Table 4.1 Observations and Recommendations of Site
Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Air Quality |
27/02/2020 |
The excavated or stockpile
of dusty materials should be covered entirely by impervious sheeting or
sprayed with water. |
Follow up action will be reported in next reporting month. |
Valid Non-road Mobile
Machinery (NRMM) labels should be displayed on regulated machines (RO-04) and
(EX-14). |
|||
Water Quality |
06/02/2020 |
Waste was found in temporary
ditch for runoff discharge into appropriate watercourse. The Contractor
should clean the channel at the site regularly at the site exit. |
Improvement/
Rectification was observed during follow-up audit session on 12 February
2020. |
12/02/2020 |
Sandbag should be placed
along the U-channel to prevent direct discharge into nearby watercourse from
site. |
Improvement/Rectification was observed during
follow- up audit session on 20 February 2020. |
|
20/02/2020 |
Muddy water at the cut-off
drain at the site entrance was observed overflow. The Contractor was reminded
to review the capacity of the drain and rectify it ASSP. |
Improvement/ Rectification was observed
during follow- up audit session on 27
February 2020. |
|
Waste / Chemical Management |
06/02/2020 |
Chemical waste, waste oil
are not stored properly in the designated place. The Contractor should
provide suitable area for temporary storage of chemical waste. |
Improvement/
Rectification was observed during follow- up audit session on 12 February
2020. |
20/02/2020 |
The Contractor should store
the chemical waste container properly at the chemical waste storage area
before disposal. |
Improvement/
Rectification was observed during follow-
up audit session on 27 February
2020. |
|
27/02/2020 |
The excavated or stockpile
of dusty materials should be covered entirely by impervious sheeting or
sprayed with water. |
Follow up action will be reported in next reporting month. |
|
Landscape & Visual Impact |
20/02/2020 |
The Contractor should clear
the construction materials/wastes properly within the tree protection zone. |
Improvement/
Rectification was observed during follow-
up audit session on 27 February
2020. |