2.1
The
Kwu Tung North (KTN) and Fanling
North (FLN) New Development Areas (NDAs) are one of the important sources of
land and housing supply in the medium and long term. The development of the KTN
and FLN NDAs will be implemented in phase for full completion by 2031. The
Phase 1 of the NDAs development, comprising the Advance Works and First Stage
Works, is targeted to be implemented from the second half of 2019
progressively. The Advance and First Stage Works would include site formation,
engineering infrastructure works (including roads, drainage, sewerage,
waterworks, landscaping works, pumping stations, and fresh water and flushing
water service reservoirs), soil remediation, reprovisioning of North District
Temporary Wholesale Market, development of a nature park at Long Valley and
implementation of environmental mitigation measures.
2.2
The
scope of works under the Advance and First Stage Works comprises the following:
a)
The
Advance Works (PWP item No. 7747CL-2) consist of:
i)
site
formation of land (including soil remediation) in KTN and FLN NDAs for housing,
community facilities and engineering infrastructure;
ii) construction of roads including the
eastern section of Fanling Bypass (FLBP(E))
connecting the FLN NDA to Fanling Highway and other
roads with footpaths and cycle tracks, and associated junction/ road
improvements;
iii) engineering infrastructure works
including drainage. Sewerage (including two sewage pumping stations),
waterworks (including a fresh water service reservoir and a flushing water
service reservoir in the KTN NDA), landscape works and slopeworks;
iv) part expansion and upgrading of Shek
Wu Hui Sewage Treatment Works (SWHSTW);
v)
reprovisioning
works; and
vi) implementation of environmental
mitigation measures and environmental monitoring and audit (EM&A) programme for the works mentioned in (i)
to (v) above.
b)
The
First Stage Works (PWP item No. 7759CL) consist of:
i)
development
of a nature park at Long Valley including provision of a visitor centre and a footbridge spanning across Sheung Yue River
for connection between these two facilities;
ii) reprovisioning of two egretry sites in the FLN NDA and enhancement works to an
existing egretry site in the KTN NDA;
iii) site formation of land for a village
resite area and a district
police station in the KTN NDA;
iv) engineering infrastructure works
including roads, drainage, sewerage, waterbirds, and landscape works; and
v)
implementation
of environmental mitigation measures and environmental monitoring and audit
(EM&A) programme for the works mentioned in (i) to (iv) above.
2.3
The
Project which covers KTN and FLN NDAs is a designated project (DP) under Schedule
3 of the Environmental Impact Assessment (EIA) Ordinance (Cap. 499). In October
2013, the EIA Report (AEIAR-175/2013) for the Project was approved by the Director
of Environmental Protection pursuant to the EIA Ordinance. The relevant EPs
under the Project and the respective Work Contracts are summarised in Tables
2.1a and 2.1.b.
Table 2.1a Summary
of EPs under the Project and the Respective Work Contracts
EP No. |
Designated Project |
C1 |
C2 |
C3 |
C5A |
C5B |
C6 |
C7 |
|
Castle
Peak Road Diversion |
ü |
¡@ |
|||||||
Kwu Tung North New Development
Area Road P1 and P2 and Associated New Kwu Tung
Interchange and Pak Shek Au Interchange Improvement |
ü |
¡@ |
|||||||
Kwu Tung North New Development
Area Road D1 to D5 |
ü |
ü |
¡@ |
||||||
Sewage
Pumping Stations in Kwu Tung North New Development
Area |
ü |
¡@ |
|||||||
Utilization
of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works |
ü |
¡@ |
|||||||
Fanling Bypass Eastern Section |
ü |
ü |
ü |
¡@ |
|||||
Reprovision
of temporary Wholesale Market in Fanling North New
Development Area |
ü |
¡@ |
|||||||
EP-546/2017 |
Fanling North Temporary Sewage Pumping
