Table
4.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Contract No.: ND/2019/01 Date Observations and Recommendations Follow-up |
|||
Water Quality |
25/03/2020 |
To
enhance the mitigation measures provided to direct the surface runoff to
silt removal facilities. |
Follow up action will be reported in next reporting month. |
Contract No.: ND/2019/06 |
|||
Water Quality |
05/03/2020 |
Drainage
system should be cleared regularly and maintained. |
Improvement/ Rectification was observed during follow-up audit session on 11
March 2020. |
Waste
/ Chemical Management |
11/03/2020 |
Chemical
waste should be packed and held in containers of suitable design so as to
prevent leakage, spillage or escape of the contents under normal conditions
of handlings, storage and transport. Chemical waste should be stored in
designated place. |
Improvement/ Rectification was observed
during follow- up audit session on 19 March 2020. |
Landscape
& Visual Impact |
05/03/2020 |
Retained
trees should be carefully protected and construction materials should be
cleared within the protection zone. |
Improvement/ Rectification was observed
during follow- up audit session on 11 March 2020. |
11/03/2020 |
For
trees which haven’t been undertaken tree survey should be protected and
surrounded with fencing. Construction materials should also be removed from
tree protection area. |
Improvement/ Rectification was not
observed during follow- up audit session on 19 March 2020. |
|
19/03/2020 |
Retained
trees should be carefully protected. |
Improvement/ Rectification was observed
during follow- up audit session on 25 March 2020. |
|
19/03/2020 |
Dull green fencing should be secured with no
gaps or no holes. |
Improvement/ Rectification was observed
during follow- up audit session on 25 March 2020. |