11.1 Six (6) Limit Level for DO, Eight
(8) Limit Level for turbidity, Five (5) Limit Level and One (1) Action Level
for SS, and One (1) Action Level for arsenic of impact water quality monitoring
were recorded. After
investigation, all of the exceedance was considered due to the
other external factors rather than the contract works.
11.2 No Action/Limit Level exceedance for air
quality, construction noise, ambient arsenic and landfill gas monitoring was recorded in the reporting month.
The summary of exceedance record in the reporting month is shown in Appendix
O.
11.3 Ecological monitoring was carried out in the reporting
month. Two (2) action level exceedance and one (1) limit level exceedance for non-aquatic
fauna were recorded at T6, and two (2) limit level exceedance for aquatic fauna
were recorded. The exceedance were considered non-project related.
11.4 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried
out.
11.5 No environmental non-compliance was recorded in the
reporting month.
11.6 Three (3) environmental complaints were received in the reporting month. The Cumulative Complaint Log since the
commencement of the Project is presented in Appendix S.
11.7
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.