Station |
ü |
¡@ |
Notes:
C1: ND/2019/01 C2:
ND/2019/02 C3: ND/2019/03 C5A: ND/2019/04
C5B: ND/2019/05 C6:
ND/2019/06 C7: ND/2019/07
Table 2.1b Summary of Scope
of Works under concerned EP
Environmental Permit (EP)
No. |
Work Contract(s) |
Scope of Works under
concerned EP(s) |
Site Layout Plan under
concerned EP(s) |
EP-466/2013/A(Part) |
C1 |
Realign Castle Peak
Road and join with the Pak Shek Au Interchange at the western end |
Figure 12 |
EP-467/2013/A(Part) |
C1 |
Construction of new
primary distributor road (P1) within Kwu Tung North
New Development Area |
Figure 13 |
EP-468/2013/A(Part) |
C1 |
Construction of new
primary distributor roads (D1, D3, D4 and part of D5) within Kwu Tung North New Development Area |
Figure 14 |
C3 |
Development of a nature
park at Long Valley and ecological mitigation and enhancement works for the
nature park (Condition 2.9) |
Figure 15 |
|
EP-469/2013(Part) |
C2 |
Construction of one
sewage pumping station in Kwu Tung North with
installed capacity of more than 2,000 m3 per day |
Figure 16 |
EP-470/2013/A(Part) |
C1 |
Construction of service
reservoir and watermain for the reuse of treated sewage effluent for reuse in
Kwu Tung North Development Areas |
Figure 17 |
EP-473/2013/A(Part) |
C3 |
Establishment of alternative egretry sites
and enhance the existing egretry site at Ho Sheung Heung and/or its vicinity
(Condition 2.7) |
Figure 18 |
EP-473/2013/A(Part) |
C5A |
Construction of new
district distributor inside FLN NDA, which provides a linkage between the Man
Kam To Road and the proposed Fanling
Bypass Eastern Section |
Figure 19 |
EP-473/2013/A(Part) |
C5B |
Figure 20 |
|
EP-475/2013/A |
C6 |
The re-provisioned wholesale
market will have approximately 1,000 market stalls within a site area of
around 1.3 ha |
Figure21 |
EP-546/2017 |
C5A |
Construct and operate a
temporary sewage pumping station in Fanling North
with installed capacity (average dry weather flow) of about 3,600m3/day |
Figure 22 |
Remark: The EP(s) not
related to the Project of the First Phase of the Kwu
Tung North (KTN) and Fanling North (FLN) New
Development Area (NDA) Development Areas are not included in the Table.
2.4
The
site boundary of the Project and all Works Contracts are shown in Drawing No. 1.
2.5
The
required submissions and submission status under Environmental Permits are
shown in Appendix U.
2.6
The
site layout
plans
under concerned Environmental Permits are shown in Figures
12 - 22.
2.7
Different
parties with different levels of involvement in the Project organisation include:
Project
Proponent ¡V Civil Engineering and Development Department (CEDD)
Supervisor / Supervisor's Representative
¡V AECOM Asia Co. Ltd.
Environmental
Team (ET) ¡V Wellab Limited
Independent
Environmental Checker (IEC) ¡V Mott MacDonald Hong Kong Ltd (MottMac)
2.8
The
names and contact numbers of key personnel are summarised in Table
2.2.
Table 2.2 Key Contacts of the Project
Party |
Role |
Contact Person |
Phone No. |
Fax No. |
Civil
Engineering and Development Department, HKSAR (CEDD) |
Project Proponent |
Mr.
Ryan Chau |
3797
5387 |
3547 1658 |
Supervisor / Supervisor's Representative (AECOM
Asia Co. Ltd.) |
Chief
Resident Engineer |
Mr.
Alan Lee |
6398 5982 |
2680 9515 |
Senior Resident Engineer |
Mr. King-man Chan |
9651 2635 |
2680 9515 |
|
Environmental
Team (Wellab Limited) |
Environmental Team Leader |
Dr.
Priscilla Choy |
2898 7388 |
2898
7076 |
Independent
Environmental Checker (MottMac) |
Independent
Environmental Checker |
Mr.
Thomas Chan |
2828
5967 |
2827
1823 |
Contract No. ND/2019/01 Contractor (Build King
¡V Richwell Engineering Joint Venture) |
Site
Agent |
Mr.
Ivan Leung |
9640 8340 |
-- |
Environmental
Officer |
Mr.
Edward Tam |
9287 8270 |
||
Contract No. ND/2019/02 Contractor (Chun Wo ¡V
Kwan Lee Joint Venture.) |
Site
Agent |
Mr.
