Table 9.3     Photographic Records and Implementation Status of Measures

EP No.

Condition

Photographic Record

Implementation Status

EP-468/2013/A

2.11

86e53520-52c7-42d5-ab95-fffb04628fd4 8b9a553b-e781-49e1-b06e-ba7a606c66b2

 

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 12)

^[1]

EP-473/2013/A

2.13

IMG_9279 IMG_9276

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 14)

^[1]

EP-475/2013/A

2.7

975bc0b8-fb9b-41e3-aad3-3cb05fdae591 e031879b-03d4-4668-8e0e-8d2ca4386f41

To minimise adverse impacts on habitats of ecological importance in the vicinity of the Project, 2m high solid dull green site barrier fences shall be erected around all active works areas.(Figure 15)

^[1]

Implementation status:

^         Mitigation measure was fully implemented

*         Observation/reminder was made during site audit but improved/rectified by the contractor

#         Observation/reminder was made during site audit but not yet improved/ rectified by       the            contractor

X        Non-compliance of mitigation measure

·         Non-compliance but rectified by the contractor

N/A   Not Applicable at this stage as no such site activities were conducted in the reporting     period

[1]:       Barrier fences might be subjected to change according to phasing plan designed at detailed design stage