4                ENVIRONMENTAL SITE INSPECTION

 

Site Audits

 

4.1          Site audits were carried out by ET on weekly basis to monitor the timely implementation of proper environmental management practices and mitigation measures on the Contract site.  The summaries of site audits are attached in Appendix I.

 

4.2          Site audits were conducted on 6th, 12th, 20th, 27th February 2020 by ET after the commencement of construction works for the Contract No. ND/2019/06. A joint site audit with the representative of the Supervisor¡¦s Representative, the Contractor, IEC and ET was carried out on 12th February 2020. The details of observations during site audit are shown in Table 4.1.

 

4.3          During site inspections in the reporting month, no non-conformance was identified. The observations and recommendations made during the audit sessions are summarised in Table 4.1.

Table 4.1     Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

 

 

 

27/02/2020

The excavated or stockpile of dusty materials should be covered entirely by impervious sheeting or sprayed with water.

Follow up action will be reported in next reporting month.

Valid Non-road Mobile Machinery (NRMM) labels should be displayed on regulated machines (RO-04) and (EX-14). 

 

 

 

Water Quality

 

 

 

 

 

06/02/2020

Waste was found in temporary ditch for runoff discharge into appropriate watercourse. The Contractor should clean the channel at the site regularly at the site exit.

Improvement/ Rectification was observed during follow-up audit session on 12 February 2020.

 

12/02/2020

Sandbag should be placed along the U-channel to prevent direct discharge into nearby watercourse from site.

Improvement/Rectification was observed during follow- up audit session on 20 February 2020.

 

20/02/2020

Muddy water at the cut-off drain at the site entrance was observed overflow. The Contractor was reminded to review the capacity of the drain and rectify it ASSP.

Improvement/ Rectification was observed during follow- up audit session on 27 February 2020.

 

Waste / Chemical Management

 

06/02/2020

Chemical waste, waste oil are not stored properly in the designated place. The Contractor should provide suitable area for temporary storage of chemical waste.

Improvement/ Rectification was observed during follow- up audit session on 12 February 2020.

 

20/02/2020

The Contractor should store the chemical waste container properly at the chemical waste storage area before disposal.

Improvement/ Rectification was observed during follow- up audit session on 27 February 2020.

27/02/2020

The excavated or stockpile of dusty materials should be covered entirely by impervious sheeting or sprayed with water.

Follow up action will be reported in next reporting month.

 

Landscape & Visual Impact

 

20/02/2020

 

The Contractor should clear the construction materials/wastes properly within the tree protection zone.

Improvement/ Rectification was observed during follow- up audit session on 27 February 2020.

 

Implementation Status of Environmental Mitigation Measures

4.4          According to the EIA Report, EP and the EM&A Manual, the mitigation measures detailed in the documents are recommended to be implemented during the construction phase. An updated summary of the Environmental Mitigation Implementation Schedule is provided in Appendix J. The photographic records of measures to mitigate environmental impacts are presented in Table 4.2.

 

Table 4.2     Photographic Records of Measures

 

Environmental Permit No. EP-475/2013 Condition 2.7

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences have be erected around all active works areas

Solid and Liquid Waste Management Status

4.5          Waste generated from Contract No. ND/2019/06 includes inert construction and demolition (C&D) materials and non-inert C&D wastes.

 

4.6          The amount of wastes generated by the construction works of the Contract No. ND/2019/06 during the reporting month is shown in Appendix K.

 

4.7          The Contractors are advised to minimize the wastes generated through the recycling or reusing. All mitigation measures stipulated in the Updated EM&A Manual and waste management plans shall be fully implemented. The status of implementation of waste management and reduction measures are summited in Appendix J.