9                ENVIRONMENTAL SITE INSPECTION

Site Audits

9.1          Site audits were carried out by ET on weekly basis to monitor the timely implementation of proper environmental management practices and mitigation measures on the Contract site.  The summaries of site audits are presented in Table 9.1 and Appendix L.

 

Table 9.1     Summary of Site Audit

Environmental Site Inspection

Works Contracts

ND/2019/01

ND/2019/02

ND/2019/03

ND/2019/05

ND/2019/06

Weekly site audit with representative of the Supervisor¡¦s Representative and the Contractor

1st, 8th, 15th, 22nd, 29th December 2020

2nd, 9th, 18th, 23rd, 30th December 2020

4th, 11th, 15th, 22nd, 30th  December 2020

9th, 14th, 21st, 28th December 2020

3rd, 10th, 14th, 24th, 31st  December 2020

Joint Site Audit with representative of the Supervisor¡¦s Representative, the Contractor and IEC

8th December 2020

18th December 2020

15th December 2020

9th December 2020

14th December 2020

 

9.2          During site inspections in the reporting month, no non-conformance was identified. The observations and recommendations made during the audit sessions are summarised in Table 9.2.


 

Table 9.2 Observations and Recommendations during Site Audits

 

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

Date

Observations and Recommendations

Follow-up

Air Quality

01/12/2020

Dusty stockpile should be covered entirely by impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 8 December 2020.

08/12/2020

NRMM label was observed faded. Contractor was reminded to check and replace valid NRMM label on regulated machine.

Improvement/Rectification was observed during follow-up audit session on 15 December 2020.

15/12/2020

To enhance dust control measures at stockpiling area at Portion 7.

Improvement/Rectification was observed during follow-up audit session on 22 December 2020.

29/12/2020

To replace the impervious materials for covering and sheltering stock of more than 20 bags of cement on top and 3 sides. (Portion 5)

Follow-up action is needed to be reported in the following month.

Waste/ Chemical Management

15/12/2020

To clear general refuse at Portion 8A regularly.

Improvement/Rectification was observed during follow-up audit session on 22 December 2020.

29/12/2020

Drip tray should be provided for chemical storage at Portion 8a.

Follow-up action is needed to be reported in the following month.

29/12/2020

To provide adequate capacity of storage area with drip trays for chemical storage. (Portion 5)

Follow-up action is needed to be reported in the following month.

Land Contamination

01/12/2020

Arsenic-containing soil should be covered entirely by impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 8 December 2020.

Contract No.: ND/2019/02

Air Quality

25/11/2020

Slope should be covered entirely by impervious sheeting.

Improvement/Rectification was observed during follow-up audit session on 2 December 2020.

09/12/2020

NRMM Label was observed faded Contractor was reminded to replace the NRMM Label.

Item was remarked as 201218-R01. Follow-up action is needed to be reviewed.

18/12/2020

NRMM Label was observed faded Contractor was reminded to replace the NRMM Label.

Improvement/Rectification was observed during follow-up audit session on 23 December 2020.

Water Quality

02/12/2020

Contactor was reminded to clear the water tank and replace the water pump to avoid overflowing.

Improvement/Rectification was observed during follow-up audit session on 9 December 2020.

09/12/2020

Sand bag should be provided along the steep site boundary to avoid any site runoff from entering into nearby waterbody.

Item was remarked as 201218-R02. Follow-up action is needed to be reviewed.

09/12/2020

Contactor was reminded to enhance water control measure to prevent any discharge of wastewater into nearby watercourse.

Improvement/Rectification was observed during follow-up audit session on 18 December 2020.

18/12/2020

Sand bag should be provided along the steep site boundary to avoid any site runoff from entering into nearby waterbody.

Improvement/Rectification was observed during follow-up audit session on 23 December 2020.

Waste / Chemical Management

30/12/2020

Contractor was reminded to clear the debris in channel.

Follow-up action is needed to be reported in the following month.

Ecology

09/12/2020

Hoarding erection is still processing, hoarding will be check once in place.

Item was remarked as 201218-R03. Follow-up action is needed to be reviewed.

18/12/2020

Hoarding erection is still processing, hoarding will be check once in place.

Item was remarked as 201223-R01. Follow-up action is needed to be reviewed.

23/12/2020

Hoarding was erected at part of active works area. Hoarding erection is still processing and will be checked and reviewed.

Item was remarked as 201230-R01. Follow-up action is needed to be reviewed.

30/12/2020

Hoarding was erected at part of active works area. Hoarding erection is still processing and will be checked and reviewed.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Air Quality

15/12/2020

Contractor was reminded to clear the dusty materials from the surface of roads.

Improvement/Rectification was observed during follow-up audit session on 22 December 2020.

Landscape & Visual

04/12/2020

Retained tree should be carefully protected.

Improvement/Rectification was observed during follow-up audit session on 11 December 2020.

15/12/2020

Retained tree should be carefully protected.

Improvement/Rectification was observed during follow-up audit session on 22 December 2020.

Contract No.: ND/2019/05

Air Quality

14/12/2020

Dusty road leading to vehicle entrance or exit of construction site was observed. Public haul road should be kept clear of dust.

