5.1
In accordance with the Updated EM&A
Manual, impact water quality monitoring shall be carried out three days per
week at all the designated monitoring stations during the construction period.
The measurement periods are during the construction of channel specified in
Table 4.1 of the Updated EM&A Manual. The interval between two sets of monitoring
shall not be less than 36 hours.
5.2
Replicate in-situ measurements of Dissolved
Oxygen (DO), temperature, turbidity, pH, Suspended Solids (SS) and samples for Suspended
Solids (SS), ammonia nitrogen, unionized ammonia, nitrate nitrogen and
orthophosphate from each independent sampling event were collected
to ensure a robust statistically interpretable database.
5.3
Appendix B shows the established Action
and Limit Levels for the water quality monitoring work according to the Updated EM&A Manual and
Baseline Water Quality Monitoring Report (KTN & FLN NDA).
Monitoring Parameters, Frequency
5.4
Table 5.1 summarises the
monitoring parameters, monitoring periods and frequencies of the water quality
monitoring.
Table 5.1 Water Quality
Monitoring Parameters and Frequency
Parameters,
unit |
Depth |
Frequency |
¡P
Temperature(¢XC) ¡P
pH(pH unit) ¡P
turbidity (NTU) ¡P
water depth (m) ¡P
salinity (ppt) ¡P
DO (mg/L and % of
saturation) ¡P
SS (mg/L) ¡P
Ammonia
Nitrogen (NH3-N) (mg NH3-N/L) ¡P
Unionized
Ammonia (UIA) (mg/L) ¡P
Nitrate-nitrogen
(NO3-N) (mg NO3--N/L) ¡P
Ortho-phosphate
(PO4) (mg PO43--P/L) |
¡P
3 water depths: 1m below water surface, mid-depth and
1m above river bed. ¡P
If the water depth was
less than 3m, mid-depth sampling only. ¡P
If water depth was less
than 6m, mid-depth may be omitted. |
3 days per week during construction of channel |
5.5
According to Section 5.6.1.2 of the approved
EIA Report, the potential water quality impact during construction is due to
the alternation of natural streams (i.e. channelization of Ma Tso Lung Stream
and Siu Hang San Tsuen Stream) as these two streams are the ecologically
important
streams.
5.6
No construction of channel was carried out at Ma Tso
Lung Stream and Siu Hang San Tsuen Stream during the reporting month.
Therefore, no water quality monitoring was conducted.
Additional Water Quality
Monitoring
5.7
Additional Water Quality Monitoring shall be carried
out at River Beas, River Indus and near Siu Hang San Tsuen Stream three days
per week at all designated monitoring stations during the construction period.
The measurement period are during the construction
site drainage along River Beas, construction of footbridge across River Beas
and during construction of bridge across River Indus.
5.8
Replicate in-situ measurement and samples from each
independent sampling event were collected to ensure a robust statistically
interpretable database. DO, temperature, turbidity and pH were measured in-situ
whereas SS and arsenic were determined by an accredited laboratory. Other
relevant data, including monitoring location / position, time, water depth,
weather conditions and any special phenomena or work underway at the
construction site were recorded.
5.9
For all the monitoring stations, sampling were taken at 3 water depths, namely 1m below the water
surface, mid depth and 1m above the river bed. For stations that were
less than 3m in depth, only the mid depth sample was taken. Should the water
depth was less
than 6m, in which case the mid-depth station may have been
omitted. The interval between two sampling surveys was not less than 36 hours.
5.10
Appendix B shows the established Action and Limit Levels
for the environmental monitoring works.
5.11
Additional
impact water quality monitoring was conducted at 6 monitoring stations (SYR-CS1,
SYR-IS1, NTR-CS1, NTR-IS1, SHST-IS2, MWR-IS3) which are summarised
in Table 5.2. The location of
monitoring stations is shown in Figures
5 and 6.
