4.1
Site
audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures on the Contract site. The
summaries of site audits are attached in Appendix
I.
4.2
Site
audits were conducted on 6th, 12th, 20th, 27th
February 2020 by ET after the commencement of construction works for the Contract
No. ND/2019/06. A joint site audit with the
representative of the Supervisor¡¦s
Representative, the Contractor, IEC and ET was carried out on 12th February
2020. The details of observations during site audit are shown in Table 4.1.
4.3
During
site inspections in the reporting month, no non-conformance was identified. The
observations and recommendations made during the audit sessions are summarised in Table
4.1.
Table 4.1 Observations and Recommendations of Site
Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Air Quality |
27/02/2020 |
The excavated or stockpile
of dusty materials should be covered entirely by impervious sheeting or
sprayed with water. |
Follow up action will be reported in next reporting month. |
Valid Non-road Mobile
Machinery (NRMM) labels should be displayed on regulated machines (RO-04) and
(EX-14). |
|||
Water Quality |
06/02/2020 |
Waste was found in temporary
ditch for runoff discharge into appropriate watercourse. The Contractor
should clean the channel at the site regularly at the site exit. |
Improvement/
Rectification was observed during follow-up audit session on 12 February
2020. |
12/02/2020 |
Sandbag should be placed
along the U-channel to prevent direct discharge into nearby watercourse from
site. |
Improvement/Rectification was observed during
follow- up audit session on 20 February 2020. |
|
20/02/2020 |
Muddy water at the cut-off
drain at the site entrance was observed overflow. The Contractor was reminded
to review the capacity of the drain and rectify it ASSP. |
Improvement/ Rectification was observed
during follow- up audit session on 27
February 2020. |
|
Waste / Chemical Management |
06/02/2020 |
Chemical waste, waste oil
are not stored properly in the designated place. The Contractor should
provide suitable area for temporary storage of chemical waste. |
Improvement/
Rectification was observed during follow- up audit session on 12 February
2020. |
20/02/2020 |
The Contractor should store
the chemical waste container properly at the chemical waste storage area
before disposal. |
Improvement/
Rectification was observed during follow-
up audit session on 27 February
2020. |
|
27/02/2020 |
The excavated or stockpile
of dusty materials should be covered entirely by impervious sheeting or
sprayed with water. |
Follow up action will be reported in next reporting month. |
|
Landscape & Visual Impact |
20/02/2020 |
The Contractor should clear
the construction materials/wastes properly within the tree protection zone. |
Improvement/
Rectification was observed during follow-
up audit session on 27 February
2020. |
4.4
According
to the EIA Report, EP and the EM&A Manual, the mitigation measures detailed
in the documents are recommended to be implemented during the construction
phase. An updated summary of the Environmental Mitigation Implementation
Schedule is provided in Appendix J.
The photographic records of measures to mitigate environmental impacts are
presented in Table 4.2.
Table 4.2 Photographic Records of
Measures
|
Environmental Permit
No. EP-475/2013 Condition 2.7 To minimise adverse
impacts on habitats of ecological importance in the vicinity of the Project,
2m high solid dull green site barrier fences have be erected around all
active works areas |
4.5
Waste
generated from Contract No. ND/2019/06 includes inert construction and
demolition (C&D) materials and non-inert C&D wastes.
4.6
The amount of wastes generated by
the construction works of the Contract
No. ND/2019/06 during the reporting month is
shown in Appendix K.
4.7
The
Contractors are advised to minimize the wastes generated through the recycling
or reusing. All mitigation measures stipulated in the Updated EM&A Manual
and waste management plans shall be fully implemented. The status of
implementation of waste management and reduction measures are summited in Appendix J.