Table 10.2
Observations and Recommendations during Site Audits
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Contract No.: ND/2019/01 |
|||
Water Quality |
18/09/2023 |
Sandbag barriers along the site boundary at
Portion 2 should be enhanced to prevent surface runoff discharge. |
Improvement/Rectification was
observed during follow-up audit session on 26 Sep 2023. |
18/09/2023 |
Temporary ditches should be provided for runoff
discharge into appropriate watercourse. |
Item
remarked as 230926-R02. Follow-up action is needed to be review. |
|
26/09/2023 |
Water pump failure causing muddy water overflow
within the site boundary near Pak Shek Au should be fixed immediately. |
Follow-up
action is needed to be reported in the following month. |
|
26/09/2023 |
Barricade with geotextile should be installed
surrounding the channels at RC3, enhance the adequacy of water pump usage,
increase the capacity of temporary sedimentation pond, clear the U channel and ensure the sandbag barrier is fully enclosed
at Portion 1B and 1C. |
Follow-up
action is needed to be reported in the following month. |
|
Air Quality |
26/09/2023 |
The Contractor was reminded to provide sufficient
water-spraying to enhance dust suppression measures. |
Follow-up
action is needed to be reported in the following month. |
Contract No.: ND/2019/02 |
|||
Water Quality |
30/08/2023 |
Exposed slope surfaces along the riverside should be covered by
tarpaulin sheets securely and properly as soon as possible before
raining/typhoon. |
Improvement/Rectification
was observed during follow-up audit session on 6 Sep 2023. |
27/09/2023 |
Drainage system should be maintained properly along the riverside and
VC, mitigation measures including fully enclosed sand bag barrier should be
implemented. |
Follow-up action is needed to be reported in the
following month. |
|
27/09/2023 |
Exposed slope surface should be covered by tarpaulin sheets properly. |
Follow-up action is needed to be reported in the
following month. |
|
Ecology |
13/09/2023 |
The silt curtain under the bridge should be maintained properly and
regularly. |
Item remarked as 230922-R03. Follow-up action is needed
to be review. |
22/09/2023 |
Item remarked as 230927-R03. Follow-up action is
needed to be review. |
||
27/09/2023 |
Follow-up action is needed to be reported in the
following month. |
||
Landscape and Visual |
30/08/2023 |
The removed green hoarding along Sheung Yue River due to the
construction works should be replaced and maintained properly as soon as
possible. |
Item remarked as 230906-R01. Follow-up action is
needed to be review. |
06/09/2023 |
Item remarked as 230913-R01. Follow-up action is
needed to be review. |
||
13/09/2023 |
Item remarked as 230922-R01. Follow-up action is
needed to be review. |
||
22/09/2023 |
Item remarked as 230927-R01. Follow-up action is
needed to be review. |
||
27/09/2023 |
Follow-up action is needed to be reported in the following
month. |
||
30/08/2023 |
Tree protection zone should be maintained properly and regularly. / Construction
works of the VC exceeding site boundary causing damage to trees within 2m
from site boundaries. |
Item remarked as 230906-R02. Follow-up action is
needed to be review. |
|
06/09/2023 |
Item remarked as 230913-R02. Follow-up action is
needed to be review. |
||
13/09/2023 |
Item remarked as 230922-R02. Follow-up action is
needed to be review. |
||
22/09/2023 |
Item remarked as 230927-R02. Follow-up action is
needed to be review. |
||
27/09/2023 |
Follow-up action is needed to be reported in the
following month. |
||
Contract No.: ND/2019/03 |
|||
Air Quality |
31/08/2023 |
Dusty
stockpiles should be covered with tarpaulin sheets. |
Item
remarked as 230914-R01. Follow-up action is needed to be review. |
14/09/2023 |
Item
remarked as 230919-R01. Follow-up action is needed to be review. |
||
19/09/2023 |
Item
remarked as 230929-R01. Follow-up action is needed to be review. |
||
29/09/2023 |
Follow-up
action is needed to be reported in the following month. |
||
Water Quality |
31/08/2023 |
Provide