Table 5.2 Additional
Water Quality Monitoring Stations
Station |
Description |
Locations |
Measurement
Periods |
River Beas |
|||
SYR-CS1 |
Control Station |
Upstream
of river |
During the construction site drainage along River
Beas and construction of the footbridge
across River Beas |
SYR-IS1 |
Impact
Station |
Downstream
of river |
|
River Indus and near Siu Hang San Tsuen Stream |
|||
NTR-CS1 |
Control Station |
Upstream of river |
During
construction of the bridge
across River Indus |
NTR-IS1 |
Impact Station |
Downstream of river |
|
SHST-IS2 |
Impact Station |
Water sensitive receiver at near Siu Hang San
Tsuen Stream |
|
MWR-IS3 |
Impact Station |
Water sensitive receiver at near
Ma Wat River |
5.12 Multi-parameter meters (Model YSI EXO) were used to measure DO, turbidity, salinity, pH and temperature.
Dissolved
Oxygen (DO) and Temperature Measuring Equipment
5.13
The instrument
for measuring dissolved oxygen and temperature should be portable and
weatherproof complete with cable, sensor, and use DC power source. The
equipment was capable of measuring:
¡P
A
dissolved oxygen level in the range of 0-20mg/L and 0-200% saturation; and
¡P
The
temperature within 0-45 degree Celsius.
5.14 The equipment had a membrane
electrode with automatic temperature compensation complete with a cable.
5.15 Sufficient stocks of spare
electrodes and cables were available for replacement where necessary.
5.16 Salinity compensation was
built-in in the DO equipment. In-situ salinity
was measured to calibrate the DO equipment prior to each DO measurement.
5.17 Turbidity was measured in situ
by using the nephelometric method. The instrument was portable and weatherproof
using a DC power sources complete with cable, sensor
and comprehensive operation manuals. The equipment was capable of measuring
turbidity between 0-1000 NTU. The probe cable was not less than 25m in length.
The meter was calibrated in order to establish the
relationship between NTU units and the levels of Suspended Solids.
5.18 A portable salinometer capable of
recording salinity within the range of 0-40 parts per thousand (ppt) was used
for salinity measurement.
5.19 A portable, battery-operated and hand held echo sounder was used for the determination of
water depth at each designated monitoring station.
pH
5.20 The instrument consisted of a
potentiometer, a glass electrode, a reference electrode
and a temperature-compensating device. It was readable to 0.1pH in a range of 0
to 14. Standard buffer solutions of at least pH 7 and pH 10 were used for
calibration of the instrument before and after use.
Water Sampling for Laboratory Analysis
5.21
A water sampler, consisting of a transparent
Polyvinyl Chloride (PVC) of a capacity of not less than two litres
which can be effectively sealed with cups at both ends was used. The water
sampler had a positive latching system to keep it open and prevent premature
closure until released by a messenger when the sampler was at the selected
water depth. In addition, a sampling cup attached to a fixed or extendable rod
was also used for sampling at the monitoring stations with swallow water.
Sample
Container and Storage
5.22
Following collection, water samples for laboratory
analysis were stored in high density polyethylene bottles with appropriate
preservatives added, packed in the ice (cooled to 4oC without being
frozen). The samples were
delivered to WELLAB Limited (HOKLAS Registration No. HOKLAS083) and analysed as soon as possible after collection of the water
samples. Sufficient volume of samples was collected to achieve the detection
limit.
Calibration of In Situ Instruments
5.23
The pH meter, DO meter and turbidimeter were
checked and calibrated before use. DO meter and turbidimeter were certified by
WELLAB Limited before use and subsequently re-calibrated at quarterly basis
throughout all stage of water quality monitoring programme.
Response of sensors and electrodes were checked with certified standard
solutions before each use. Wet bulb calibration for a DO meter was carried out
before measurement at each monitoring station.
5.24
For on-site calibration of field equipment
(Multi-parameter Water Quality System), the standard BS
1427:2009 ¡§Guide to on-site test methods for analysis of waters¡¨ was observed.
Back-up
Equipment
5.25
Sufficient stocks of spare parts were maintained
for replacements when necessary. Backup monitoring equipment was also be made
available so that monitoring could proceed
uninterrupted even when some equipment was under
maintenance, calibration, etc.
5.26
Table 5.3 summarises the
equipment used in the water quality monitoring programme. Copies of
the calibration certificates of the multi-parameter water quality systems are shown
in Appendix C.
