11.1 One (1) Action Level and
Three (3) Limit Level for DO, One (1) Action Level and
Seven (7) Limit Level for turbidity, and Three (3) Limit Level for SS of impact
water quality monitoring were recorded. After investigation, One (1)
Limit Level for turbidity and One (1) Limit Level for DO were considered
partially due to Contract No. ND/2019/04. The other exceedance was
considered due to the other external factors rather than the contract works.
11.2 No Action/Limit Level exceedance for air
quality, construction noise, ambient arsenic and landfill gas monitoring was recorded in the reporting month.
The summary of exceedance record in the reporting month is shown in Appendix
O.
11.3
Ecological
monitoring was carried out in the reporting month. Three
(3) action level exceedance and two (2) limit level exceedance for non-aquatic
fauna were recorded at T3, T4, and T6. The exceedances were considered
non-project related. As no evidence to suggest that the exceedance were related to project activities, as supported by
environmental monitoring data.
11.4 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried
out.
11.5 No environmental non-compliance was recorded in the
reporting month.
11.6 No environmental complaint was received in the reporting month. The Cumulative
Complaint Log since the commencement of the Project is presented in Appendix
S.
11.7
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.