9.1
Site
audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures on the Contract site. The
summaries of site audits are presented in Table 9.1 and Appendix L.
Table 9.1 Summary of Site Audit
Environmental
Site Inspection |
Works Contracts |
||||
ND/2019/01 |
ND/2019/02 |
ND/2019/03 |
ND/2019/05 |
ND/2019/06 |
|
Weekly
site audit with representative of the Supervisor¡¦s Representative and the
Contractor |
1st, 8th, 15th,
22nd, 29th December 2020 |
2nd, 9th, 18th,
23rd, 30th December 2020 |
4th, 11th, 15th,
22nd, 30th December
2020 |
9th, 14th, 21st,
28th December 2020 |
3rd, 10th, 14th,
24th, 31st December
2020 |
Joint
Site Audit with representative of the Supervisor¡¦s Representative, the
Contractor and IEC |
8th
December 2020 |
18th
December 2020 |
15th
December 2020 |
9th
December 2020 |
14th
December 2020 |
9.2
During
site inspections in the reporting month, no non-conformance was identified. The
observations and recommendations made during the audit sessions are summarised
in Table 9.2.
Table 9.2 Observations and Recommendations
during Site Audits |
|||
|
Date |
Observations and
Recommendations |
Follow-up |
Contract No.: ND/2019/01 Date Observations and
Recommendations Follow-up |
|||
Air Quality |
01/12/2020 |
Dusty stockpile should be covered entirely by
impervious sheeting. |
Improvement/Rectification was
observed during follow-up audit session on 8 December 2020. |
08/12/2020 |
NRMM label was observed faded. Contractor was reminded to check and
replace valid NRMM label on regulated machine. |
Improvement/Rectification was
observed during follow-up audit session on 15 December 2020. |
|
15/12/2020 |
To enhance dust control measures at stockpiling area at Portion 7. |
Improvement/Rectification was
observed during follow-up audit session on 22 December 2020. |
|
29/12/2020 |
To replace the impervious materials for covering and sheltering stock
of more than 20 bags of cement on top and 3 sides. (Portion 5) |
Follow-up action is needed to be
reported in the following month. |
|
Waste/ Chemical Management |
15/12/2020 |
To clear general refuse at Portion 8A regularly. |
Improvement/Rectification was
observed during follow-up audit session on 22 December 2020. |
29/12/2020 |
Drip tray should be provided for chemical storage at Portion 8a. |
Follow-up action is needed to be
reported in the following month. |
|
29/12/2020 |
To provide adequate capacity of storage area with drip trays for
chemical storage. (Portion 5) |
Follow-up action is needed to be
reported in the following month. |
|
Land Contamination |
01/12/2020 |
Arsenic-containing soil should be covered
entirely by impervious sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 8 December 2020. |
Contract
No.: ND/2019/02 |
|||
Air Quality |
25/11/2020 |
Slope should be covered entirely by impervious
sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 2 December 2020. |
09/12/2020 |
NRMM Label was observed faded Contractor was
reminded to replace the NRMM Label. |
Item
was remarked as 201218-R01. Follow-up action is needed to be reviewed. |
|
18/12/2020 |
NRMM Label was observed faded Contractor was
reminded to replace the NRMM Label. |
Improvement/Rectification
was observed during follow-up audit session on 23 December 2020. |
|
Water Quality |
02/12/2020 |
Contactor was reminded to clear the water tank
and replace the water pump to avoid overflowing. |
Improvement/Rectification
was observed during follow-up audit session on 9 December 2020. |
09/12/2020 |
Sand bag should be provided along the steep site
boundary to avoid any site runoff from entering into nearby waterbody. |
Item
was remarked as 201218-R02. Follow-up action is needed to be reviewed. |
|
09/12/2020 |
Contactor was reminded to enhance water control
measure to prevent any discharge of wastewater into nearby watercourse. |
Improvement/Rectification
was observed during follow-up audit session on 18 December 2020. |
|
18/12/2020 |
Sand bag should be provided along the steep site
boundary to avoid any site runoff from entering into nearby waterbody. |
Improvement/Rectification
was observed during follow-up audit session on 23 December 2020. |
|
Waste / Chemical Management |
30/12/2020 |
Contractor was reminded to clear the debris in
channel. |
Follow-up
action is needed to be reported in the following month. |
Ecology |
09/12/2020 |
Hoarding erection is still processing, hoarding
will be check once in place. |
Item
was remarked as 201218-R03. Follow-up action is needed to be reviewed. |
18/12/2020 |
Hoarding erection is still processing, hoarding
will be check once in place. |
Item
was remarked as 201223-R01. Follow-up action is needed to be reviewed. |
|
23/12/2020 |
Hoarding was erected at part of active works
area. Hoarding erection is still processing and will be checked and
reviewed. |
Item
was remarked as 201230-R01. Follow-up action is needed to be reviewed. |
|
30/12/2020 |
Hoarding was erected at part of active works
area. Hoarding erection is still processing and will be checked and
reviewed. |
Follow-up
action is needed to be reported in the following month. |
|
Contract No.: ND/2019/03 |
|||
Air Quality |
15/12/2020 |
Contractor was reminded to clear the dusty
materials from the surface of roads. |
Improvement/Rectification
was observed during follow-up audit session on 22 December 2020. |
Landscape & Visual |
04/12/2020 |
Retained
tree should be carefully protected. |
Improvement/Rectification
was observed during follow-up audit session on 11 December 2020. |
15/12/2020 |
Retained
tree should be carefully protected. |
Improvement/Rectification
was observed during follow-up audit session on 22 December 2020. |
|
Contract No.: ND/2019/05 |
|||
Air Quality |
14/12/2020 |
Dusty road leading to vehicle entrance or exit
of construction site was observed. Public haul road should be kept clear of
