11.1 One (1) Action Level and Two (2) Limit Level for
turbidity of impact water quality monitoring were recorded. After
investigation, all the exceedance at SYR-IS1, NTR-IS1 and SHST-IS2 was
considered caused by other external factors rather than the contract works.
11.2 No Action/Limit Level exceedance for air
quality, ambient arsenic, built heritage and landfill gas monitoring was
recorded in the reporting month.
11.3 One (1) Action Level for construction noise
monitoring was recorded. The summary of exceedance record in the reporting
month is shown in Appendix O.
11.4 Ecological monitoring was carried out in the reporting
month. Two (2) Action Level exceedance and four (4) Limit Level exceedance for
non-aquatic fauna were recorded at T1, T3, T5 and T6. The exceedances recorded
were for herpetofauna at T1, T3 & T5, and for odonates
at T1, T3 & T6. The exceedances were considered non-project related, as no
evidence to suggest that the exceedances were related to project activities,
supported by environmental monitoring data.
11.5 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried
out.
11.6 No environmental non-compliance was recorded in the
reporting month.
11.7 Three (3) environmental complaints were received in the reporting month. The Cumulative Complaint Log since the
commencement of the Project is presented in Appendix S.
11.8
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.