13
CONCLUSIONS AND
RECOMMENDATIONS
13.1 This
monthly
EM&A Report presents the EM&A work undertaken in December
2024 in
accordance with the Updated
EM&A Manual.
13.2 No
Action/Limit Level exceedance for air quality, water quality, construction
noise, ambient arsenic and landfill gas monitoring was recorded in the
reporting month.
13.3 Four (4) Action Level exceedance and two (2) Limit
Level exceedance for non-aquatic fauna were recorded at T1, T3, T5 and T6.
Contract No. ND/2019/01
13.4
Environmental site inspections
were conducted on 3, 10, 18, 23 and 30 Dec 24 by ET in the reporting
month.
Contract No. ND/2019/02
13.5
Environmental site
inspections were conducted on 4, 11, 18, 23 and 30 Dec 24 by ET in the reporting month.
Contract No. ND/2019/03
13.6
Environmental site inspections
were conducted on 3, 10, 18, 23 and 30 Dec 24 by ET in the reporting month.
Contract No. ND/2019/04
13.7
Environmental site
inspections were conducted on 5, 10, 19 and 24 Dec 24 by ET in the reporting month.
Contract No. ND/2019/05
13.8
Environmental site
inspections were conducted on 3, 12, 16, 24 and 31 Dec 24 by ET in the reporting month.
Contract No. ND/2019/06
13.9
The construction phase
EM&A Programme for Contract
No. ND/2019/06 was terminated on 19 Oct 2023. No more environmental site
inspection is required.
Contract No. ND/2019/07
13.10 Environmental site inspections were conducted
on 5, 13, 16, 24 and 31 Dec 24 by ET in the reporting month.
13.11 Two (2) environmental complaints were received in the reporting month. No notification of summons or
successful prosecutions was received in the
reporting month.
13.12 The ET would keep track on the EM&A
programme to ensure compliance of environmental requirements and the proper implementation
of all necessary mitigation measures.
13.13 According
to the environmental audits performed in the reporting month, the following
recommendations were made:
Air Quality Impact
¡P To regular water haul roads;
¡P To provide vehicle washing facilities with
high pressure water jet at every discernible or designated vehicle exit point;
¡P To
maintain the impervious material to entirely cover the stockpile of dusty materials; and
¡P To
ensure all regulated machines displayed with valid Non-road
Mobile Machinery (NRMM) labels.
Construction Noise Impact
¡P To ensure compressor operated with doors closed.
¡P To ensure
the noise barriers were fully enclosed.
Water Impact
¡P To review and implement temporary drainage
system;
¡P To prevent any surface runoff discharge into Sheung
Yuen River, Ma Wat River or public road;
¡P To
provide sandbags or construct berm to prevent any outflow of muddy water from
site area;
¡P To ensure all vehicle clear of earth and mud
before leaving the site areas;
¡P To
ensure the drainage facilities would not be clogged with waste or sediment to
avoid overflow;
¡P To
regularly check the condition of desilting materials for proper function;
¡P To regularly maintain and ensure water
treatment facilities proper operation and function;
¡P To
divert all the water generated from the construction site to
de-silting facilities with sufficient handling capacity before discharge; and
¡P To avoid
or regularly clear the stagnant water in drip trays;
Waste/Chemical Management
¡P To dispose
of general refuse properly;
¡P To
clear and avoid oil stains at site areas;
¡P To
provide proper storage areas for chemical; and
¡P To
maintain drip trays for
chemical storage well.
Landfill Gas Hazard
¡P
¡§No Smoking¡¨ and ¡§No Naked Flame¡¨ notices in Chinese and English should be posted
prominently around the construction site.
Land Contamination
¡P
Stockpiling
site(s) should be lined with impermeable sheeting and bunded. Stockpiles should
be properly covered by impermeable sheeting to reduce dust emission during dry
season or contaminated run-off during rainy season. Watering should be avoided
on stockpiles of soil to minimise runoff.
Ecology
¡P Properly
erect and maintain 2m high solid barriers for protecting Siu Hang San Tsuen
Stream.
Permit/ Licences
¡P To
display valid Permit or Licences at the site entrances.