7.1
The EM&A Report presents the EM&A work
undertaken in February 2020 in accordance
with Updated EM&A Manual.
7.2
No Action/Limit Level exceedance was recorded
for construction noise.
7.3
Environmental
site inspections were conducted on 6th, 12th, 20th,
27th February 2020 by ET in the reporting month.
7.4
There
was no environmental complaint, no notification of summons or successful prosecution
received in the reporting month.
7.5
The
ET would keep track on the EM&A programme to
ensure compliance of environmental requirements and the proper implementation
of all necessary mitigation measures.
7.6
According to the environmental audit performed
in the reporting month, the following recommendations were made:
Air Quality Impact
¡P To enhance the dust suppression
measures such as water spraying on all haul roads and expose work site area;
and
¡P To maintain the impervious
material to cover the stockpile of dusty materials;
and
¡P To ensure all regulated
machines with valid Non-road Mobile Machinery (NRMM) labels.
Water Impact
¡P To prevent any surface runoff
discharge into nearby drainage or stream;
¡P To divert all the water
generated from construction site to de-silting facilities with enough handling
capacity before discharge; and
¡P To ensure the drainage facilities
would not be clogged with waste to avoid overflow.
Waste/Chemical Management
¡P To avoid improper handling,
storage and dispose of oil drums or chemical containers on site; and
¡P To store chemical waste/waste
oil properly in the designated place before disposal.
Landscape & Visual Impact
¡P To clear the construction
materials/wastes properly within the tree protection zone.