5.1
Site
audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures on the Contract site. The
summaries of site audits are attached in Appendix
J.
5.2
Site
audits were conducted on 6th, 12th, 19th and
26th May 2020 for the Contract No. ND/2019/01 in the reporting month. For Contract
No. ND/2019/06, Site audits
were conducted on 7th, 13th, 21st,
28th May 2020 by ET in
the reporting month. A
joint site audit with the representative of the Supervisor¡¦s Representative, the Contractor, IEC and ET was carried
out on 6th May 2020 for Contract No. ND/2019/01 while joint site
audit of Contract No. ND/2019/06 was carried out on 13th May 2020.
The details of observations during site audit are shown in Table 5.1.
5.3
During
site inspections in the reporting month, no non-conformance was identified. The
observations and recommendations made during the audit sessions are summarised
in Table 5.1.
Table 5.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and
Recommendations |
Follow-up |
Contract No.: ND/2019/01 Date Observations and
Recommendations Follow-up |
|||
Water Quality |
19/05/2020 |
Clear water regularly. |
Improvement/Rectification was observed during
follow-up audit session on 26 May 2020. |
26/05/2020 |
Vehicles are not cleaned of earth, mud and
debris before leaving the site. |
Follow up action will be reported in next
reporting month. |
|
26/05/2020 |
Water should be cleared regularly. |
Follow up action will be reported in next
reporting month. |
|
Waste/ Chemical Management |
29/04/2020 |
Chemical waste should be labelled, put in
designated place properly. |
Improvement/Rectification
was observed during follow-up audit session on 6 May 2020. |
29/04/2020 |
Provide spill kit for all works area. |
Item was remarked as 200506-R01. Follow-up
action is needed to be reviewed. |
|
06/05/2020 |
Provide spill kit for all works area |
Item was remarked as 200512-R01. Follow-up
action is needed to be reviewed. |
|
12/05/2020 |
Provide spill kit for all works area. |
Item was remarked as 200519-R01. Follow-up
action is needed to be reviewed. |
|
19/05/2020 |
Provide spill kit for all works area. |
Improvement/Rectification
was observed during follow-up audit session on 26 May 2020. |
|
26/05/2020 |
Chemical waste/oil should be stored properly in
designated area. |
Follow up action will be reported in next
reporting month. |
|
Landscape and Visual |
12/05/2020 |
Retained trees should be carefully protected.
Constrcution materials should be cleared within tree protection zone. |
Improvement/Rectification
was observed during follow-up audit session on 19 May 2020. |
26/05/2020 |
Screen hoarding should be properly maintained
and provided. |
Follow up action will be reported in next
reporting month. |
Parameters |
Date |
Observations and
Recommendations |
Follow-up |
Contract No.: ND/2019/06 |
|||
Air Quality |
21/05/2020 |
The Contractor should renew the NRMM labels on
the regulated machines. |
Improvement/ Rectification was observed during
follow-up audit session on 28 May 2020. |
Water Quality |
07/05/2020 |
Water
should be cleared regularly. |
Improvement/ Rectification was observed during
follow-up audit session on 12 May 2020. |
13/05/2020 |
The Contractor should review the capacity of the
sediment tank and location of discharge point. |
Improvement/ Rectification was observed during
follow-up audit session on 21 May 2020. |
|
28/05/2020 |
Sand and silt settled in drainage system should
be removed regularly. |
Follow up action will be reported in next
reporting month. |
|
28/05/2020 |
Water in drip tray should be cleared regularly. |
Follow up action will be reported in next
reporting month. |
|
Waste / Chemical Management |
29/04/2020 |
Chemical waste should
be stored properly in suitable container at designated area and labelled
clearly. |
Improvement/ Rectification was observed during
follow-up audit session on 7 May 2020. |
07/05/2020 |
Oil leakage was found
from equipment. |
Improvement/ Rectification was observed during
follow-up audit session on 13 May 2020. |
5.4
According
to the EIA Report, EPs and the Updated EM&A Manual, the mitigation measures
detailed in the documents are recommended to be implemented during the
construction phase. An updated summary of the Environmental Mitigation
Implementation Schedule is provided in Appendix
K. The photographic records of measures as stipulated in EP to mitigate
environmental impacts in the reporting month are presented in Table 5.2.
Table 5.2 Photographic Records of
Measures
|
Environmental Permit No. EP-475/2013/A Condition 2.7 To minimise
adverse impacts on habitats of ecological importance in the vicinity of the
Project, 2m high solid dull green site barrier fences have be erected around
all active works areas |
5.5
Waste
generated from Contract No. ND/2019/06 include inert construction and
demolition (C&D) materials and non-inert C&D wastes. For Contract No.
ND/2019/01, only general refuse had been generated during reporting month.
5.6
The amount of wastes generated by
the construction works of the Contract No. ND/2019/01 and Contract No. ND/2019/06 during the reporting month is
shown in Appendix L.
5.7
The
Contractors are advised to minimize the wastes generated through the recycling
or reusing. All mitigation measures stipulated in the Updated EM&A Manual
and waste management plans shall be fully implemented. The status of
implementation of waste management and reduction measures are summited in Appendix K.