1.
This is the 9th monthly
Environmental Monitoring and Audit (EM&A) Report under First Phase
Development of Kwu Tung North (KTN) and Fanling North (FLN) New Development Areas (NDAs),
comprising the Advance Works and First Stage Works (the Project). This report
was prepared by Wellab Limited under “Service
Contract No. NDO 04/2019 Environmental Team for Environmental Monitoring and
Audit Works in Construction Phase for the First Phase Development of KTN and FLN
NDAs” (hereinafter called the “Service
Contract”). This report documents the findings of Environmental Monitoring and
Audit (EM&A) work conducted in July 2020.
2.
During the reporting month, the following Works
Contracts under relevant Environmental Permit(s) were undertaken for the
Project:
Table I Works
Contracts under relevant Environmental Permit(s) in the Reporting Month
Works Contracts |
Environmental Permit No. |
Designated Project (DP) |
Commencement date of construction |
Contract No.
ND/2019/01 -
Kwu Tung North New Development Area,
Phase 1: Site Formation and Infrastructure Works |
Kwu Tung North New Development Area Road D1 to
D5 |
1st June 2020 |
|
Utilization of Treated Sewage Effluent (TSE)
from Shek Wu Hui Sewage Treatment Works |
23rd March 2020 |
||
Contract No.
ND/2019/03 -
Kwu Tung North New Development Area,
Phase 1: Development of Long Valley Nature Park |
Kwu Tung North New Development Area Road D1 to
D5 |
3rd July 2020 |
|
Contract No.
ND/2019/06 - Fanling North
New Development Area, Phase 1: Re-provisioning of North District Temporary
Wholesale Market for Agricultural Products |
Reprovision of temporary Wholesale Market in Fanling North New Development Area |
29th October 2019 |
3.
A summary of the EM&A activities in
this reporting month is listed in Table
II below:
Table II Summary
Table for EM&A Activities in the Reporting Month
EM&A Activities |
Works Contracts |
|||
ND/2019/01 |
ND/2019/03 |
ND/2019/06 |
||
1-hr Total Suspended Particulates (TSP)
Monitoring |
2nd,8th,14th,20th,24th,30th
July 2020 |
N/A |
||
24-hr TSP Monitoring |
2nd,8th,14th,20th,24th,30th
July 2020 |
N/A |
||
24-hr RSP (Ambient Arsenic) Monitoring for Land
Contamination |
6th,10th,16th,22nd,28th
July 2020 |
N/A |
||
Noise Monitoring |
2nd,8th,14th,24th,30th
July 2020 |
|||
Landfill Gas Monitoring |
7th July 2020 |
N/A |
N/A |
|
Ecological Survey |
Monitoring of Measures
to Minimise Disturbance to Water Birds on Sheung
Yue River, and Long Valley |
N/A* |
7th,13th,20th,27th
July 2020 |
N/A* |
Monitoring of Measures
to Minimise
Impacts to Ma Tso Lung Stream |
29th July 2020 |
N/A* |
||
Monitoring of Measures
to Minimise
Impacts on Ecological Sensitive
Habitats from Disturbance and
Pollution |
17th July 2020 |
N/A* |
N/A* |
|
Environmental Site Inspection |
9th,16th,21st,28th
July 2020 |
3rd,10th,17th,21st,31st
July 2020 |
2nd,9th,15th,23rd,30th
July 2020 |
Remark:
N/A – No relevant
monitoring is required according to updated EM&A Manual
N/A* – No relevant monitoring is required according
to Baseline Ecological Monitoring Plan (Table 3.1)
4.
Summary of the environmental exceedances
of the reporting month is tabulated in Table
III.