Table 5.3 Water Quality
Monitoring Equipment
Equipment |
Model and Make |
Qty. |
Water sampler and sampling cup |
A 2-Litre transparent PVC cylinder with latex
cups at both ends and sampling cup for monitoring stations with swallow water |
1 |
Sonar Water Depth Detector |
Garmin Striker plus 4 |
1 |
Multi-parameter Water Quality System |
YSI EXO 1 |
2 |
Monitoring Parameters and Frequency
5.27
Table 5.4
summarises the monitoring parameters and
frequencies of the additional water quality monitoring. The water quality
monitoring schedule for the reporting month is shown in Appendix D.
Table 5.4 Additional
Water Quality Monitoring Parameters and Frequency
Monitoring Station(s) |
Parameters, unit |
Depth |
Frequency |
|
River
Beas |
SYR-CS1 SYR-IS1 |
¡P
Temperature (oC) ¡P
pH (pH unit) ¡P
Turbidity (NTU) ¡P
Water depth (m) ¡P
Salinity (ppt) ¡P
Dissolved Oxygen (DO) (mg/L and % of saturation) ¡P
Suspended Solids (SS) (mg/L) ¡P
Arsenic (As) (µg/L) |
¡P
3 water depths: 1m below water surface, mid-depth
and 1m above river bed. ¡P
If the water depth was less than 3m, mid-depth
sampling only. ¡P
If water depth was less than 6m, mid-depth might
be omitted. |
3 days per week |
River Indus and near Siu Hang San Tsuen Stream |
NTR-CS1 NTR-IS1 SHST-IS2 MWR-IS3 |
¡P
Temperature (oC) ¡P
pH (pH unit) ¡P
Turbidity (NTU) ¡P
Water depth (m) ¡P
Salinity (ppt) ¡P
Dissolved Oxygen (DO) (mg/L and % of saturation) ¡P
Suspended Solids (SS) (mg/L) |
5.28 Monitoring
location and position, time, sampling depth, weather conditions and any special
phenomena or work underway nearby was also recorded.
Instrumentation
5.29
Multi-parameter
meters (Model YSI EXO) were used
to measure DO, turbidity, salinity, pH and
temperature.
Operating/Analytical Procedures
5.30
At each measurement, two consecutive measurements
of DO concentration, DO saturation, salinity, turbidity, pH
and temperature were taken. The probes were retrieved out of the water after
the first measurement and then re-deployed for the second measurement. Where
the difference in the value between the first and second readings of each set
was more than 25% of the value of the first reading, the reading was discarded
and further readings were taken.
Laboratory Analytical Methods
5.31
Duplicate samples from each independent sampling
event were required
for all parameters.
Analysis of suspended solids and arsenic were carried out by WELLAB Ltd. and
comprehensive quality assurance and control procedures were in place in order to ensure the quality and consistency in results.
The analysis
methods and limits of reporting are provided in Table 5.5.
Table 5.5 Method for Laboratory
Analysis for Water Samples
Determinant |
Proposed Method |
Limit of Reporting |
Total Suspend Solids (SS) |
APHA 17ed 2540 D |
2.5 mg/L |
Arsenic (As) |
In-house method SOP022
(ICP-AES) and SOP076 (ICP-MS) |
1 µg/L |
5.32
Water sampling equipment used during
the course of the monitoring process was decontaminated by manual
washing and rinsed with distilled water after each sampling event. All of the disposal equipment was discarded after the
sampling.
Sampling Management and Supervision
5.33
All sampling bottles were labelled with the sample
I.D. (including sampling
station), laboratory number and sampling date. Water samples were dispatched to
the testing laboratory for analysis as soon as possible. All the collected
samples were stored in a cool box to keep the temperature less than 4oC
but without frozen. All water samples were handled under chain of custody
protocols and relinquished to the laboratory representatives at locations
specified by the laboratory.
Quality Control Measures for Sample Testing
5.34 The
samples testing and following QC programmes were performed by WELLAB Ltd. for
every batch of 20 samples:
¡P
One method blank; and
¡P
One set of QC sample.
5.35
All additional water quality monitoring was
conducted as scheduled in the reporting month. The water quality monitoring
schedule for this reporting month is shown in Appendix D.
5.36
The monitoring results and graphical presentation
of additional water quality monitoring are shown in Appendix G.
5.37 No Action/Limit Level exceedance
was recorded in the reporting month. The summary of exceedance record in the
reporting month is shown in Appendix O.
Event and Action Plan
5.38
Should any non-compliance of the criteria
occur, actions in accordance with the Event/Action Plan in Appendix N
shall be carried out.