Table
9.2 Observations
and Recommendations of Site Audit |
|||||
Parameters |
Date |
Observations and
Recommendations |
Follow-up |
||
Contract No.: ND/2019/01 Date Observations and
Recommendations Follow-up |
|||||
Air Quality |
30/06/2020 |
The exposed worksite and haul road should be
watered regularly. |
Improvement/Rectification
was observed during follow-up audit session on 9 July 2020. |
||
09/07/2020 |
Exposed worksites should be watered regularly. |
Improvement/Rectification
was observed during follow-up audit session on 16 July 2020. |
|||
16/07/2020 |
Exposed worksites should be watered regularly. |
Improvement/Rectification was
observed during follow-up audit session on 21 July 2020. |
|||
Water Quality |
09/07/2020 |
Vehicles are observed not cleaned of earth, mud
before leaving the Portion 4. |
Improvement/Rectification
was observed during follow-up audit session on 16 July 2020. |
||
28/07/2020 |
Contractor was reminded to clear the ponding
water at Portion 6. |
Follow-up
action is needed to be reported in the following month. |
|||
Waste/ Chemical Management |
30/06/2020 |
Chemical oil should be stored properly in
designated area. |
Improvement/Rectification
was observed during follow-up audit session on 9 July 2020. |
||
16/07/2020 |
Chemical containers should be stored, labelled
properly in designated area. |
Improvement/Rectification
was observed during follow-up audit session on 21 July 2020. |
|||
21/07/2020 |
Chemical containers should be stored, labelled
properly in designated area. |
Improvement/Rectification
was observed during follow-up audit session on 28 July 2020. |
|||
21/07/2020 |
Oil is observed leaked out from drip
tray/equipment. Oil in drip tray should be cleared regularly. |
Improvement/Rectification
was observed during follow-up audit session on 28 July 2020. |
|||
28/07/2020 |
Contractor was reminded to dispose general
refuse regularly to avoid accumulation at Portion 6. |
Follow-up
action is needed to be reported in the following month. |
|||
Ecology |
16/07/2020 |
Hoarding erection is still processing, hoarding
will be checked once in place. |
Item
was remarked as 200721-R01. Follow-up action is needed to be reviewed. |
||
21/07/2020 |
Hoarding erection is still processing, hoarding
will be kept checking. |
Item
was remarked as 200728-R03. Follow-up action is needed to be reviewed. |
|||
Contract No.: ND/2019/03 |
|||||
Air Quality |
17/07/2020 |
Stockpile of dusty materials should be covered
by impervious sheeting or sprayed with water. |
Item
was remarked as 200721-R03. Follow-up action is needed to be reviewed. |
||
21/07/2020 |
Stockpile of dusty materials should be covered
by impervious sheeting or sprayed with water. |
Improvement/Rectification
was observed during follow-up audit session on 31 July 2020. |
|||
Water Quality |
10/07/2020 |
Sandbags should be renewed to prevent surface
runoff extending beyond the construction site. |
Item
was remarked as 200717-R01. Follow-up action is needed to be reviewed. |
||
17/07/2020 |
Sandbags should be renewed to prevent surface
runoff extending beyond the construction site. |
Item
was remarked as 200721-R01. Follow-up action is needed to be reviewed. |
|||
21/07/2020 |
Sandbags should be renewed to prevent surface
runoff extending beyond the construction site. |
Improvement/Rectification
was observed during follow-up audit session on 31 July 2020. |
|||
Waste / Chemical Management |
03/07/2020 |
Chemical waste should be disposed of properly in
designated area. |
Improvement/Rectification
was observed during follow-up audit session on 10 July 2020. |
||
Landscape & Visual |
03/07/2020 |
Retained tree should be carefully protected. |
Improvement/Rectification
was observed during follow-up audit session on 10 July 2020. |
||
17/07/2020 |
To keep checking the retained trees on site
where site clearance works have been started and protect them carefully. |
Item
was remarked as 200721-R02. Follow-up action is needed to be reviewed. |
|||
21/07/2020 |
To keep checking the retained trees on site
where site clearance works have been started and protect them carefully. |
Improvement/Rectification
was observed during follow-up audit session on 31 July 2020. |
|||
Contract No.: ND/2019/06 |
|
||||
Air Quality |
23/07/2020 |
Contractor was reminded to clear the dusty
material on road surface. |
Improvement/Rectification
was observed during follow-up audit session on 30 July 2020. |
|
|
Water Quality |
26/06/2020 |
Debris and rubbish in U-channel should be
cleared and disposed of properly. |
Improvement/Rectification
was observed during follow-up audit session on 2 July 2020. |
|
|
02/07/2020 |
Rubbish in U-channel should be cleared and
disposed of properly. |
Improvement/Rectification
was observed during follow-up audit session on 9 July 2020. |
|
||
Waste / Chemical Management |
26/06/2020 |
Chemical waste, waste oil
containers should be stored properly in designated place. |
Improvement/Rectification
was observed during follow-up audit session on 2 July 2020. |
|
|
23/07/2020 |
Chemical should be stored at
designated area or with drip tray to prevent chemical
leakage. |
Improvement/Rectification
was observed during follow-up audit session on 30 July 2020. |
|
||
30/07/2020 |
Stagnant water in drip tray
should be cleared properly. |
Follow-up