Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Air Quality

10/12/2024

The frequency of water-sprayed at Portion 1C should be enhanced as dust suppression.

Improvement/Rectification was observed during follow-up audit session on 18 December 2024.

Water Quality

26/11/2024

The construction materials at the drainage channel at Portion 7/13 should be cleared.

Improvement/Rectification was observed during follow-up audit session on 3 December 2024.

23/12/2024

On-site drainage at Portion 8A should be maintained properly and regularly.

Item remarked as 241230-R01. Follow-up action is needed to be review.

30/12/2024

Follow-up action is needed to be reported in the following month.

30/12/2024

Contractor was reminded to enhance the sump pit bunding at Portion 9C.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/02

Water Quality

27/11/2024

Contractors were reminded to immediately establish proper drainage system for pumped groundwater at Portion 7.

Item remarked as 241204-O01. Follow-up action is needed to be review.

04/12/2024

Item remarked as 241211-O01. Follow-up action is needed to be review.

11/12/2024

Item remarked as 241218-O01. Follow-up action is needed to be review.

18/12/2024

Item remarked as 241223-O01. Follow-up action is needed to be review.

23/12/2024

Item remarked as 241230-O01. Follow-up action is needed to be review.

30/12/2024

Follow-up action is needed to be reported in the following month.

27/11/2024

Provide complete drainage system to treat wastewater. (Shek Wu Hui Treatment Plant works area)

Item remarked as 241204-R02. Follow-up action is needed to be review.

04/12/2024

Item remarked as 241211-R02. Follow-up action is needed to be review.

11/12/2024

Item remarked as 241218-R02. Follow-up action is needed to be review.

18/12/2024

Item remarked as 241223-R02. Follow-up action is needed to be review.

23/12/2024

Item remarked as 241230-R02. Follow-up action is needed to be review.

30/12/2024

Follow-up action is needed to be reported in the following month.

27/11/2024

Enhance water mitigation measures to avoid surface runoff out of site boundary. (Portion 6)

Improvement/Rectification was observed during follow-up audit session on 4 December 2024.

04/12/2024

Muddy water discharge was observed at Portion 6. Contractors were reminded to enhance the wastewater drainage immediately.

Improvement/Rectification was observed during follow-up audit session on 11 December 2024.

18/12/2024

Bunding should be provided at Portion 11 to avoid surface runoff exceeds site boundary.

Item remarked as 241223-R03. Follow-up action is needed to be review.

23/12/2024

Item remarked as 241230-R03. Follow-up action is needed to be review.

30/12/2024

Follow-up action is needed to be reported in the following month.

23/12/2024

Geotextile should be supplemented with the gully cover to avoid surface runoff discharge into the public drainage near Visitor Centre.

Item remarked as 241230-R05. Follow-up action is needed to be review.

30/12/2024

Follow-up action is needed to be reported in the following month.

Air Quality

27/11/2024

Wheel washing facilities at Portion 11 near Ho Sheung Heung Pai Fung Road should be maintained properly to avoid dust and debris exceeds the site area.

Item remarked as 241204-O02. Follow-up action is needed to be review.

04/12/2024

Item remarked as 241211-O02. Follow-up action is needed to be review.

11/12/2024

Improvement/Rectification was observed during follow-up audit session on 18 December 2024.

04/12/2024

Stockpile of dusty material should be covered entirely to avoid dust generation.

Item remarked as 241211-R03. Follow-up action is needed to be review.

11/12/2024

Improvement/Rectification was observed during follow-up audit session on 18 December 2024.

Ecology

27/11/2024

Dull green hoarding should be erected along the site boundary as according to the submitted location plan.

Item remarked as 241204-R01. Follow-up action is needed to be review.

04/12/2024

Item remarked as 241211-R01. Follow-up action is needed to be review.

11/12/2024

Item remarked as 241218-R01. Follow-up action is needed to be review.

18/12/2024

Item remarked as 241223-R01. Follow-up action is needed to be review.

23/12/2024

Item remarked as 241230-R01. Follow-up action is needed to be review.

30/12/2024

Follow-up action is needed to be reported in the following month.

Waste/Chemical Management

18/12/2024

Accumulation of waste should be avoided at Portion 11.

Item remarked as 241223-R04. Follow-up action is needed to be review.

23/12/2024

Item remarked as 241230-R04. Follow-up action is needed to be review.

30/12/2024

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

--

--

--

--

Contract No.: ND/2019/04

Air Quality

19/12/2024

Water-spraying should be enhanced at Portion K to minimise dust generation.

Improvement/Rectification was observed during follow-up audit session on 24 December 2024.

Waste / Chemical Management

05/12/2024

Drip tray for chemical/fuel containers should be provided at Portion K.

Improvement/Rectification was observed during follow-up audit session on 10 December 2024.

Contract No.: ND/2019/05

Waste / Chemical Management

31/12/2024

Drip tray for the chemical/fuel containers should be provided at C3-03.

Follow-up action is needed to be reported in the following month.

Water Quality

16/12/2024

Bunding should be provided at the site entrance near E2-03.

Improvement/Rectification was observed during follow-up audit session on 24 December 2024.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--