7                CONCLUSIONS AND RECOMMENDATIONS

 

Conclusions

 

7.1          The EM&A Report presents the EM&A work undertaken in February 2020 in accordance

with Updated EM&A Manual.

 

7.2          No Action/Limit Level exceedance was recorded for construction noise.

 

7.3          Environmental site inspections were conducted on 6th, 12th, 20th, 27th February 2020 by ET in the reporting month.

 

7.4          There was no environmental complaint, no notification of summons or successful prosecution received in the reporting month.

 

7.5          The ET would keep track on the EM&A programme to ensure compliance of environmental requirements and the proper implementation of all necessary mitigation measures.

 

Recommendations

 

7.6          According to the environmental audit performed in the reporting month, the following recommendations were made:

 

Air Quality Impact

 

¡P  To enhance the dust suppression measures such as water spraying on all haul roads and expose work site area; and

¡P  To maintain the impervious material to cover the stockpile of dusty materials; and

¡P  To ensure all regulated machines with valid Non-road Mobile Machinery (NRMM) labels.

 

 

Water Impact

 

¡P  To prevent any surface runoff discharge into nearby drainage or stream;

¡P  To divert all the water generated from construction site to de-silting facilities with enough handling capacity before discharge; and

¡P  To ensure the drainage facilities would not be clogged with waste to avoid overflow.

 

 

Waste/Chemical Management

 

¡P  To avoid improper handling, storage and dispose of oil drums or chemical containers on site; and

¡P  To store chemical waste/waste oil properly in the designated place before disposal.

 

Landscape & Visual Impact

 

¡P  To clear the construction materials/wastes properly within the tree protection zone.