Table 2.3 Summary
Table for Major Site Activities in the Reporting Month
Contract
No. |
Site
Activities (July 2024) |
ND/2019/01 |
(a)
Drainage
works, watermain works, sheet piling and slope works in Portion
1a (b)
Site
formation and
construction of noise barrier in Portion 1c (c)
Site
formation, construction of subway, drainage works, road works and
pipe piles in Portion
2 (d)
Watermain
works, drainage works and
sheet piles in Portion
3 (e)
Site
formation and pipe jacking in Portion 5 (f)
Backfilling,
drainage works, watermain works, slope works and district cooling system in
Portion 6a (g)
Operation
of HAC soil treatment facility in Portion 6b (h)
Excavation and watermain works in Portion
7 (i)
RC
construction of fresh water reservoir, drainage works, watermain works, backfilling
works and construction of receiving pit in Portion 8a (j)
Trenchless
work, watermain construction, excavation and ground treatment
works in Portion
8b (k)
Sheet
piling, excavation, drainage, watermain works and district cooling system in
Portion 9b (l)
Excavation and drainage works
in Portion 11b (m)
Stockpile of soil in Portion 13 |
ND/2019/02 |
(a)
Pipe Jacking (b)
Backfilling (c)
Concreting (d)
Bedding and pipe laying (e)
ELS (f)
Sheet Pile Installation (g)
Cut and Fill of Slope |
ND/2019/03 |
(a)
Portion 2
to Portion 20C -
Wetland creation & restoration, Dry agricultural land creation -
Construction of Water Treatment Wetland |
ND/2019/04 |
(a)
Pile Cap (b)
Back Filling (c)
Excavation (d)
Grouting (e)
Road works (f)
Formwork and Scaffolding Erection (g)
Rebar Fixing (h)
ELS (i)
Sheet Piling |
ND/2019/05 |
(a)
South Team -
E3-04 ¡V rebar fixing for portal beam in progress -
E4-01 ¡V Backfill to formation completed. -
E4-02 ¡V Pier head construction completed. Reinstatement of DN900
stormwater is in progress. -
E4-03M ¡V Footing is completed. Abutment wall construction is in
progress. Target completion is 26 July 2024. -
D2-04M ¡V Pilecap construction is in
progress. Target completion is 18 July 2024. -
Works in TWSRE A. Extension
to HKY Footbridge ¡V Railing is under fabrication and to be installed on 22
July 2024. B. BBI
Toilet ¡V Ground slab is completed. Backfilling in progress C. Ø1200 Watermain
¡V Wash out pit completed. Subsequent work DS20 Pile Cap to be commenced on 15
July 2024. -
Works in TWSRW A. FS04 ¡V
Construction of footpath in progress B. FS06 ¡V
FS06 is handed over to FL48. Temporary footpath is completed to suit gasmain diversion. C. HKY
Access Road ¡V Road and Drain in progress for footpath diversion. D. Sewerage
work ¡V Laying 600Dia pipes to Manhole TW3.01 is completed. Waiting to final
connection to existing sewerage manhole. E. Gas Pipe
laying (IPA400/HP600) ¡V IPA400 diversion is completed. HP600 diversion target
completion by Towngas on 3 August 2024. F. Lift
LT02 ¡V Pile cap completed. Wall to ground level is completed and backfilled.
Erection of temporary ramp is in progress. -
Noise barrier NB109 A. Bay 13 ¡V
Footing and stem wall are completed. B. Bay 14,
15, 16 ¡V Removal of Sign Gantry FADS8 footing is in progress. C. Bay 17,
18 ¡V ELS is in progress. D. Bay 1 to
4 ¡V Bay 4 sheetpiling in progress. Uncharted
manhole is encountered at Bay 3. -
Noise barrier NB70 A. Bay 1-6
¡V Bay 6 is completed. Bay 4 and 5 sheet piling
in progress. -
Noise barrier NB69 A. Bay 3,
5c, 6, 7 ¡V Footings and walls are completed B.
Bay 2b ¡V Wall is partially completed and backfilled. The remaining
portion will be completed after removal of E304 falsework. C.
