4.1
Site
audits were carried out by ET on weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures on the Contract site. The
summaries of site audits are attached in Appendix
I.
4.2
Site
audits were conducted on 1st , 8th
, 15th , 22nd and 29th April 2020 for the
Contract No. ND/2019/01
in the reporting month. For Contract No. ND/2019/06, Site audits were conducted on 2nd
, 9th, 15th, 23rd , 29th April 2020 by ET in the reporting month.
A joint site audit with the
representative of the Supervisor¡¦s
Representative, the Contractor, IEC and ET was carried out on 22nd
April 2020 for Contract No. ND/2019/01 while joint site audit of Contract No.
ND/2019/06 was carried out on 23rd April 2020. The details of
observations during site audit are shown in Table 4.1.
4.3
During
site inspections in the reporting month, no non-conformance was identified. The
observations and recommendations made during the audit sessions are summarised in Table
4.1.
Table
4.1 Observations
and Recommendations of Site Audit
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Contract No.: ND/2019/01 Date Observations and Recommendations Follow-up |
|||
Air Quality |
15/04/2020 |
Dust generation was observed during vehicle
movement at portion 8A. The Contractor was reminded to water haul road
regularly. |
Improvement/ Rectification was observed during
follow-up audit session on 22 April 2020. |
Waste/ Chemical Management |
08/04/2020 |
Properly plug the drain outlet of the drip tray
at site office. |
Improvement/ Rectification was observed during
follow-up audit session on 15 April 2020. |
08/04/2020 |
Provide spill kit for all works area |
Item was remarked as 200415-R02. Follow-up
action is needed to be reviewed. |
|
15/04/2020 |
Provide spill kit for all works area. |
Item was remarked as 200422-R01. Follow-up
action is needed to be reviewed. |
|
22/04/2020 |
Provide spill kit for all works area. |
Item was remarked as 200429-R02. Follow-up
action is needed to be reviewed. |
|
29/04/2020 |
Provide spill kit for all works area. |
Follow up action will be reported in next reporting month. |
|
29/04/2020 |
Chemical waste should be labelled, put in
designated place properly. |
Follow up action will be reported in next reporting month. |
|
Landscape and Visual |
15/04/2020 |
To check the retained trees on site where site
clearance works have been started and protect them carefully. |
Item
was remarked as 200422-R02. Follow-up action is needed to be reviewed |
22/04/2020 |
To keep checking the retained trees on site
where site clearance works have been started and protect them carefully. |
Improvement/ Rectification was observed during
follow-up audit session on 29 April 2020. |
Parameters |
Date |
Observations and Recommendations |
Follow-up |
Contract No.: ND/2019/06 |
|||
Air Quality |
02/04/2020 |
The Contractor was reminded all work area,
exposed area shall be watered once per hour to avoid dust generation. |
Improvement/ Rectification was observed during follow-up audit session on 9
April 2020. |
Water Quality |
02/04/2020 |
Regularly
clear the channel at the site exit so that the wheel washing water can be
directed to silt removal facilities. |
Improvement/ Rectification was observed during follow-up audit session on 9
April 2020. |
09/04/2020 |
Drainage system/U-channel should be cleared
regularly and maintained. |
Improvement/ Rectification was observed during follow-up audit session on 15
April 2020. |
|
15/04/2020 |
The pH meter of AquaSed
displayed the value 11, the Contractor was reminded to do pH adjustment of
wastewater before discharging. |
Item was remarked as item 200423-O01,
follow-up action is needed to be reviewed. |
|
23/04/2020 |
The pH meter of AquaSed
displayed the value 8.6, the Contractor was reminded to do pH adjustment of
wastewater before discharging. |
Improvement/ Rectification was observed during follow-up audit session on 29
April 2020. |
|
23/04/2020 |
Water should be cleared regularly. |
Improvement/ Rectification was observed during follow-up audit session on 29
April 2020. |
|
23/04/2020 |
To enhance the mitigation provided to prevent
overflow of water during rainy season. |
Improvement/ Rectification was observed during follow-up audit session on 29
April 2020. |
|
Waste / Chemical Management |
02/04/2020 |
Chemical
waste should be stored properly in suitable container at designated area and
labelled clearly. |
Improvement/ Rectification was observed during follow-up audit session on 9
April 2020. |
09/04/2020 |
Chemical
waste should be stored properly in suitable container at designated area and
labelled clearly. |
Improvement/ Rectification was observed during follow-up audit session on 15
April 2020. |
|
15/04/2020 |
Chemical
waste should be stored properly in suitable container at designated area and
labelled clearly. |
Item was
remarked as item 200423-R02, follow-up action is needed to be reviewed. |
|
23/04/2020 |
Chemical
waste should be stored properly in suitable container at designated area and
labelled clearly. |
Item was
remarked as item 200429-R01, follow-up action is needed to be reviewed. |
|
29/04/2020 |
Chemical waste should be stored properly in
suitable container at designated area and labelled clearly. |
Follow up
action will be reported in next reporting month. |
|
Landscape
& Visual Impact |
02/04/2020 |
Retained trees should be carefully protected. |
Improvement/ Rectification was observed during follow-up audit session on 9
April 2020. |
4.4
According
to the EIA Report, EPs and the Updated EM&A Manual, the mitigation measures
detailed in the documents are recommended to be implemented during the
construction phase. An updated summary of the Environmental Mitigation
Implementation Schedule is provided in Appendix
J. The photographic records of measures as stipulated in EP to mitigate
environmental impacts in the reporting month are presented in Table 4.2.
Table 4.2 Photographic Records of
Measures
|
Environmental Permit
No. EP-475/2013/A
Condition 2.7 To minimise adverse
impacts on habitats of ecological importance in the vicinity of the Project,
2m high solid dull green site barrier fences have be erected around all
active works areas |
4.5
Waste
generated from Contract No. ND/2019/06 include inert construction and demolition (C&D)
materials and non-inert C&D wastes. For Contract No. ND/2019/01, only
general refuse had been generated during reporting month.
4.6
The amount of wastes generated by the
construction works of the Contract No. ND/2019/01 and Contract No. ND/2019/06 during the reporting month is
shown in Appendix K.
4.7
The
Contractors are advised to minimize the wastes generated through the recycling
or reusing. All mitigation measures stipulated in the Updated
EM&A Manual and waste management plans shall be fully implemented. The
status of implementation of waste management and reduction measures are
summited in Appendix J.