Table 10.2
Observations and Recommendations during Site Audits
Date |
Observations and Recommendations |
Follow-up |
|
Contract No.: ND/2019/01 |
|||
Water Quality |
26/09/2023 |
Water pump failure causing muddy water
overflow within the site boundary near Pak Shek Au should be fixed
immediately. |
Item remarked as 231003-R02. Follow-up action is needed to be review. |
03/10/2023 |
Enhance the trench surrounding the site at
Pak Shek Au to prevent muddy runoff discharge. |
Improvement/Rectification
was observed during follow-up audit session on 11 Oct 2023. |
|
11/10/2023 |
Review the capacity of the sump pit at
Portion 9b. |
Improvement/Rectification
was observed during follow-up audit session on 17 Oct 2023. |
|
17/10/2023 |
Temporary drainage was blocked by concrete
paving. Contractor was reminded to remove such paving and ensure the proper
function of temporary drainage system. |
Improvement/Rectification
was observed during follow-up audit session on 24 Oct 2023. |
|
26/09/2023 |
Barricade with geotextile should be
installed surrounding the channels at RC3, enhance the adequacy of water pump
usage, increase the capacity of temporary sedimentation pond, clear the U channel and ensure the sandbag barrier is fully enclosed
at Portion 1B and 1C. |
Item was remarked as 231003-R01a to R01c for easy reference. Follow-up
action is needed to be review. |
|
03/10/2023 |
Enhance the adequacy of water pump usage. |
Item was remarked as 231011-R02 for easy reference. Follow-up action
is needed to be review. |
|
03/10/2023 |
Barricade with geotextile should be
installed surrounding the channels at RC3. |
||
03/10/2023 |
The capacity of temporary sedimentation pond
should be increased. |
||
11/10/2023 |
Mitigation measures rectification works at
RC2 and RC3 were noted. The performance and efficiency of these works will be
kept in view in the future inspections. |
Item was remarked as 231017-R01 for easy reference. Follow-up action
is needed to be review. |
|
17/10/2023 |
Improvement/Rectification
was observed during follow-up audit session on 24 Oct 2023. |
||
24/10/2023 |
The bare soil next to the nullah at Portion
1B should be properly covered with tarpaulin sheet. |
Improvement/Rectification
was observed during follow-up audit session on 31 Oct 2023. |
|
24/10/2023 |
The inactive exposed slope at Pak Shek Au
should be properly covered with tarpaulin sheet. |
Improvement/Rectification
was observed during follow-up audit session on 31 Oct 2023. |
|
24/10/2023 |
The deposited sediment at the drainage
channel at RC3 should be regularly cleared. |
Improvement/Rectification
was observed during follow-up audit session on 31 Oct 2023. |
|
Air Quality |
26/09/2023 |
The Contractor was reminded to provide
sufficient water-spraying to enhance dust suppression measures. |
Improvement/Rectification
was observed during follow-up audit session on 3 Oct 2023. |
24/10/2023 |
No enclosure on 3 sides and top shelter was
provided for the dusty (cement) generation works and no cover for the
temporary storage of cement bags at Portion 8A. The Contractor was reminded
to provide appropriate dust suppression measures for these works. |
Improvement/Rectification
was observed during follow-up audit session on 31 Oct 2023. |
|
24/10/2023 |
The sediment at the paved haul road should
be cleared (Portion 1B). |
Improvement/Rectification
was observed during follow-up audit session on 31 Oct 2023. |
|
24/10/2023 |
The bare soil next to the nullah at Portion
1B should be properly covered with tarpaulin sheet. |
Improvement/Rectification
was observed during follow-up audit session on 31 Oct 2023. |
|
24/10/2023 |
The inactive exposed slope at Pak Shek Au
should be properly covered with tarpaulin sheet. |
Improvement/Rectification
was observed during follow-up audit session on 31 Oct 2023. |
|
31/10/2023 |
Dusty debris was observed at 9b exit.