Andy Chan |
3485 9780 |
-- |
Environmental
Officer |
Mr. Sofi So |
9637 1667 |
||
Contract No. ND/2019/03 Contractor (Sang Hing Kuly Joint Venture) |
Site
Agent |
Mr.
Tang Wing Kai |
9300 7037 |
-- |
Environmental
Officer |
Mr.
Ken Cheung |
9803
5297 |
||
Contract No. ND/2019/04 Contractor (Daewoo ¡V
Chun Wo ¡V Kwan Lee Joint Venture) |
Site
Agent |
Mr.
Eric Wu |
9786
8630 |
-- |
Environmental
Officer |
Mr.
Sam Lam |
6178
3179 |
||
Contract No. ND/2019/05 Contractor (CRCC ¡V
Paul Y. Joint Venture) |
Site
Agent |
Mr.
Darvin Lo |
9467
5891 |
-- |
Environmental
Manager |
Mr.
Pan Fong |
9436
9435 |
||
Environmental
Officer |
Mr.
Kevin Cheung |
6117
1344 |
||
Contract No. ND/2019/06 Contractor (New
Concepts Engineering Development Ltd.) |
Project
Manager |
Mr. Joe Cheng |
9861 0060 |
-- |
Environmental
Officer |
Mr.
Alex Choy |
6360
3236 |
||
Contract No. ND/2019/07 Contractor (China Road
and Bridge Corporation) |
Site
Agent |
Mr.
Mac Chow |
9169
9567 |
-- |
Environmental
Manager |
Mr.
K. M. Lui |
5113
8223 |
||
Environmental
Officer |
Ms. Sedo Sze |
5111
8018 |
2.9
The
major site activities undertaken in the reporting month are shown in Table 2.3.
Table 2.3 Summary Table for Major
Site Activities in the Reporting Month
Contract No. |
Site Activities (November 2024) |
ND/2019/01 |
(a)
Drainage
works, watermain works, sheet piling and slope works in Portion
1a (b)
Site
formation, watermain and construction of noise barrier
in Portion 1c (c)
Site
formation, construction of subway, drainage works, road works, slope work and soil nail in Portion
2 (d)
Watermain works, drainage work and sheet piles in Portion
3 (e)
Site
formation, watermain works and drainage works in Portion
5 (f)
Backfilling,
drainage works, watermain works, slope works, road work and district cooling system in
Portion 6a (g)
Operation
of HAC soil treatment facility in Portion 6b (h)
Excavation, watermain works, sewage works, road works and
drainage works in Portion
7 (i)
Road pavement construction, RC
construction of fresh water service reservoir, drainage works, watermain works and backfilling
works in Portion
8a (j)
Trenchless
work, watermain
construction, ELS construction and ground treatment works in Portion
8b (k)
Sheet
piling, excavation, drainage, watermain works and district cooling system in
Portion 9b (l)
No activity in Portion 11b this month (m)
Stockpile of soil in
Portion 13 |
ND/2019/02 |
(a)
Pipe Jacking (b)
Backfilling (c)
Excavation (d)
Concreting (e)
Bedding and pipe laying (f)
Sheet Piling (g)
Cut and Fill of Slope |
ND/2019/03 |
(a)
Portion 2
to Portion 20C -
Wetland creation & restoration, Dry agricultural land creation -
Construction of Water Treatment Wetland |
ND/2019/04 |
(a)
Pile Cap (b)
Back Filling (c)
Excavation (d)
Grouting (e)
Road works (f)
Formwork and Scaffolding Erection (g)
Rebar Fixing (h)
ELS |
ND/2019/05 |
(a)
South Team -
BBI Toilet ¡V Wall construction completed. Roof construction is in
progress. -
Lift LT01 ¡V Installation of louvre and glasses in progress. -
Lift LT02 ¡V Lift shaft in progress. -
Sign Gantry DS20 ¡V Pile cap construction in progress. -
E4 Retaining Wall ¡V Base slab construction in progress. -
Noise barrier NB109 A. Bay 14 ¡V
Footing completed. Wall construction in progress. B. Bay 17,
18 ¡V Walls are completed. Backfilling to formation level in progress. C. Bay 1 to
4 ¡V Partially completed up to 1m below road level. Backfilling to suit
TTA-423 in progress. -
Noise barrier NB70 A. Bay 5, 6
¡V Footing and wall construction completed. B.
