Table 9.2      Observations and Recommendations of Site Audit

 


Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

Date

Observations and Recommendations

Follow-up

Air Quality

04/08/2020

Dusty stockpile was reminded to be covered by impervious materials. (Portion 4)

Improvement/Rectification was observed during follow-up audit session on 11 August 2020.

Water Quality

28/07/2020

Contractor was reminded to clear the ponding water at Portion 6.

Improvement/Rectification was observed during follow-up audit session on 4 August 2020.

04/08/2020

Exposed slope surface was reminded to be covered by impervious materials. (Portion 8)

Improvement/Rectification was observed during follow-up audit session on 11 August 2020.

Waste/ Chemical Management

 

28/07/2020

Contractor was reminded to dispose general refuse regularly to avoid accumulation at Portion 6.

Item was remarked as 200804-R01. Follow-up action is needed to be reviewed.

04/08/2020

Drip trays should be provided for chemical storage. (Portion 6)

Improvement/Rectification was observed during follow-up audit session on 4 August 2020.

11/08/2020

Waste should be disposed of regularly and properly.

Improvement/Rectification was observed during follow-up audit session on 18 August 2020.

11/08/2020

Chemical container should be stored properly in designated area.

Improvement/Rectification was observed during follow-up audit session on 18 August 2020.

Ecology

28/07/2020

Hoarding erection is still processing, hoarding will be kept checking.

Item was remarked as 200728-R01. Follow-up action is needed to be reviewed.

04/08/2020

Hoarding erection is still processing, hoarding will be kept checking.

Item was remarked as 200804-R01. Follow-up action is needed to be reviewed.

11/08/2020

Hoarding erection is still processing, hoarding will be kept checking.

Item was remarked as 200811-R03. Follow-up action is needed to be reviewed.

 

18/08/2020

Hoarding erection is still processing, hoarding will be kept checking.

Improvement/Rectification was observed during follow-up audit session on 27 August 2020.

Contract No.: ND/2019/03

Air Quality

28/08/2020

Stockpile of dusty materials should be covered by impervious sheeting or sprayed with water.

Follow-up action is needed to be reported in the following month.

Waste / Chemical Management

07/08/2020

Waste should be disposed of regularly and properly.

Improvement/Rectification was observed during follow-up audit session on 14 August 2020.

14/08/2020

General refuse should be disposed of properly at Portion 18.

Improvement/Rectification was observed during follow-up audit session on 18 August 2020.

Contract No.: ND/2019/05

Water Quality

03/08/2020

Water should be cleared regularly.

Improvement/Rectification was observed during follow-up audit session on 12 August 2020.

17/08/2020

Regular clear the channel at the site exit so that the wheel washing can be directed to silt removal facilities.

Improvement/Rectification was observed during follow-up audit session on 24 August 2020.

Waste / Chemical Management

31/08/2020

Chemical waste should be stored properly in designated area.

Follow-up action is needed to be reported in the following month.

Landscape & Visual

17/08/2020

Uncharted trees should be carefully protected.

             

Improvement/Rectification was observed during follow-up audit session on 24 August 2020.

Contract No.: ND/2019/06

 

Air Quality

13/08/2020

Contractor was reminded to cover the stockpile of dusty materials when not in use.

Improvement/Rectification was observed during follow-up audit session on 20 August 2020.

 

Waste / Chemical Management

30/07/2020

Stagnant water in drip tray should be cleared properly.

Improvement/Rectification was observed during follow-up audit session on 6 August 2020.

 

27/08/2020

Chemical waste, waste oil should be stored properly in designated area.

Follow-up action is needed to be reported in the following month.