Bay 4 ¡V Footing is completed. Construction of wall is in progress. D. Bay 8a ¡V
Footing is completed. Construction of wall is in progress. E.
Bay 5b ¡V Wall is completed F.
Bay 5a ¡V ELS is in progress. Footing to be casted on 22 July 2024. G. Bay 9,
10 ¡V Sheet piling is in progress. -
Noise barrier NB110 A.
Bay 6 to 9 ¡V Wall construction completed. Sheetpiles
are extracted and backfilling in progress. B.
Sign Gantry DS11 is removed on 11 July 2024. C.
Bay 10 ¡V Piling contractor has mobilized and piling works to be
commenced 19 July 2024. -
Noise barrier NB 29 A.
Bay 11 to 15 (near Fanling Hwy) ¡V Bay 12 to
15 Bottom wall completed. Bay 11 bottom wall is in progress. B.
Bay 7 to 13 (near West Road) ¡V Bay 7 to 11 Footing are completed. Bay
12 and 13 bottom wall completed. (b)
North Team -
Dismantling
of truss at C1-01 portal beam in progress. -
Falsework
erection for B2-01 cross head construction in progress. -
Dismantling
of falsework at B2-02 cross head in progress. -
1st pour
concreting for B2-03 cross head construction in progress. & rebar fixing
for 2nd pour in progress. -
Backfilling
& reinstatement of grasscrete at C4-01b was in
progress. -
Backfilling
of C1-02b & C2-01 were in progress. -
Backfilling
of B1-02b were in progress. -
Laying of
non-biodegradable mat on FS30 was completed. -
Reinstatement
works was in progress in C4-01a. -
On Kui
Street - Construction of manhole & associated DN 900 drain pipe were in progress. -
JCR: Construction
of new central median & ducting works for traffic signal & road light
were in progress. Reinstatement of flexible pavement after cross road duct
works completed. -
JCR &
Tong Hang Village J/O improvement works: Breaking / trimming of existing head
wall was completed. -
JCR- safety
island: Demolished upper part of uncharted abandoned valve chamber was in
progress. -
JCR near
Wong Kong Shan Village¡V Trial pits to verify of existing underground
utilities for proposed gully were completed. (c)
Bridges and Structures -
Total 52 Type C segments casted in DongGuan Casting yard. -
Total 675 segments were delivered to site, and
total 651 segments erected. -
Segment erection at C1-03~ C1-04 end span
completed. -
Segment erection at Bridge C1 in progress. -
Total 625 pcs of parapet-skin fabricated; 517
pcs of parapet skin arrived to site; 321 pcs of parapet skin erected. -
Installation of deck void drainage at Bridge C4
& C3 in progress. -
Preparation works for segment erection Bridge
E4 & end span E1-04 in progress. (d)
Form Traveler -
D2-03 FT launching back to D2-02 & dismantling works completed. -
Form traveler at 14th pair segment at E2-01 in progress. -
Form traveler at 5th pair segment at E3-02 in progress. -
Form traveler at 3rd pair segment at D2-01 in progress. -
Mid stitching between E2-02 & E2-03 in progress. -
Completed concreting E2-E2-01-E2-02-S11, E2-E2-01-E1-04-01-S11,
E2-E2-01-E2-02-S12, E2-E2-01-E1-04-01-S12, E2-E2-01-E2-02-S13,
E2-E2-01-E1-04-01-S13. -
Completed concreting E3-E3-02-E3-03-S04 & E3-E3-02-E3-01-S04. -
Completed concreting E2-E2-03-E2-02-S07 & E2-E2-03-E3-01-S07,
E2-E2-03-E2-02-S08. |
ND/2019/06 |
The
construction phase was completed and handed over to AFCD since 4 April 2022. |
ND/2019/07 |
(a)
Road
works at Portion 1, 4 and 5 (b)
C&D
waste disposal at Portion 1, 2 and 4 (c)
Drainage works, Sewerage works at Portion 1, 2, 3 and 4 (d)
Filling works at Portion 2 and 4 (e)
Construction of site haul road at Portion 4 (f)
Waterworks at Portion 1, 2 and 4 (g)
Construction of noise barrier at
Portion 4 and 5 |