Table III Summary
Table for Events Recorded in the Reporting Month
Environmental Monitoring |
Parameter |
No. of non-project related
Exceedances |
Total No. of non-project related Exceedances |
No. of Exceedance
related to the Construction Works of the Contract |
Total No. of Exceedance related
to the Construction Works of the Contract |
||
Action Level |
Limit Level |
Action Level |
Limit Level |
||||
Air Quality |
1-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
24-hr TSP |
0 |
0 |
0 |
0 |
0 |
0 |
|
24-hr RSP (Ambient Arsenic) |
0 |
0 |
0 |
0 |
0 |
0 |
|
Noise |
Leq(30min) |
0 |
0 |
0 |
0 |
0 |
0 |
Landfill Gas |
O2 |
0 |
0 |
0 |
0 |
0 |
0 |
CH4 |
|||||||
CO2 |
5. All
construction air quality monitoring was conducted as scheduled in the reporting
month. No Action/Limit Level exceedance was recorded.
6.
All construction noise monitoring was
conducted as scheduled in the reporting month. No Action/Limit Level exceedance
was recorded.
7.
No construction of channel for alternation
of natural streams was carried out in the reporting month. Therefore, no water
quality monitoring was conducted. For the details, please refer to Section 5.
8.
All ambient arsenic monitoring was
conducted as scheduled in the reporting month. No Action/Limit Level exceedance
was recorded.
9.
Monitoring of landfill gases in the reporting
month was carried out by the Contractor under ND/2019/01 at excavation
location, Portion 6b. No Limit Level exceedance was recorded.
10. All
ecological monitoring was conducted as scheduled in the reporting month. Action
and limit level will be compared after the issue of Final Baseline Ecological
Report. The ecological monitoring result in the Reporting Month is shown in Appendix H.
11.
One environmental
complaint was received in the reporting month.
12.
No notification of summons or successful
prosecutions was received in the reporting month.
13.
This report has been prepared in
compliance with the reporting requirements for the subsequent monthly EM&A
Report as required by the “Updated Environmental Monitoring and Audit Manual
for Advance and First Stage Works of Kwu Tung North
and Fanling North New Development Areas” (Updated EM&A
Manual).
14.
The major site activities for the coming two
months are shown in Table IV.
Table IV Summary Table for Site
Activities in the coming Two Months
Contract No. |
Site Activities (August
and September 2020) |
ND/2019/01 |
(a)
Ground
Investigation in Portion 1f; (b)
Site Clearance,
Ground Investigation in Portion 2 (c)
Tree
Survey, Site Clearance in Portion 3 (d)
Sampling
and testing for site trial for In-situ cement mixing (ICM) for soil treatment
works in Portion 4 (e)
Site
Clearance, Ground Investigation in Portion 5 (f)
Site Clearance,
Ground Investigation in Portion 6a; (g)
Completion
of Soil Treatment Facility, Pilot trial for Ex-situ cement mixing (ECM) for
soil treatment, provide soil treatment for HAC soil by ECM in Portion 6b; (h)
Site
Clearance, Tree felling, Construction of temporary road for alternative Po
Lau Road, Land contamination assessment in Area T1, T2 & T3 in Portion 7; (i)
Ground
Investigation, Construction of Retaining Wall in Portion 8a; (j)
Site
Clearance, Ground Investigation, stockpile of soil in Portion 9c; (k)
Site
Clearance, Tree felling, Excavation in Portion 10a; and (l)
Site Clearance
in 10b |
ND/2019/03 |
(a)
Road and Drainage work in Portion 1; (b)
Initial Restoration Work at Long Valley,
Construction works of storage shed and Type 2 Storage House, construction of
metal wire railing, site clearance in Portion 2 to 20; (c)
Pre-relocation
survey in Portion 23 and 24 |
ND/2019/06 |
(a)
Construction
of Management Office Building; (b)
Installation
of entrance gate at new run-in/out (c)
Breaking up the concrete surface and disposal of
C&D material off site at Portion 3 (d)
Construction of footings of steel canopy of final
stage market (e)
Ground investigation works at Portion 3 (f)
Tree felling at Portion 3 and 6. |