Contract No.: ND/2019/01

 

--

--

--

--

Contract No.: ND/2019/02

Water Quality

28/01/2025

Contractors were reminded to immediately establish proper drainage system for pumped groundwater at Portion 7.

Improvement/Rectification was observed during follow-up audit session on 5 February 2025.

28/01/2025

Provide complete drainage system to treat wastewater. (Shek Wu Hui Treatment Plant works area)

Item remarked as 250205-R02. Follow-up action is needed to be review.

05/02/2025

Item remarked as 250212-R02. Follow-up action is needed to be review.

12/02/2025

Improvement/Rectification was observed during follow-up audit session on 19 February 2025.

28/01/2025

Geotextile should be supplemented with the gully cover to avoid surface runoff discharge into the public drainage near Visitor Centre.

Improvement/Rectification was observed during follow-up audit session on 5 February 2025.

19/02/2025

Exposed slope next to Shek Sheung River should be covered by impervious sheets properly.

Item remarked as 250225-R01. Follow-up action is needed to be review.

25/02/2025

Follow-up action is needed to be reported in the following month.

Ecology

28/01/2025

Dull green hoarding should be erected along the site boundary as according to the submitted location plan.

Item remarked as 250205-R01. Follow-up action is needed to be review.

05/02/2025

Item remarked as 250212-R01. Follow-up action is needed to be review.

12/02/2025

Item remarked as 250219-R01. Follow-up action is needed to be review.

19/02/2025

Improvement/Rectification was observed during follow-up audit session on 25 February 2025.

Waste/Chemical Management

28/01/2025

Accumulation of waste should be avoided at Portion 11.

Improvement/Rectification was observed during follow-up audit session on 5 February 2025.

Permit/Licences

19/02/2025

CNP at site entrance should be updated.

Improvement/Rectification was observed during follow-up audit session on 25 February 2025.

Contract No.: ND/2019/03

--

--

--

--

Contract No.: ND/2019/04

Air Quality

27/01/2025

Dusty stockpile under bridge A2 should be covered by impervious sheets properly.

Item remarked as 250203-R02. Follow-up action is needed to be review.

03/02/2025

Item remarked as 250213-R01. Follow-up action is needed to be review.

13/02/2025

Improvement/Rectification was observed during follow-up audit session on 18 February 2025.

Ecology

27/01/2025

Silt curtain should be maintained properly.

Item remarked as 250203-R01. Follow-up action is needed to be review.

03/02/2025

Improvement/Rectification was observed during follow-up audit session on 13 February 2025.

27/02/2025

2m high dull green hoarding of the 10m buffer zone near Siu Hang San Tsuen should be

maintained properly.

Follow-up action is needed to be reported in the following month.

Waste / Chemical Management

27/01/2025

General waste should be disposed of regularly.

Item remarked as 250203-R03. Follow-up action is needed to be review.

03/02/2025

Improvement/Rectification was observed during follow-up audit session on 13 February 2025.

03/02/2025

General waste next to Ng Tung River should be disposed of regularly.

Improvement/Rectification was observed during follow-up audit session on 13 February 2025.

Contract No.: ND/2019/05

Waste / Chemical Management

20/02/2025

Drip tray should be provided for Chemical/fuel containers at Bridge D.

Improvement/Rectification was observed during follow-up audit session on 24 February 2025.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

Air Quality

10/02/2025

Stockpile of dusty material next to Ma Sik Road should be covered by impervious sheets

properly as dust suppression.

Improvement/Rectification was observed during follow-up audit session on 17 February 2025.