Table 9.2 Observations
and Recommendations of Site Audit |
|||||
Parameters |
Date |
Observations and Recommendations |
Follow-up |
||
Contract No.: ND/2019/01 Date Observations and Recommendations Follow-up |
|||||
Air Quality |
04/08/2020 |
Dusty stockpile
was reminded to be covered by impervious materials. (Portion 4) |
Improvement/Rectification
was observed during follow-up audit session on 11 August 2020. |
||
Water Quality |
28/07/2020 |
Contractor was
reminded to clear the ponding water at Portion 6. |
Improvement/Rectification was observed
during follow-up audit session on 4 August 2020. |
||
04/08/2020 |
Exposed slope
surface was reminded to be covered by impervious materials. (Portion 8) |
Improvement/Rectification was observed
during follow-up audit session on 11 August 2020. |
|||
Waste/ Chemical Management |
28/07/2020 |
Contractor was
reminded to dispose general refuse regularly to avoid accumulation at
Portion 6. |
Item was remarked as 200804-R01. Follow-up
action is needed to be reviewed. |
||
04/08/2020 |
Drip trays
should be provided for chemical storage. (Portion 6) |
Improvement/Rectification was observed
during follow-up audit session on 4 August 2020. |
|||
11/08/2020 |
Waste should be
disposed of regularly and properly. |
Improvement/Rectification was observed
during follow-up audit session on 18 August 2020. |
|||
11/08/2020 |
Chemical
container should be stored properly in designated area. |
Improvement/Rectification was observed
during follow-up audit session on 18 August 2020. |
|||
Ecology |
28/07/2020 |
Hoarding
erection is still processing, hoarding will be kept checking. |
Item was remarked as 200728-R01. Follow-up
action is needed to be reviewed. |
||
04/08/2020 |
Hoarding
erection is still processing, hoarding will be kept checking. |
Item was remarked as 200804-R01. Follow-up
action is needed to be reviewed. |
|||
11/08/2020 |
Hoarding
erection is still processing, hoarding will be kept checking. |
Item was remarked as 200811-R03. Follow-up
action is needed to be reviewed. |
|||
18/08/2020 |
Hoarding
erection is still processing, hoarding will be kept checking. |
Improvement/Rectification was observed
during follow-up audit session on 27 August 2020. |
|||
Contract No.: ND/2019/03 |
|||||
Air Quality |
28/08/2020 |
Stockpile of
dusty materials should be covered by impervious sheeting or sprayed with
water. |
Follow-up action is needed to be reported
in the following month. |
||
Waste / Chemical Management |
07/08/2020 |
Waste should be
disposed of regularly and properly. |
Improvement/Rectification was observed during
follow-up audit session on 14 August 2020. |
||
14/08/2020 |
General refuse
should be disposed of properly at Portion 18. |
Improvement/Rectification was observed
during follow-up audit session on 18 August 2020. |
|||
Contract No.: ND/2019/05 |
|||||
Water Quality |
03/08/2020 |
Water should be
cleared regularly. |
Improvement/Rectification was observed
during follow-up audit session on 12 August 2020. |
||
17/08/2020 |
Regular clear
the channel at the site exit so that the wheel washing can be directed to
silt removal facilities. |
Improvement/Rectification was observed
during follow-up audit session on 24 August 2020. |
|||
Waste / Chemical Management |
31/08/2020 |
Chemical waste
should be stored properly in designated area. |
Follow-up action is needed to be reported
in the following month. |
||
Landscape & Visual |
17/08/2020 |
Uncharted trees
should be carefully protected. |
Improvement/Rectification was observed
during follow-up audit session on 24 August 2020. |
||
Contract No.: ND/2019/06 |
|
||||
Air Quality |
13/08/2020 |
Contractor was
reminded to cover the stockpile of dusty materials when not in use. |
Improvement/Rectification was observed
during follow-up audit session on 20 August 2020. |
|
|
Waste / Chemical Management |
30/07/2020 |
Stagnant water in drip tray should be cleared properly. |
Improvement/Rectification was observed
during follow-up audit session on 6 August 2020. |
|
|
27/08/2020 |
Chemical waste, waste oil should be stored properly in designated
area. |
Follow-up action is needed to be reported
in the following month. |
|
||