Bay 2, 3, 4 - Excavation completed. Footing construction in progress. -
Noise barrier NB69 A.
Bay 1, 2 ¡V Bay 2b wall construction to be resumed after Bridge E4
segment erection. -
Noise barrier NB110 A.
Bay 10 ¡V Pile loading tests completed on 26 October 2024. Excavation
for pile caps PC1 and PC2 is completed. Pile cap construction is in progress -
Noise barrier NB 29 Through Bay 6-15 A.
Footing is 90% completed B.
Wall (exclude parapet) is 75% completed. Parapet section will cast
after backfilling to formation. -
Noise barrier NB 30 A.
NB30 Predrilling works (13/28 nos)
completed. B.
Pre-bored Socket H pile construction (7/220 nos)
completed. -
Noise barrier NB 77 A.
Pre-bored Socket H pile construction (1/16 nos)
completed. (b)
North Team -
B2-01 cross
head construction concreting completed. -
Rebar
fixing for B1abutment wall in progress. -
Reinstatement
works & footpath in progress in C4-02 (HD) -
C3-03b
& C3-04b for viaduct drainage & water works in progress -
Backfilling
of C3-04a, C2-01, C1-02a & C1-02b in progress. -
On Kui
Street (near newly constructed DN 900 manhole) ¡V reinstatement completed. -
On Kui
Street ¡V Construction of FW 53 completed. -
JCR:
Construction of new central median & ducting works for traffic signal
& road light were completed of 85%. -
JCR &
Tong Hang Village J/O improvement works (FS 25): slope works 90 % completed. -
JCR &
Tong Hang Village J/O (near bus-stop) : Ducting
works for traffic signal & road light was in progress ( 75 % completed). -
JCR near
Wong Kong Shan Village¡V Trial pits to verify of proposed alignment of
watermain diversion was completed. -
JCR near
F63 ¡V Breaking of temporary pavement was in progress. Laying of DN 150 FWM
was completed. (c)
Bridges and Structures -
All 116 Type C segments casted in DongGuan Casting yard. -
All Type A segment fabrication completed. Total
758 segments were delivered to site, and total 734 segments erected. -
B2-02 T-span segment erection by LG completed,
B2-03 T-span segment erection in progress. -
Total 1106 pcs of parapet-skin fabricated; 920
pcs of parapet skin erected. -
Installation of deck void drainage at Bridge C2
in progress. -
Segment erection at E4-01 & E4-02 T-span in
progress. -
Bridge rotation at D2-01 in progress. -
Reinstate of lifting tower NF83A in progress. (d)
Form Traveler -
Form traveler at 04th pair segment at E3-04 in progress. -
Form traveler at 11th pair segment at E3-02 completed -
Form traveler at 7th pair segment at D2-01 completed. -
Mid stitching between E2-01 & E2-02 in progress. -
Mid stitching between E3-02 & E3-03 completed. -
Dismantling of form traveler at E3-02 in progress -
Completed concreting E3-E3-02-E3-03-S10 & E3-E3-02-E3-01-S10,
E3-E3-02-E3-01-S011. -
Completed concreting E3-E3-04-E3-03-S02 & E3-E3-04-E3-05-S02,
E3-E3-04-E3-03-S03 & E3-E3-04-E3-05-S03. |
ND/2019/06 |
The construction phase was
completed and handed over to AFCD since 4 April 2022. |
ND/2019/07 |
(a)
Road
works at Portion 1, 4 and
5 (b)
C&D
waste disposal at Portion 1, 2 and 4 (c)
Drainage works, Sewerage works at Portion 1, 2, 3 and 4 (d)
Filling works at Portion 2 and 4 (e)
Construction of site haul road at Portion 4 (f)
Waterworks at Portion 1, 2 and 4 (g)
Construction of noise barrier at
Portion 4 |
2.10 Copies
of Contractors¡¦ construction programmes are
provided in Appendix A.
2.11 A summary of the relevant permits, licences, and/or notifications on environmental protection
for this Project is presented in Table
2.4.
Table 2.4 Status of Environmental Licences, Notifications and Permits