Table 10.5 Specific Water Quality
Mitigation Measures for Major Construction Works in the Reporting Month
Photographic
Records |
||
ND/2019/01 |
Hard paved exposed slope surface |
Hydroseeding
for slope area |
ND/2019/02 |
Hard paved exposed haul road |
Hard paved exposed
slope surface |
ND/2019/03 |
Hard paved exposed haul road |
Watering the main
haul road regularly. |
ND/2019/04 |
Hard paved exposed
slope surface |
Deployment of silt
curtain around works area in Ng Tung River |
ND/2019/05 |
Covering dusty stockpile |
Provision of sand
bags around works area |
ND/2019/07 |
Covering exposed
slope surface with tarpaulin |
De-silting waste
water before discharge |
Water
quality mitigation measures for site(s) in operation phase, remaining defect
works |
||
ND/2019/06 |
Hard paved exposed haul road |
Hard paved exposed haul road |