Appendix
B
- Action and Limit Levels
Table B-1       Action
and Limit Levels for
Construction Noise
| 
   Time
  Period  | 
  
   Action
  Level  | 
  
   Limit
  Level  | 
 
| 
   0700-1900 hrs on normal weekdays  | 
  
   When one documented
  complaint is received  | 
  
   75 dB(A) *  | 
 
Noted: 
If works are to be carried during restricted hours,
the conditions stipulated in the construction noise permit issued by the Noise
Control Authority have to be followed.
(*)           reduce
to 70 dB(A) for schools and 65 dB(A) during school examination periods.
 
Table B-2       Action
level in the event of LFG being detected
| 
     Parameter  | 
   
    Monitoring Results  | 
   
    Actions  | 
  
| 
   O2  | 
  
   <19% v/v  | 
  
   Increase underground ventilation to restore O2 to >19% v/v  | 
 
| 
   <18% v/v  | 
  
   Stop works, evacuate all personnel, prohibit entry, and increase
  ventilation to restore O2 level to >19%  | 
 |
| 
   CH4  | 
  
   >10% LEL  | 
  
   Prohibit hot works, increase ventilation to restore CH4 to <10% LEL  | 
 
| 
   >20% LEL  | 
  
   Stop works, evacuate all personnel, increase ventilation further to
  restore CH4 to <10%
  LEL  | 
 |
| 
   CO2  | 
  
   >0.5% v/v  | 
  
   Increase
  ventilation to restore C O2 to <0.5% v/v  | 
 
| 
   >1.5% v/v  | 
  
   Stop works, evacuate all personnel, increase ventilation further to
  restore CO2 to <0.5%  |