Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Water Quality

30/12/2024

On-site drainage at Portion 8A should be maintained properly and regularly.

Improvement/Rectification was observed during follow-up audit session on 7 January 2025.

30/12/2024

Contractor was reminded to enhance the sump pit bunding at Portion 9C.

Improvement/Rectification was observed during follow-up audit session on 7 January 2025.

Contract No.: ND/2019/02

Water Quality

30/12/2024

Contractors were reminded to immediately establish proper drainage system for pumped groundwater at Portion 7.

Item remarked as 250108-O01. Follow-up action is needed to be review.

08/01/2025

Item remarked as 250115-O01. Follow-up action is needed to be review.

15/01/2025

Item remarked as 250122-O01. Follow-up action is needed to be review.

22/01/2025

Item remarked as 250128-O01. Follow-up action is needed to be review.

28/01/2025

Follow-up action is needed to be reported in the following month.

30/12/2024

Provide complete drainage system to treat wastewater. (Shek Wu Hui Treatment Plant works area)

Item remarked as 250108-R02. Follow-up action is needed to be review.

08/01/2025

Item remarked as 250115-R02. Follow-up action is needed to be review.

15/01/2025

Item remarked as 250122-R02. Follow-up action is needed to be review.

22/01/2025

Item remarked as 250128-R02. Follow-up action is needed to be review.

28/01/2025

Follow-up action is needed to be reported in the following month.

30/12/2024

Bunding should be provided at Portion 11 to avoid surface runoff exceeds site boundary.

Item remarked as 250108-R03. Follow-up action is needed to be review.

08/01/2025

Improvement/Rectification was observed during follow-up audit session on 15 January 2025.

30/12/2024

Geotextile should be supplemented with the gully cover to avoid surface runoff discharge into the public drainage near Visitor Centre.

Item remarked as 250108-R05. Follow-up action is needed to be review.

08/01/2025

Item remarked as 250115-R05. Follow-up action is needed to be review.

15/01/2025

Item remarked as 250122-R04. Follow-up action is needed to be review.

22/01/2025

Item remarked as 250128-R04. Follow-up action is needed to be review.

28/01/2025

Follow-up action is needed to be reported in the following month.

Ecology

30/12/2024

Dull green hoarding should be erected along the site boundary as according to the submitted location plan.

Item remarked as 250108-R01. Follow-up action is needed to be review.

08/01/2025

Item remarked as 250115-R01. Follow-up action is needed to be review.

15/01/2025

Item remarked as 250122-R01. Follow-up action is needed to be review.

22/01/2025

Item remarked as 250128-R01. Follow-up action is needed to be review.

28/01/2025

Follow-up action is needed to be reported in the following month.

Waste/Chemical Management

30/12/2024

Accumulation of waste should be avoided at Portion 11.

Item remarked as 250108-R04. Follow-up action is needed to be review.

08/01/2025

Item remarked as 250115-R04. Follow-up action is needed to be review.

15/01/2025

Item remarked as 250122-R03. Follow-up action is needed to be review.

22/01/2025

Item remarked as 250128-R03. Follow-up action is needed to be review.

28/01/2025

Follow-up action is needed to be reported in the following month.

15/01/2025

Drip tray should be provided for chemical/fuel containers at Shek Wu Hui Treatment Plant works area.

Improvement/Rectification was observed during follow-up audit session on 22 January 2025.

Contract No.: ND/2019/03

--

--

--

--

Contract No.: ND/2019/04

Air Quality

02/01/2025

Water-spraying at Portion K should be enhanced as dust suppression measures.

Improvement/Rectification was observed during follow-up audit session on 9 January 2025.

09/01/2025

Water-spraying should be enhanced.

Item remarked as 250115-R02. Follow-up action is needed to be review.

15/01/2025

Improvement/Rectification was observed during follow-up audit session on 21 January 2025.

21/01/2025

Dusty stockpile should be covered by impervious sheets properly.

Improvement/Rectification was observed during follow-up audit session on 27 January 2025.

27/01/2025

Dusty stockpile under bridge A2 should be covered by impervious sheets properly.

Follow-up action is needed to be reported in the following month.

Ecology

09/01/2025

Silt curtain should be maintained properly.

Item remarked as 250115-R01. Follow-up action is needed to be review.

15/01/2025

Item remarked as 250121-R01. Follow-up action is needed to be review.

21/01/2025

Item remarked as 250127-R01. Follow-up action is needed to be review.

27/01/2025

Follow-up action is needed to be reported in the following month.

21/01/2025

2m high solid dull green barrier at the 10m buffer zone should be erected and maintained properly.

Improvement/Rectification was observed during follow-up audit session on 27 January 2025.

Waste / Chemical Management

09/01/2025

Waste accumulation should be avoided.

Improvement/Rectification was observed during follow-up audit session on 15 January 2025.

27/01/2025

General waste should be disposed of regularly.

Follow-up action is needed to be reported in the following month.

Water Quality

09/01/2025

Bunding should be supplemented at A3-04 to prevent slurry runoff.

Improvement/Rectification was observed during follow-up audit session on 15 January 2025.

Contract No.: ND/2019/05

Waste / Chemical Management

31/12/2024

Drip tray for the chemical/fuel containers should be provided at C3-03.

Improvement/Rectification was observed during follow-up audit session on 6 January 2025.

Air Quality

16/01/2025

Missing NRMM label on the generator at D2-01 should be displayed properly.

Improvement/Rectification was observed during follow-up audit session on 20 January 2025.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--