9.1
Site
audits were carried out by ET on a weekly basis to monitor the timely
implementation of proper environmental management practices and mitigation
measures on the Contract site. Summary
of the site
audits are presented in Table 10.1 and Appendix P.
Table 10.1 Summary
of Site Audits
Environmental Site Inspection |
Works Contracts |
||||||
ND/2019/01 |
ND/2019/02 |
ND/2019/03 |
ND/2019/04 |
ND/2019/05 |
ND/2019/06 |
ND/2019/07 |
|
Weekly site audit with representative of the Supervisor¡¦s Representative and the
Contractor |
7, 17, 21
and 29 Nov 23 |
1, 8, 15,
24 and 29 Nov 23 |
3, 10,
17, 21 and 28 Nov 23 |
2, 9, 16,
20 and 30 Nov 23 |
6, 14, 20 and 27 Nov 23 |
N/A |
3, 10, 17 and 24 Nov 23 |
Joint Site Audit with representative of the Supervisor¡¦s Representative, the
Contractor and IEC |
7 Nov 23 |
24 Nov 23 |
21 Nov 23 |
20 Nov 23 |
14 Nov 23 |
N/A |
17 Nov 23 |
Remarks: The weekly site inspection for ND/2019/06 has been terminated
starting from 19/10/2023 since the termination proposal was approved by EPD on the
same day.
9.2
During
site inspections in the reporting month, no non-conformance was identified. The
observations and recommendations made during the audit sessions are summarised in Table 10.2.
Any outstanding and recurrence deficiencies are presented in Table 10.3.
9.3
All
construction activities with significant environmental impact undertaken by
Contract No. ND/2019/06 was substantially completed in March 2022 and the majority
of outstanding works were also completed
in April 2022 with defect rectification works remained. The outstanding installation works
were
the short-duration works which would be completed within 2 months during
the 1-year defect correction period, originally estimated.
9.4
Due to problems
in material deliveries from Mainland China in 2022, the completion date of the
outstanding works would be extended to June 2023 tentatively. However, in June
2023, more defects were found during the handover inspection so the
rectification works were undertaken until July 2023 when all works were completed.
9.5
The
weekly site inspection and EM&A Reporting for ND/2019/06 were maintained
until the termination proposal for ND/2019/06 has been endorsed by the IEC (17
Aug 23), the Engineer (26 Aug 23) and the Project Proponent (19 Sep 23)
followed by approval from EPD (19 Oct 23) in accordance. The procedure for
termination proposal for ND/2019/06 is in accordance with section 15.4.2 of
updated EM&A Manual.
Table 10.2
Observations and Recommendations during Site Audits
Date |
Observations and Recommendations |
Follow-up |
|
Contract No.: ND/2019/01 |
|||
Water Quality |
07/11/2023 |
Mud should be cleaned regularly as
maintenance for drainage system at 1C. |
Improvement/Rectification
was observed during follow-up audit session on 17 Nov 2023. |
Air Quality |
31/10/2023 |
Dusty debris was observed at 9b exit.
Contractor was reminded to clean it ASAP. |
Improvement/Rectification
was observed during follow-up audit session on 7 Nov 2023. |
31/10/2023 |
Cover the temporary storage of cement bags
at Pak Shek Au. |
Improvement/Rectification
was observed during follow-up audit session on 7 Nov 2023. |
|
17/11/2023 |
Exposed worksites and haul road at Portion
8a and Pak Shek Au should be watered regularly as dust suppression. |
Improvement/Rectification
was observed during follow-up audit session on 21 Nov 2023. |
|
17/11/2023 |
Stock of bags of cement at Portion 8a should
b e properly covered. |
Improvement/Rectification
was observed during follow-up audit session on 21 Nov 2023. |
|
21/11/2023 |
Review and enhance the hydroseeding
condition at Pak Shek Au. |
Improvement/Rectification
was observed during follow-up audit session on 29 Nov 2023. |
|
21/11/2023 |
Exposed haul road at Portion 1A and 1C
should be watered regularly as dust suppression. |
Improvement/Rectification
was observed during follow-up audit session on 29 Nov 2023. |
|
Waste / Chemical Management |
31/10/2023 |
Provide drip tray for the chemical / fuel
containers at Portion 8A. |
Improvement/Rectification
was observed during follow-up audit session on 7 Nov 2023. |
07/11/2023 |
Provide drip tray for the chemical / fuel
containers at Portion 1C. |
Improvement/Rectification
was observed during follow-up audit session on 17 Nov 2023. |
|
07/11/2023 |
Provide drip tray for mobile generator at
Pak Shek Au. Oil spillage was observed. Contractor was reminded to clean it
immediately. |
Improvement/Rectification
was observed during follow-up audit session on 17 Nov 2023. |
|
Contract No.: ND/2019/02 |
|||
Water Quality |
27/10/2023 |
Wheel-washing
facilities should be provided and used at vehicle exits at Ho Sheung Heung
and Dills Corner site area to ensure that vehicles are cleaned before leaving
the site. |
Improvement/Rectification was
observed during follow-up audit session on 1 Nov 2023. |
27/10/2023 |
Contractor was reminded
to enhance the existing mitigation measures to prevent muddy discharge
outside of site boundary at the exit next to the cycling track. |
Improvement/Rectification was
observed during follow-up audit session on 1 Nov 2023. |
|
01/11/2023 |
Provide maintenance for
the water mitigation measure to prevent surface runoff. |
Item