dust. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2020. |
28/12/2020 |
NRMM label was observed faded. Contractor was
reminded to display valid NRMM label. (Portion 6) |
Follow-up
action is needed to be reported in the following month. |
|
28/12/2020 |
To keep public road near site entrance clean and
free of dust. |
Follow-up
action is needed to be reported in the following month. |
|
Water Quality |
14/12/2020 |
To clear the cut-off drains near wheel washing
area regularly. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2020. |
14/12/2020 |
To provide sandbags around works area to prevent
any muddy runoff to public road nearby. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2020. |
|
21/12/2020 |
To avoid any wastewater from wheel washing
facility from discharging into public road. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2020. |
|
Construction Noise Impact |
21/12/2020 |
To provide noise isolating materials for sheet
piling work. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2020. |
Waste / Chemical Management |
30/11/2020 |
Drip trays should be provided for chemical
storage at Portion 11. |
Improvement/Rectification
was observed during follow-up audit session on 9 December 2020. |
21/12/2020 |
Provide drip trays for chemical storage to
prevent chemical leakage. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2020. |
|
28/12/2020 |
To store chemical containers at area with drip
tray provided. (Portion 6) |
Follow-up
action is needed to be reported in the following month. |
|
Contract No.: ND/2019/06 |
|||
Water Quality |
10/12/2020 |
Contractor
was reminded to prevent surface runoff discharge into the river. |
Improvement/Rectification
was observed during follow-up audit session on 14 December 2020. |
14/12/2020 |
Contractor
was reminded to cover the exposed slope surface to prevent dust emission. |
Improvement/Rectification
was observed during follow-up audit session on 24 December 2020. |
|
24/12/2020 |
Contractor
was reminded to cover the exposed slope surface to prevent dust emission. |
Improvement/Rectification
was observed during follow-up audit session on 31 December 2020. |
|
Waste / Chemical Management |
03/12/2020 |
To provide drip tray for chemical storage. |
Improvement/Rectification
was observed during follow-up audit session on 10 December 2020. |
10/12/2020 |
Chemical should be stored at designated area or
with drip tray to prevent chemical leakage. |
Improvement/Rectification
was observed during follow-up audit session on 14 December 2020. |
|
14/12/2020 |
Chemical should be stored at
designated area or with drip tray to prevent chemical leakage. |
Improvement/Rectification
was observed during follow-up audit session on 24 December 2020. |
9.3
According
to the EIA Report, EPs and the Updated EM&A Manual, the mitigation measures
detailed in the documents are recommended to be implemented during the
construction phase. An updated summary of the Environmental Mitigation
Implementation Schedule is provided in Appendix
M. The photographic records of measures as stipulated in EP to mitigate
environmental impacts in the reporting month are presented in Table 9.3.
Table 9.3 Photographic Records and
Implementation Status of Measures
EP No. |
Condition |
Photographic Record |
Implementation Status |
EP-468/2013/A |
2.11 |
To
minimise adverse impacts on habitats of ecological importance in the vicinity
of the Project, 2m high solid dull green site barrier fences shall be erected
around all active works areas.(Figure
12) |
^[1] |
EP-473/2013/A |
2.13 |
To
minimise adverse impacts on habitats of ecological importance in the vicinity
of the Project, 2m high solid dull green site barrier fences shall be erected
around all active works areas.(Figure
14) |
^[1] |
EP-475/2013/A |
2.7 |
To
minimise adverse impacts on habitats of ecological importance in the vicinity
of the Project, 2m high solid dull green site barrier fences shall be erected
around all active works areas.(Figure 15) |
^[1] |
Implementation status: |
^ Mitigation
measure was fully implemented * Observation/reminder
was made during site audit but improved/rectified by the contractor # Observation/reminder
was made during site audit but not yet improved/ rectified by the contractor X Non-compliance
of mitigation measure ¡P Non-compliance
but rectified by the contractor N/A Not Applicable at this stage as no such
site activities were conducted in the reporting period |
[1]: Barrier
fences might be subjected to change according to phasing plan designed at
detailed design stage
9.4
Under
EP-466/2013 (Condition 2.9), EP-467/2013/A (Condition 2.9), EP-469/2013
(Condition 2.7) to minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas. As the Works
programme under above EPs were still under preparation work and the barrier fences erection was still
progressing in the Reporting Month, 2m high solid dull green site barrier
fences will be checked once in place. The Hoarding Plan of the above EPs are
shown in Figure 10, Figure 11 and Figure 13 respectively.
9.5
Waste generated
from Contract No. ND/2019/01, ND/2019/02, ND/2019/03, ND/2019/05 and ND/2019/06
include inert construction and demolition (C&D) materials and non-inert
C&D wastes in the Reporting Month.
9.6
The amount of wastes generated by
the construction works of the Contract No. ND/2019/01, ND/2019/02, ND/2019/03,
ND/2019/05 and Contract No.
ND/2019/06 during the reporting month is shown in Appendix N.
9.7
The
Contractors are advised to minimize the wastes generated through the recycling
or reusing. All mitigation measures stipulated in the Updated EM&A Manual
and waste management plans shall be fully implemented. The status of
implementation of waste management and reduction measures are summited in Appendix M.