Table 9.3     Photographic Records and Implementation Status of Measures

EP No.

Condition

Photographic Record

Implementation Status

EP-468/2013/A

2.11

Hoarding_EP468(2)IMG_8572

IMG_84238b9fbd08-b225-4bb5-80da-a5cdc4cc8107

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 12)

^[1]

EP-473/2013/A

2.13

9f44b9e9-c079-48f7-b118-8cb6408cd442 8358ecf0-2d58-4c49-bace-c1d2abfe1cba

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 14)

^[1]

EP-475/2013/A

2.7

7cad187e-aae6-423a-a09c-3ac59fbbb57ba4fa0db8-7d38-40a5-9e2d-b50c88092a8f

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 15)

^[1]

Implementation status:

^         Mitigation measure was fully implemented

*         Observation/reminder was made during site audit but improved/rectified by the contractor

#         Observation/reminder was made during site audit but not yet improved/ rectified by       the            contractor

X        Non-compliance of mitigation measure

·         Non-compliance but rectified by the contractor

N/A   Not Applicable at this stage as no such site activities were conducted in the reporting            period

[1]:       Barrier fences might be subjected to change according to phasing plan designed at detailed design stage