COM-2020-07-01 |
Public Road at
Portion 6a (ND/2019/01) |
13th July 2020 |
The EPD visit on 13 July
2020 was to respond the complaint received from the 2nd week in July
regarding the dust problem in public road of Portion 6a. Mr. Tse (EPD) observed
muddy wheel track on the public road, and he expressed that the public road
should keep free of mud even it was inside the project area. He also advised
BKRWJV (the Contractor) to clean up the muddy wheel track and provide
rectified photos to him. |
A designated person is
provided at the ingress/egress for vehicle washing before the wheel washing
facility is in use, this is to make sure all vehicle are free of mud before
leaving the site. And, the designated
person is also responsible for cleaning the public road if any mud is found
on it. |
Closed |
COM-2020-11-01 |
Portion 4 and Portion 7
near Dills Corner Garden (ND/2019/01) |
11th November
2020 |
The EPD inspection at
Portion 4 on 11 November 2020 was to respond the complaint regarding the dust
problem near Dills Corner Garden referred by a District Council Member. No
construction activities was carried out and no obvious dust emission was
observed. EPD advised BKRWJV (the Contractor) to increase the height of
temporary water barrier and install sprinklers on bare ground. Another EPD inspection
was conducted on 26 November 2020 at Portion 7 for the dust complaint. During
inspection, no obvious dust emission was observed and potential dust may
generate from top soil which appear to be dry. EPD advised the Contractor to
install sprinklers on top soil for dust suppression. |
The height of temporary
water barrier was increased at Portion 4. Sprinklers were installed on bare
ground at Portion 4 and on top soil at Portion 7. Manual water spraying were
provided regularly. Hydroseeding will be provided on soil surface at Portion
4 for long-term measures. Proper implementation of
dust mitigation measures will be continuously reviewed and monitored to avoid
potential dust impact on site. |
Closed |
COM-2020-11-02 |
Works Area A & B (ND/2019/05) |
27th November
2020 |
The complainant
complained about the noise generated from the alarm of scissors platform
during works for PM¡¦s site accommodation on Sunday and called the police
force. Police officer has checked that Construction Noise Permit has been
applied for the construction work. Also, the complainant complained about the
reflective blue color of roof material of site office. |
Permit-to-Work system was properly implemented for works at restricted
hours. The PME used have been checked in compliance with the valid
Construction Noise Permit (CNP No.: GW-RN0788-20). Acoustics mats were
erected between works area and noise sensitive receivers. Scissor platform or
noisy work activities will be arranged and minimized to be used on Sunday or
evening time on weekdays. Specific training for the quieter works arrangement
was provided to workers. Also, the blue roof will be covered by
non-reflective green roof material. |
Closed |