Table 10.2
Observations and Recommendations during Site Audits
Date |
Observations and Recommendations |
Follow-up |
|
Contract
No.: ND/2019/01 |
|||
Air Quality |
13/03/2025 |
Exposed haul road at Portion 2 should be water-sprayed
regularly as dust suppression. |
Improvement/Rectification was observed during
follow-up audit session on 19 March 2025. |
25/03/2025 |
Dusty haul road between Portion 6A and 9C should be
water-sprayed regularly as dust suppression. |
Follow-up action is needed to be reported in the
following month. |
|
Contract
No.: ND/2019/02 |
|||
Water Quality |
25/02/2025 |
Exposed slope next to
Shek Sheung River should be covered by impervious sheets properly. |
Item
remarked as 250305-R01.
Follow-up action is needed to be review. |
05/03/2025 |
Improvement/Rectification
was observed during follow-up audit session on 12 March 2025. |
||
05/03/2025 |
Drainage system should
be maintained properly and regularly. |
Improvement/Rectification
was observed during follow-up audit session on 12 March 2025. |
|
Ecology |
26/03/2025 |
Silt curtain near
CH1046 should be maintained properly and regularly. |
Follow-up
action is needed to be reported in the following month. |
Contract No.: ND/2019/03 |
|||
-- |
-- |
-- |
-- |
Contract No.: ND/2019/04 |
|||
Air Quality |
11/03/2025 |
Haul
road should be water-sprayed regularly as dust suppression. |
Improvement/Rectification
was observed during follow-up audit session on 18 March 2025. |
27/03/2025 |
Dusty
bags of cement at Portion K should be covered properly. |
Follow-up
action is needed to be reported in the following month. |
|
Ecology |
27/02/2025 |
2m high
dull green hoarding of the 10m buffer zone near Siu Hang San Tsuen should be maintained
properly. |
Improvement/Rectification
was observed during follow-up audit session on 6 March 2025. |
18/03/2025 |
Dull
green site barrier fences should be properly erected along Siu Hang San Tsuen
stream. |
Improvement/Rectification
was observed during follow-up audit session on 27 March 2025. |
|
Contract
No.: ND/2019/05 |
|||
Air Quality |
17/03/2025 |
NRMM label should be provided for the generator at
deck surface. |
Improvement/Rectification was
observed during follow-up audit session on 24 March 2025. |
17/03/2025 |
The used cement bags should be properly covered
before disposal or cleared as soon as possible (deck surface). |
Improvement/Rectification was
observed during follow-up audit session on 24 March 2025. |
|
31/03/2025 |
Dusty stockpile should be covered properly to avoid
dust generation. |
Follow-up action is needed to
be reported in the following month. |
|
Contract No.: ND/2019/07 |
|||
-- |
-- |
-- |
-- |