in designated area. |
Improvement/Rectification
was observed during follow-up audit session on 11 November 2020. |
||
23/11/2020 |
Drip trays should be provided for chemical
storage at Portion 11. |
Item
was remarked as 201130-O01. Follow-up action is needed to be reviewed. |
|||
30/11/2020 |
Drip trays should be provided for chemical
storage at Portion 11. |
Follow-up
action is needed to be reported in the following month. |
|||
Contract No.: ND/2019/06 |
|
||||
- |
- |
No environmental deficiency was observed in the
reporting month. |
- |
|
|
9.3
According
to the EIA Report, EPs and the Updated EM&A Manual, the mitigation measures
detailed in the documents are recommended to be implemented during the
construction phase. An updated summary of the Environmental Mitigation
Implementation Schedule is provided in Appendix
M. The photographic records of measures as stipulated in EP to mitigate
environmental impacts in the reporting month are presented in Table 9.3.
Table 9.3 Photographic Records and
Implementation Status of Measures
EP No. |
Condition |
Photographic
Record |
Implementation
Status |
EP-468/2013/A |
2.11 |
To
minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas.(Figure 12) |
^[1] |
EP-473/2013/A |
2.13 |
To minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas.(Figure 14) |
^[1] |
EP-475/2013/A |
2.7 |
To minimise
adverse impacts on habitats of ecological importance in the vicinity of the
Project, 2m high solid dull green site barrier fences shall be erected around
all active works areas.(Figure 15) |
^[1] |
Implementation
status: |
^ Mitigation
measure was fully implemented * Observation/reminder
was made during site audit but improved/rectified by the contractor # Observation/reminder
was made during site audit but not yet improved/ rectified by the contractor X Non-compliance
of mitigation measure ¡P Non-compliance
but rectified by the contractor N/A Not Applicable at this stage as no such
site activities were conducted in the reporting period |
[1]: Barrier
fences might be subjected to change according to phasing plan designed at
detailed design stage
9.4
Under
EP-466/2013 (Condition 2.9), EP-467/2013/A (Condition 2.9), EP-469/2013
(Condition 2.7) to minimise
adverse impacts on habitats of ecological importance in the vicinity of the
Project, 2m high solid dull green site barrier fences shall be erected around
all active works areas. As the Works programme under
above EPs were still under preparation work and the
barrier fences erection was still progressing in the Reporting Month, 2m high
solid dull green site barrier fences will be checked once in place. The
Hoarding Plan of the above EPs are shown in Figure 10, Figure 11 and
Figure 13 respectively.
9.5
Waste generated
from Contract No. ND/2019/02, ND/2019/03, ND/2019/05 and ND/2019/06 include
inert construction and demolition (C&D) materials and non-inert C&D wastes,
while ND/2019/01 included only non-inert C&D wastes in the Reporting Month.
9.6
The amount
of wastes generated by the construction works of the Contract No. ND/2019/01, ND/2019/02,
ND/2019/03, ND/2019/05 and Contract
No. ND/2019/06 during
the reporting month is shown in Appendix
N.
9.7
The
Contractors are advised to minimize the wastes generated through the recycling
or reusing. All mitigation measures stipulated in the Updated EM&A Manual
and waste management plans shall be fully implemented. The status of
implementation of waste management and reduction measures are summited in Appendix M.