Table 2.1b Summary of Scope of Works under concerned EP
Environmental
Permit (EP) No. |
Work
Contract(s) |
Scope
of Works under concerned EP(s) |
Site
Layout Plan under concerned EP(s) |
EP-466/2013/A(Part) |
C1 |
Realign
Castle Peak Road and join with the Pak Shek Au Interchange at the western end |
Figure 12 |
EP-467/2013/A(Part) |
C1 |
Construction
of new primary distributor road (P1) within Kwu
Tung North New Development Area |
Figure 13 |
EP-468/2013/A(Part) |
C1 |
Construction
of new primary distributor roads (D1, D3, D4 and part of D5) within Kwu Tung North New Development Area |
Figure 14 |
C3 |
Development
of a nature park at Long Valley and ecological mitigation and enhancement
works for the nature park (Condition 2.9) |
Figure 15 |
|
EP-469/2013(Part) |
C2 |
Construction
of one sewage pumping station in Kwu Tung North
with installed capacity of more than 2,000 m3 per day |
Figure 16 |
EP-470/2013/A(Part) |
C1 |
Construction
of service reservoir and watermain for the reuse of treated sewage effluent
for reuse in Kwu Tung North Development Areas |
Figure 17 |
EP-473/2013/A(Part) |
C3 |
Establishment of alternative egretry
sites and enhance the existing egretry site at Ho Sheung Heung and/or its vicinity
(Condition 2.7) |
Figure 18 |
EP-473/2013/A(Part) |
C5A |
Construction
of new district distributor inside FLN NDA, which provides a linkage between
the Man Kam To Road and the proposed Fanling Bypass Eastern Section |
Figure 19 |
EP-473/2013/A(Part) |
C5B |
Figure 20 |
|
EP-475/2013/A |
C6 |
The
re-provisioned wholesale market will have approximately 1,000 market stalls
within a site area of around 1.3 ha |
Figure21 |
EP-546/2017 |
C5A |
Construct
and operate a temporary sewage pumping station in Fanling
North with installed capacity (average dry weather flow) of about 3,600m3/day |
Figure 22 |
Remark: The EP(s) not related to the Project of the First Phase of the Kwu Tung North (KTN) and Fanling North (FLN) New Development Area (NDA) Development Areas are not included in the Table.