Contractor was reminded to clean it ASAP. |
Follow-up action is needed to be reported in the following month. |
|
31/10/2023 |
Cover the temporary storage of cement bags
at Pak Shek Au. |
Follow-up action is needed to be reported in the following month. |
|
Waste / Chemical Management |
31/10/2023 |
Provide drip tray for the chemical / fuel
containers at Portion 8A. |
Follow-up action is needed to be reported in the following month. |
Contract No.: ND/2019/02 |
|||
Water Quality |
27/09/2023 |
Drainage system should
be maintained properly along the riverside and VC, mitigation measures
including fully enclosed sand bag barrier should be implemented. |
Item
remarked as 231004-R03. Follow-up action is needed to be review. |
04/10/2023 |
Collected waste water
should be properly diverted to waste water treatment facilities. |
Item
remarked as 231011-R03. Follow-up action is needed to be review. |
|
11/10/2023 |
Item
remarked as 231018-R03. Follow-up action is needed to be review. |
||
18/10/2023 |
Improvement/Rectification was
observed during follow-up audit session on 27 Oct 2023. |
||
27/09/2023 |
Exposed slope surface
should be covered by tarpaulin sheets properly. |
Improvement/Rectification was
observed during follow-up audit session on 4 Oct 2023. |
|
04/10/2023 |
Water mitigation
measures should be provided to prevent material from the stockpile from
falling into Shek Sheung River. |
Improvement/Rectification was
observed during follow-up audit session on 11 Oct 2023. |
|
18/10/2023 |
Accumulated muddy silt
were observed under wastewater treatment facilities. Contractor are reminded to provide water mitigation measures to
ensure that there are no muddy runoff discharge into Sheung Yue River. |
Improvement/Rectification was
observed during follow-up audit session on 27 Oct 2023. |
|
04/10/2023 |
Vehicles should be
properly cleaned before leaving the site. |
Item
remarked as 231011-R04. Follow-up action is needed to be review. |
|
11/10/2023 |
Improvement/Rectification was
observed during follow-up audit session on 18 Oct 2023. |
||
27/10/2023 |
Contractor was reminded
to enhance the existing mitigation measures to prevent muddy discharge
outside of site boundary at the exit next to the cycling track. |
Follow-up
action is needed to be reported in the following month. |
|
27/10/2023 |
Wheel-washing
facilities should be provided and used at vehicle exits at Ho Sheung Heung
and Dills Corner site area to ensure that vehicles are cleaned before leaving
the site. |
Follow-up
action is needed to be reported in the following month. |
|
Ecology |
27/09/2023 |
The silt curtain under
the bridge should be maintained properly and regularly. |
Item
remarked as 231004-R02. Follow-up action is needed to be review. |
04/10/2023 |
Improvement/Rectification was
observed during follow-up audit session on 11 Oct 2023. |
||
11/10/2023 |
Small gap between the
silt curtains should be covered by geotextile. |
Item
remarked as 231018-R02. Follow-up action is needed to be review. |
|
18/10/2023 |
Improvement/Rectification was
observed during follow-up audit session on 27 Oct 2023. |
||
Landscape and Visual |
27/09/2023 |
The removed green
hoarding along Sheung Yue River due to the construction works should be
replaced and maintained properly as soon as possible. |
Item
remarked as 231004-R01. Follow-up action is needed to be review. |
04/10/2023 |
Item
remarked as 231011-R01. Follow-up action is needed to be review. |
||
11/10/2023 |
Item
remarked as 231018-R01. Follow-up action is needed to be review. |
||
18/10/2023 |
Item
remarked as 231027-R01. Follow-up action is needed to be review. |
||
27/10/2023 |
Follow-up
action is needed to be reported in the following month. |
||
27/09/2023 |
Tree protection zone
should be maintained properly and regularly. / Construction works of the VC
exceeding site boundary causing damage to trees within 2m from site
boundaries. |
Improvement/Rectification was
observed during follow-up audit session on 4 Oct 2023. |
|
Waste / Chemical Management |
27/10/2023 |
Contractor was reminded
to clear the chemical spillage. |
Follow-up
action is needed to be reported in the following month. |
Permit / Licences |
27/10/2023 |
The Environmental
Permit should be displayed on site ay Dills Corner site area. |
Follow-up
action is needed to be reported in the following month. |
Contract No.: ND/2019/03 |
|||
Air Quality |
29/09/2023 |
Dusty stockpiles should be covered with tarpaulin sheets. |
Item remarked as 231006-R01. Follow-up action is needed to be review. |
06/10/2023 |
Item remarked as 231013-R01. Follow-up action is needed to be review. |
||
13/10/2023 |
Improvement/Rectification
was observed during follow-up audit session on 17 Oct 2023. |
||
Water Quality |
29/09/2023 |
Provide adequate wheel-washing facilities for each vehicle exits. |
Item remarked as 231006-O01. Follow-up action is needed to be review. |
06/10/2023 |
Item remarked as 231013-O01. Follow-up action is needed to be review. |
||
13/10/2023 |
Item remarked as 231017-O01. Follow-up action is needed to be review. |
||
17/10/2023 |
Improvement/Rectification
