11.1 No Action/Limit Level exceedance for air
quality, water quality, ambient arsenic, built heritage and landfill gas
monitoring was recorded in the reporting month.
11.2 One (1) Action Level for construction noise
monitoring was recorded. The summary of exceedance record in the reporting
month is shown in Appendix O.
11.3 Ecological monitoring was carried out in the reporting
month. One (1) Action Level exceedance and three (3) Limit Level exceedance for
non-aquatic fauna were recorded at T1, T3, T5 and T6. The exceedances recorded
were for herpetofauna at T6, and for odonates at T1,
T3 and T5. The exceedances were considered non-project related, as no evidence
to suggest that the exceedances were related to project activities, supported
by environmental monitoring data.
11.4 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried
out.
11.5 No environmental non-compliance was recorded in the
reporting month.
11.6 Two (2) environmental complaints were received in the reporting month. The Cumulative Complaint Log since the
commencement of the Project is presented in Appendix S.
11.7
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.