adequate wheel-washing facilities for each vehicle exits. |
Item
remarked as 230914-O01. Follow-up action is needed to be review. |
14/09/2023 |
Item
remarked as 230919-O01. Follow-up action is needed to be review. |
||
19/09/2023 |
Item
remarked as 230929-O01. Follow-up action is needed to be review. |
||
29/09/2023 |
Follow-up
action is needed to be reported in the following month. |
||
31/08/2023 |
Provide
sand bags to prevent muddy water discharge. |
Item
remarked as 230914-R02. Follow-up action is needed to be review. |
|
14/09/2023 |
Item
remarked as 230919-R02. Follow-up action is needed to be review. |
||
19/09/2023 |
Item
remarked as 230929-R02. Follow-up action is needed to be review. |
||
29/09/2023 |
Follow-up
action is needed to be reported in the following month. |
||
Contract No.: ND/2019/04 |
|||
Water Quality |
31/08/2023 |
All vehicles should be cleaned of earth, mud and debris before leaving the site. |
Item remarked as 230907-R01. Follow-up action is
needed to be review. |
07/09/2023 |
Item remarked as 230913-R01. Follow-up action is
needed to be review. |
||
13/09/2023 |
Item remarked as 230921-R01. Follow-up action is
needed to be review. |
||
21/09/2023 |
Item remarked as 230928-R01. Follow-up action is
needed to be review. |
||
28/09/2023 |
Follow-up action is needed to be reported in the
following month. |
||
31/08/2023 |
Stockpile of dusty materials should be covered
properly and securely during rainstorm. |
Item remarked as 230907-R02. Follow-up action is
needed to be review. |
|
07/09/2023 |
Improvement/Rectification
was observed during follow-up audit session on 13 Sep 2023. |
||
07/09/2023 |
Earth bunds or sand bag barriers around the
construction site next to Ma Wut River should be provided to prevent surface
runoff through the site boundary. |
Item remarked as 230913-O01. Follow-up action is
needed to be review. |
|
13/09/2023 |
Improvement/Rectification
was observed during follow-up audit session on 21 Sep 2023. |
||
28/09/2023 |
Water quality mitigation measures along Ng Tung
River should be provided, e.g. sand bag barrier. |
Follow-up action is needed to be reported in the
following month. |
|
Ecology |
13/09/2023 |
The silt curtain deployed around platform F02
should be maintained properly. |
Improvement/Rectification
was observed during follow-up audit session on 21 Sep 2023. |
28/09/2023 |
Silt curtain at Bridge F should be fully
enclosed. |
Follow-up action is needed to be reported in the
following month. |
|
Air Quality |
21/09/2023 |
Stockpile of dusty materials should be covered by
tarpaulin sheets. |
Improvement/Rectification
was observed during follow-up audit session on 28 Sep 2023. |
28/09/2023 |
Sufficient water-spraying should be provided
regularly. |
Follow-up action is needed to be reported in the
following month. |
|
Noise |
28/09/2023 |
Noise barrier should be maintained properly. |
Follow-up action is needed to be reported in the
following month. |
Contract No.: ND/2019/05 |
|||
Water Quality |
28/08/2023 |
The
design of the on-site drainage should be enhanced to prevent runoff going
through site surface at On Lok Garden. |
Improvement/Rectification
was observed during follow-up audit session on 04 Sep 2023. |
28/08/2023 |
Temporary
ditches should be provided for vehicle washing spaces to avoid wastewater
discharge into inappropriate watercourse. |
Improvement/Rectification
was observed during follow-up audit session on 04 Sep 2023. |
|
28/08/2023 |
Blue
hose attached to water pump should be kept away from the riverside. |
Improvement/Rectification
was observed during follow-up audit session on 04 Sep 2023. |
|
26/09/2023 |
Blue
hose attached to water pump should be kept away from the riverside. |
Follow-up action is needed to be reported in the following month. |
|
Air Quality |
18/09/2023 |
Provide
maintenance for excavator to avoid black smoke emission. |
Improvement/Rectification
was observed during follow-up audit session on 26 Sep 2023. |
Contract No.: ND/2019/06 |
|||
-- |
-- |
-- |
-- |
Contract No.: ND/2019/07 |
|||
-- |
-- |
-- |
-- |