was observed during follow-up audit session on 27 Oct 2023. |
||
29/09/2023 |
Provide sand bags to prevent muddy water discharge. |
Improvement/Rectification
was observed during follow-up audit session on 6 Oct 2023. |
|
Contract No.: ND/2019/04 |
|||
Water Quality |
28/09/2023 |
All vehicles should be cleaned of earth, mud
and debris before leaving the site. |
Item remarked as 231005-R01. Follow-up action is needed to be review. |
05/10/2023 |
Item remarked as 231012-R01. Follow-up action is needed to be review. |
||
12/10/2023 |
Wheel washing facilities should be provided at every site exit. |
Item remarked as 231018-R01. Follow-up action is needed to be review. |
|
18/10/2023 |
Item remarked as 231026-R01. Follow-up action is needed to be review. |
||
26/10/2023 |
Follow-up action is needed to be reported in the following month. |
||
28/09/2023 |
Water quality mitigation measures along Ng Tung River should be
provided, e.g. sand bag barrier. |
Improvement/Rectification
was observed during follow-up audit session on 5 Oct 2023. |
|
18/10/2023 |
Mitigation measures should be enhanced to avoid surface runoff
discharge into Ng Tung River. |
Item remarked as 231026-R03. Follow-up action is needed to be review. |
|
26/10/2023 |
Follow-up action is needed to be reported in the following month. |
||
Ecology |
28/09/2023 |
Silt curtain at Bridge F should be fully enclosed. |
Improvement/Rectification
was observed during follow-up audit session on 5 Oct 2023. |
Air Quality |
28/09/2023 |
Sufficient water-spraying should be provided regularly. |
Improvement/Rectification
was observed during follow-up audit session on 5 Oct 2023. |
05/10/2023 |
Dusty stockpile should be covered by impervious sheeting or sprayed
with water. |
Improvement/Rectification
was observed during follow-up audit session on 12 Oct 2023. |
|
05/10/2023 |
More than 20 bags of cement should be covered properly. |
Improvement/Rectification
was observed during follow-up audit session on 12 Oct 2023. |
|
Noise |
28/09/2023 |
Noise barrier should be maintained properly. |
Item remarked as 231005-R02 Follow-up action is needed to be review. |
05/10/2023 |
Item remarked as 231012-R02 Follow-up action is needed to be review. |
||
12/10/2023 |
Item remarked as 231018-R02 Follow-up action is needed to be review. |
||
18/10/2023 |
Item remarked as 231026-R02 Follow-up action is needed to be review. |
||
26/10/2023 |
Follow-up action is needed to be reported in the following month. |
||
Waste / Chemical Management |
05/10/2023 |
Drip tray should be provided with adequate capacity. |
Improvement/Rectification
was observed during follow-up audit session on 12 Oct 2023. |
26/10/2023 |
General refuse should be disposed of regularly and properly. |
Follow-up action is needed to be reported in the following month. |
|
Contract No.: ND/2019/05 |
|||
Water Quality |
26/09/2023 |
Blue hose attached to water pump should be kept away from the
riverside. |
Improvement/Rectification
was observed during follow-up audit session on 3 Oct 2023. |
10/10/2023 |
Provide maintenance of impervious sheeting for the exposed slope at
Portion 3. |
Improvement/Rectification
was observed during follow-up audit session on 19 Oct 2023. |
|
19/10/2023 |
Drainage management of the E2-02 exit should be enhanced to avoid
surface runoff discharge into inappropriate watercourse. |
Item remarked as 231024-R03 Follow-up action is
needed to be review. |
|
24/10/2023 |
Improvement/Rectification
was observed during follow-up audit session on 30 Oct 2023. |
||
Waste / Chemical Management |
03/10/2023 |
Drip tray for the chemical / fuel containers should be provided at
Portion 2. |
Improvement/Rectification
was observed during follow-up audit session on 10 Oct 2023. |
10/10/2023 |
Provide drip tray for chemical / fuel containers at Portion 3. |
Improvement/Rectification
was observed during follow-up audit session on 19 Oct 2023. |
|
10/10/2023 |
Keep clean and tidy at Portion 3 |
Item remarked as 231019-R01 Follow-up action is
needed to be review. |
|
19/10/2023 |
Item remarked as 231024-R01 Follow-up action is
needed to be review. |
||
24/10/2023 |
Item remarked as 231030-R01 Follow-up action is
needed to be review. |
||
30/10/2023 |
Follow-up action is needed to be reported in the
following month. |
||
Air Quality |
19/10/2023 |
Faded NRMM label on the generator located at E2-02 should be replaced. |
Improvement/Rectification
was observed during follow-up audit session on 24 Oct 2023. |
24/10/2023 |
Dusty stockpile should be covered properly, or removed from the area
near the exit of E2-02. |
Improvement/Rectification
was observed during follow-up audit session on 30 Oct 2023. |
|
Contract No.: ND/2019/06 |
|||
-- |
-- |
-- |
-- |
Contract No.: ND/2019/07 |
|||
Air Quality |
06/10/2023 |
Dusty stockpile should be covered properly to
avoid dust generation. |
Improvement/Rectification
was observed during follow-up audit session on 13 Oct 2023. |
Water Quality |
13/10/2023 |
Exposed slope surface should be covered properly
to avoid surface ru noff. |
Improvement/Rectification
was observed during follow-up audit session on 20 Oct 2023. |