8.1
This Monthly EM&A Report presents the
EM&A work undertaken in May 2020 in accordance with Updated EM&A
Manual.
8.2
No Action/Limit Level exceedance were recorded
for construction noise and landfill
gas monitoring.
Contract No.
ND/2019/01
8.3
Environmental
site inspection was conducted on 6th , 12th , 19th
and 26th May 2020 by ET in the reporting month.
Contract No.
ND/2019/06
8.4
Environmental
site inspections were conducted on 7th , 13th , 21st
and 28th May 2020 by ET in the reporting month.
8.5
There
was no environmental complaints, no notification of summons or successful prosecutions
received in the reporting month.
8.6
The
ET would keep track on the EM&A programme to ensure compliance of
environmental requirements and the proper implementation of all necessary
mitigation measures.
8.7
According to the environmental audits performed
in the reporting month, the following recommendations were made:
Air Quality Impact
¡P To enhance the dust
suppression measures such as water spraying on all haul roads and expose work
site area; and
¡P To maintain the impervious
material to cover the stockpile of dusty materials;
and
¡P To ensure all regulated
machines with valid Non-road Mobile Machinery (NRMM) labels.
Water Impact
¡P To prevent any surface runoff
discharge into nearby drainage or stream;
¡P To divert all the water
generated from construction site to de-silting facilities with enough handling
capacity before discharge; and
¡P To ensure the drainage facilities
would not be clogged with waste to avoid overflow.
Waste/Chemical Management
¡P To avoid improper handling,
storage and dispose of oil drums or chemical containers on site; and
¡P To store chemical waste/waste
oil properly in the designated place before disposal.
Landscape & Visual Impact
¡P To clear the construction
materials/wastes properly within the tree protection zone.
¡P Retained trees should be
carefully protected.
¡P Dull
green fencing should be secured with no gaps or no holes.