Table 2.3 Summary
Table for Major Site Activities in the Reporting Month
Contract No. |
Site Activities (November 2020) |
ND/2019/01 |
(a)
Site clearance
and site formation in Portion 1f (b)
Site
clearance, ground investigation and working platform erection for soil nail in
Portion 2 (c)
Site
clearance and ground investigation in Portion 3 (d)
Site clearance,
temporary slope cutting for temporary soil nailing, Stockpile of soil, ground
investigation in Portion 5 (e)
Site clearance,
temporary slope cutting for temporary soil nailing, sheetpiling
and excavation, pipes laying, pre-bored H-piling in Portion 6a (f)
Pilot
trial of ex-situ cement mixing (ECM) for arsenic soil treatment works in
Portion 6b (g)
Site
clearance, construction of temporary road for alternative Po Lau Road, land
contamination assessment in Area T1, T2 & T3 in Portion 7 (h)
Construction
of retaining wall, slope cutting, soil nailing, excavation works for fresh
water service reservoir and soil nail in Portion 8a (i)
Site clearance
and stockpile of soil in Portion 9c (j)
Site
clearance, tree felling, sheetpiling and excavation
works in Portion 10a (k)
Site clearance
in Portion 10b (l)
Install
temporary noise barrier and building demolition in Portion 11a |
ND/2019/02 |
(a)
GI (b)
Trial Pit (c)
Tree
felling (d)
Lowering
the existing carriageway |
ND/2019/03 |
(a)
Road and Drainage work, Soil Replacing in Portion
1 (b)
Recommended Initial Maintenance Work, Erection of
Permanent Boundary Structure, Construction of Irrigation Channel,
Geotechnical Works in Long Valley (Trail Pits & Drill Hole), Construction
of Temporary Road in Long Valley, Asbestos Removal in Long Valley, Demolition
of Existing Construction in Handed over Area, Construction works of storage
shed and Type 2 Storage House, Wetland Creation & Restoration works after
Obtaining Approval from AFCD in Portion 2 to 20 (c)
Site
Clearance and Demolition at Portion 22 and Fish Cage Placing for
Pre-Translocation in Portion 22 and Portion 27. |
ND/2019/05 |
(a)
Site Clearance (d)
Establishment of Temporary Site (e)
Tree Felling (f)
Trial Pits (g)
Installation of site hoarding, fencing and temp.
facilities (h)
Construction of PM’s Site Accommodation (i)
Ground Investigation/Pre-drilling |
ND/2019/06 |
(a)
Construction
of finishing works, E&M works and Building Services works of Management
Office Building (MOB) at Portion 4 is in progress. (b)
Installation
of steel canopy column at Portion 3 is in progress. (c)
Construction
of underground utilities in the final stage market at Portion 3 is in
progress. (d)
Tree
felling at Portion 6 is in progress. (e)
Off-site fabrication, welding and
application of coating of columns of steel canopy in China is in progress. (f)
Demolition
of existing public toilet at Portion 5. (g)
Slope
improvement works at Portion 6 are in progress. (h)
Predrilling
works for mini-piles at Portion 3 and 6 have been completed. |