Table 9.2 Observations and Recommendations
during Site Audits |
|||
|
Date |
Observations and
Recommendations |
Follow-up |
Contract No.: ND/2019/01 Date Observations and
Recommendations Follow-up |
|||
Air Quality |
01/12/2020 |
Dusty stockpile should be covered entirely by
impervious sheeting. |
Improvement/Rectification was
observed during follow-up audit session on 8 December 2020. |
08/12/2020 |
NRMM label was observed faded. Contractor was reminded to check and
replace valid NRMM label on regulated machine. |
Improvement/Rectification was
observed during follow-up audit session on 15 December 2020. |
|
15/12/2020 |
To enhance dust control measures at stockpiling area at Portion 7. |
Improvement/Rectification was
observed during follow-up audit session on 22 December 2020. |
|
29/12/2020 |
To replace the impervious materials for covering and sheltering stock
of more than 20 bags of cement on top and 3 sides. (Portion 5) |
Follow-up action is needed to be
reported in the following month. |
|
Waste/ Chemical Management |
15/12/2020 |
To clear general refuse at Portion 8A regularly. |
Improvement/Rectification was
observed during follow-up audit session on 22 December 2020. |
29/12/2020 |
Drip tray should be provided for chemical storage at Portion 8a. |
Follow-up action is needed to be
reported in the following month. |
|
29/12/2020 |
To provide adequate capacity of storage area with drip trays for
chemical storage. (Portion 5) |
Follow-up action is needed to be
reported in the following month. |
|
Land Contamination |
01/12/2020 |
Arsenic-containing soil should be covered
entirely by impervious sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 8 December 2020. |
Contract
No.: ND/2019/02 |
|||
Air Quality |
25/11/2020 |
Slope should be covered entirely by impervious
sheeting. |
Improvement/Rectification
was observed during follow-up audit session on 2 December 2020. |
09/12/2020 |
NRMM Label was observed faded Contractor was
reminded to replace the NRMM Label. |
Item
was remarked as 201218-R01. Follow-up action is needed to be reviewed. |
|
18/12/2020 |
NRMM Label was observed faded Contractor was
reminded to replace the NRMM Label. |
Improvement/Rectification
was observed during follow-up audit session on 23 December 2020. |
|
Water Quality |
02/12/2020 |
Contactor was reminded to clear the water tank
and replace the water pump to avoid overflowing. |
Improvement/Rectification
was observed during follow-up audit session on 9 December 2020. |
09/12/2020 |
Sand bag should be provided along the steep site
boundary to avoid any site runoff from entering into nearby waterbody. |
Item
was remarked as 201218-R02. Follow-up action is needed to be reviewed. |
|
09/12/2020 |
Contactor was reminded to enhance water control
measure to prevent any discharge of wastewater into nearby watercourse. |
Improvement/Rectification
was observed during follow-up audit session on 18 December 2020. |
|
18/12/2020 |
Sand bag should be provided along the steep site
boundary to avoid any site runoff from entering into nearby waterbody. |
Improvement/Rectification
was observed during follow-up audit session on 23 December 2020. |
|
Waste / Chemical Management |
30/12/2020 |
Contractor was reminded to clear the debris in
channel. |
Follow-up
action is needed to be reported in the following month. |
Ecology |
09/12/2020 |
Hoarding erection is still processing, hoarding
will be check once in place. |
Item
was remarked as 201218-R03. Follow-up action is needed to be reviewed. |
18/12/2020 |
Hoarding erection is still processing, hoarding
will be check once in place. |
Item
was remarked as 201223-R01. Follow-up action is needed to be reviewed. |
|
23/12/2020 |
Hoarding was erected at part of active works
area. Hoarding erection is still processing and will be checked and
reviewed. |
Item
was remarked as 201230-R01. Follow-up action is needed to be reviewed. |
|
30/12/2020 |
Hoarding was erected at part of active works
area. Hoarding erection is still processing and will be checked and
reviewed. |
Follow-up
action is needed to be reported in the following month. |
|
Contract No.: ND/2019/03 |
|||
Air Quality |
15/12/2020 |
Contractor was reminded to clear the dusty
materials from the surface of roads. |
Improvement/Rectification
was observed during follow-up audit session on 22 December 2020. |
Landscape & Visual |
04/12/2020 |
Retained
tree should be carefully protected. |
Improvement/Rectification
was observed during follow-up audit session on 11 December 2020. |
15/12/2020 |
Retained
tree should be carefully protected. |
Improvement/Rectification
was observed during follow-up audit session on 22 December 2020. |
|
Contract No.: ND/2019/05 |
|||
Air Quality |
14/12/2020 |
Dusty road leading to vehicle entrance or exit
of construction site was observed. Public haul road should be kept clear of
dust. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2020. |
28/12/2020 |
NRMM label was observed faded. Contractor was
reminded to display valid NRMM label. (Portion 6) |
Follow-up
action is needed to be reported in the following month. |
|
28/12/2020 |
To keep public road near site entrance clean and
free of dust. |
Follow-up
action is needed to be reported in the following month. |
|
Water Quality |
14/12/2020 |
To clear the cut-off drains near wheel washing
area regularly. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2020. |
14/12/2020 |
To provide sandbags around works area to prevent
any muddy runoff to public road nearby. |
Improvement/Rectification
was observed during follow-up audit session on 21 December 2020. |
|
21/12/2020 |
To avoid any wastewater from wheel washing
facility from discharging into public road. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2020. |
|
Construction Noise Impact |
21/12/2020 |
To provide noise isolating materials for sheet
piling work. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2020. |
Waste / Chemical Management |
30/11/2020 |
Drip trays should be provided for chemical
storage at Portion 11. |
Improvement/Rectification
was observed during follow-up audit session on 9 December 2020. |
21/12/2020 |
Provide drip trays for chemical storage to
prevent chemical leakage. |
Improvement/Rectification
was observed during follow-up audit session on 28 December 2020. |
|
28/12/2020 |
To store chemical containers at area with drip
tray provided. (Portion 6) |
Follow-up
action is needed to be reported in the following month. |
|
Contract No.: ND/2019/06 |
|||
Water Quality |
10/12/2020 |
Contractor
was reminded to prevent surface runoff discharge into the river. |
Improvement/Rectification
was observed during follow-up audit session on 14 December 2020. |
14/12/2020 |
Contractor
was reminded to cover the exposed slope surface to prevent dust emission. |
Improvement/Rectification
was observed during follow-up audit session on 24 December 2020. |
|
24/12/2020 |
Contractor
was reminded to cover the exposed slope surface to prevent dust emission. |
Improvement/Rectification
was observed during follow-up audit session on 31 December 2020. |
|
Waste / Chemical Management |
03/12/2020 |
To provide drip tray for chemical storage. |
Improvement/Rectification
was observed during follow-up audit session on 10 December 2020. |
10/12/2020 |
Chemical should be stored at designated area or
with drip tray to prevent chemical leakage. |
Improvement/Rectification
was observed during follow-up audit session on 14 December 2020. |
|
14/12/2020 |
Chemical should be stored at
designated area or with drip tray to prevent chemical leakage. |
Improvement/Rectification
was observed during follow-up audit session on 24 December 2020. |