Improvement/Rectification was observed during follow-up audit session on 21 December 2020.

28/12/2020

NRMM label was observed faded. Contractor was reminded to display valid NRMM label. (Portion 6)

Follow-up action is needed to be reported in the following month.

28/12/2020

To keep public road near site entrance clean and free of dust.

Follow-up action is needed to be reported in the following month.

Water Quality

14/12/2020

To clear the cut-off drains near wheel washing area regularly.

Improvement/Rectification was observed during follow-up audit session on 21 December 2020.

14/12/2020

To provide sandbags around works area to prevent any muddy runoff to public road nearby.

Improvement/Rectification was observed during follow-up audit session on 21 December 2020.

21/12/2020

To avoid any wastewater from wheel washing facility from discharging into public road.

Improvement/Rectification was observed during follow-up audit session on 28 December 2020.

Construction Noise Impact

21/12/2020

To provide noise isolating materials for sheet piling work.

Improvement/Rectification was observed during follow-up audit session on 28 December 2020.

Waste / Chemical Management

30/11/2020

Drip trays should be provided for chemical storage at Portion 11.

Improvement/Rectification was observed during follow-up audit session on 9 December 2020.

21/12/2020

Provide drip trays for chemical storage to prevent chemical leakage.

Improvement/Rectification was observed during follow-up audit session on 28 December 2020.

28/12/2020

To store chemical containers at area with drip tray provided. (Portion 6)

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/06

Water Quality

10/12/2020

Contractor was reminded to prevent surface runoff discharge into the river.

Improvement/Rectification was observed during follow-up audit session on 14 December 2020.

14/12/2020

Contractor was reminded to cover the exposed slope surface to prevent dust emission.

Improvement/Rectification was observed during follow-up audit session on 24 December 2020.

24/12/2020

Contractor was reminded to cover the exposed slope surface to prevent dust emission.

Improvement/Rectification was observed during follow-up audit session on 31 December 2020.

Waste / Chemical Management

03/12/2020

To provide drip tray for chemical storage.

Improvement/Rectification was observed during follow-up audit session on 10 December 2020.

10/12/2020

Chemical should be stored at designated area or with drip tray to prevent chemical leakage.

Improvement/Rectification was observed during follow-up audit session on 14 December 2020.

14/12/2020

Chemical should be stored

 at designated area or with drip tray to prevent chemical leakage.

Improvement/Rectification was observed during follow-up audit session on 24 December 2020.

 

Implementation Status of Environmental Mitigation Measures

9.3          According to the EIA Report, EPs and the Updated EM&A Manual, the mitigation measures detailed in the documents are recommended to be implemented during the construction phase. An updated summary of the Environmental Mitigation Implementation Schedule is provided in Appendix M. The photographic records of measures as stipulated in EP to mitigate environmental impacts in the reporting month are presented in Table 9.3.

 

Table 9.3     Photographic Records and Implementation Status of Measures

EP No.

Condition

Photographic Record

Implementation Status

EP-468/2013/A

2.11

86e53520-52c7-42d5-ab95-fffb04628fd4 8b9a553b-e781-49e1-b06e-ba7a606c66b2

 

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 12)

^[1]

EP-473/2013/A

2.13

IMG_9279 IMG_9276

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 14)

^[1]

EP-475/2013/A

2.7

975bc0b8-fb9b-41e3-aad3-3cb05fdae591 e031879b-03d4-4668-8e0e-8d2ca4386f41

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 15)

^[1]

Implementation status:

^         Mitigation measure was fully implemented

*         Observation/reminder was made during site audit but improved/rectified by the contractor

#         Observation/reminder was made during site audit but not yet improved/ rectified by       the            contractor

X        Non-compliance of mitigation measure

¡P         Non-compliance but rectified by the contractor

N/A   Not Applicable at this stage as no such site activities were conducted in the reporting     period

[1]:       Barrier fences might be subjected to change according to phasing plan designed at detailed design stage

 

9.4          Under EP-466/2013 (Condition 2.9), EP-467/2013/A (Condition 2.9), EP-469/2013 (Condition 2.7) to minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas. As the Works programme under above EPs were still under preparation work and the barrier fences erection was still progressing in the Reporting Month, 2m high solid dull green site barrier fences will be checked once in place. The Hoarding Plan of the above EPs are shown in Figure 10, Figure 11 and Figure 13 respectively.

Solid and Liquid Waste Management Status

9.5          Waste generated from Contract No. ND/2019/01, ND/2019/02, ND/2019/03, ND/2019/05 and ND/2019/06 include inert construction and demolition (C&D) materials and non-inert C&D wastes in the Reporting Month.

 

9.6          The amount of wastes generated by the construction works of the Contract No. ND/2019/01, ND/2019/02, ND/2019/03, ND/2019/05 and Contract No. ND/2019/06 during the reporting month is shown in Appendix N.

 

9.7          The Contractors are advised to minimize the wastes generated through the recycling or reusing. All mitigation measures stipulated in the Updated EM&A Manual and waste management plans shall be fully implemented. The status of implementation of waste management and reduction measures are summited in Appendix M.