1.1
Wellab
Limited was commissioned by Civil Engineering and Development Department (CEDD)
as the Environmental Team to undertake the Environmental Monitoring and Audit
(EM&A) services for the Works Contracts involved in the implementation of the
First Phase Development of Kwu Tung North (KTN) and Fanling North (FLN) New Development Areas (NDAs) Project to
ensure that the environmental performance of the Works Contracts complies with
the requirements specified in the Environmental Permits (EPs), Updated EM&A
Manual, Environmental Impact Assessment (EIA) Report of the KTN FLN NDAs
project and other relevant statutory requirements.
1.2
This
is the 62nd EM&A Report which summarises
the key findings of the EM&A programme in December
2024.
1.3
The
structure of the report is as follows:
Section 1: |
Introduction - purpose and structure of the report. |
Section 2: |
Project Information - summarises background
and scope of the Project, site description, project organisation
and contact details, construction programme, the
construction works undertaken and the status of Environmental Permits/Licences during the reporting month. |
Section 3: |
Air Quality Monitoring - summarises the monitoring
parameters, monitoring programmes, monitoring
methodologies, monitoring frequencies, monitoring locations, Action and Limit
Levels, monitoring results and Event / Action Plans. |
Section 4: |
Noise Monitoring - summarises the monitoring parameters, monitoring programmes, monitoring methodologies, monitoring
frequencies, monitoring locations, Action and Limit Levels, monitoring
results and Event / Action Plans. |
Section
5: |
Water Quality Monitoring - summarises the monitoring parameters, monitoring programmes, monitoring methodologies, monitoring
frequencies, monitoring locations, Action and Limit Levels and Event / Action
Plans. |
Section
6: |
Land Contamination (Ambient Arsenic Monitoring) - summarises the monitoring parameters, monitoring programmes, monitoring methodologies, monitoring
frequencies, monitoring locations, Action and Limit Levels, monitoring
results and Event / Action Plans. |
Section 7: |
Landfill Gas Monitoring - summarises the
monitoring requirement, monitoring parameters and frequency, monitoring
locations, Action and Limit Levels, monitoring results and observation, and
Event / Action Plans. |
Section 8: |
Built Heritage Monitoring
¡V summarises the monitoring
requirement, monitoring parameters and frequency, monitoring locations,
Action and Limit Levels, monitoring results and observation. |
Section 9: |
Ecological Monitoring ¡V summarises
the details of monitoring of measures to minimise disturbance
to waterbirds in Ng Tung River, Sheung Yue River, Shek Sheung River and Long
Valley, monitoring of measures to minimise impacts
on ecological sensitive habitats from disturbance and pollution during the reporting
month. |
Section 10: |
Environmental Site Inspection
- summarises
the audit findings of the weekly site inspections undertaken within the
reporting month. |
Section 11: |
Environmental
Non-conformance - summarises any monitoring
exceedance, environmental complaints, environmental summons and successful
prosecutions within the reporting month. |
Section 12: |
Future Key Issues - summarises the impact
forecast, proposed mitigation measures and monitoring schedule for the upcoming
months. |
Section 13: |
Conclusions and
Recommendations |