remarked as 231108-R02. Follow-up action is needed to be review. |
|
08/11/2023 |
Item
remarked as 231115-R02. Follow-up action is needed to be review. |
||
15/11/2023 |
Item
remarked as 231124-R02. Follow-up action is needed to be review. |
||
24/11/2023 |
Item
remarked as 231129-R02. Follow-up action is needed to be review. |
||
29/11/2023 |
Follow-up
action is needed to be reported in the following month. |
||
15/11/2023 |
Additional sandbags
should be provided near the cycling track. |
Item remarked
as 231124-R03. Follow-up action is needed to be review. |
|
24/11/2023 |
Provide maintenance for
the sandbags to prevent muddy water/ debris discharge onto cycling track. |
Item
remarked as 231129-R03. Follow-up action is needed to be review. |
|
29/11/2023 |
Follow-up
action is needed to be reported in the following month. |
||
01/11/2023 |
Leakage of water from wetsep was observed. Contractor was reminded to provide
maintenance for the wetsep at Portion 11. |
Improvement/Rectification was
observed during follow-up audit session on 8 Nov 2023. |
|
15/11/2023 |
Wheel-washing
wastewater were observed seeping through the concrete bund protecting the
nearby river. Contractor was reminded to provide maintenance to the concrete
bund to prevent untreated wastewater discharge. |
Item
remarked as 231124-R05. Follow-up action is needed to be review. |
|
24/11/2023 |
Provide maintenance to
the concrete bund to prevent wheel-washing wastewater discharge. |
Item
remarked as 231129-R05. Follow-up action is needed to be review. |
|
29/11/2023 |
Follow-up
action is needed to be reported in the following month. |
||
15/11/2023 |
Exposed slope at
Portion 5 should be properly covered by tarpaulin sheets. |
Item
remarked as 231124-R06. Follow-up action is needed to be review. |
|
24/11/2023 |
Item
remarked as 231129-R06. Follow-up action is needed to be review. |
||
29/11/2023 |
Follow-up
action is needed to be reported in the following month. |
||
15/11/2023 |
Silt accumulating in
the nullah near the water outlet at the material storage area should be
cleared immediately. Contractor was also reminded to enhance water mitigation
measures to prevent further accumulation of silt. |
Item
remarked as 231124-R07. Follow-up action is needed to be review. |
|
24/11/2023 |
Silt accumulating in
the nullah near the water outlet at the material storage should be cleared
continuously. Contractor was also reminded to enhance water mitigation
measures to prevent further accumulation of silt. |
Item
remarked as 231129-R07. Follow-up action is needed to be review. |
|
29/11/2023 |
Follow-up
action is needed to be reported in the following month. |
||
29/11/2023 |
Muddy water in Portion
11 should be cleared immediately to avoid overflow. |
Follow-up
action is needed to be reported in the following month. |
|
29/11/2023 |
Leakage of muddy water
was observed at Portion 4. Contractor was reminded to repair the drainage
system. |
Follow-up
action is needed to be reported in the following month. |
|
29/11/2023 |
Leakage of untreated
water was observed. Contractor was reminded to review the water treatment
system of Portion 5. |
Follow-up
action is needed to be reported in the following month. |
|
Air Quality |
01/11/2023 |
Double sand bags should
be provided to keep clean from the cycling path. |
Item
remarked as 231108-R03. Follow-up action is needed to be review. |
08/11/2023 |
Item
remarked as 231115-R03 (water quality). Follow-up action is needed to
be review. |
||
15/11/2023 |
Exposed haul road and
worksites should be watered regularly for dust suppression. |
Improvement/Rectification was
observed during follow-up audit session on 24 Nov 2023. |
|
24/11/2023 |
Exposed haul road at
Portion 11 should be watered regularly for dust suppression. |
Improvement/Rectification was
observed during follow-up audit session on 29 Nov 2023. |
|
Landscape and Visual |
27/10/2023 |
The removed green
hoarding along Sheung Yue River due to the construction works should be
replaced and maintained properly as soon as possible. |
Item
remarked as 231101-R01. Follow-up action is needed to be review. |
01/11/2023 |
Item
remarked as 231108-R01. Follow-up action is needed to be review. |
||
08/11/2023 |
Item
remarked as 231115-R01. Follow-up action is needed to be review. |
||
15/11/2023 |
Item
remarked as 231124-R01. Follow-up action is needed to be review. |
||
24/11/2023 |
Item
remarked as 231129-R01. Follow-up action is needed to be review. |
||
29/11/2023 |
Follow-up
action is needed to be reported in the following month. |
||
Waste / Chemical Management |
27/10/2023 |
Contractor was reminded
to clear the chemical spillage. |
Improvement/Rectification was
observed during follow-up audit session on 1 Nov 2023. |
01/11/2023 |
Accumulation of general
refuse should be avoided. Contractor was reminded to clean it ASAP. |
Improvement/Rectification was
observed during follow-up audit session on 8 Nov 2023. |
|
01/11/2023 |
Provide drip tray for
chemical/fuel containers. |
Improvement/Rectification was
observed during follow-up audit session on 8 Nov 2023. |
|
08/11/2023 |
Provide drip tray for
chemical/fuel containers at Portion 11. |
Improvement/Rectification was
observed during follow-up audit session on 15 Nov 2023. |
|
29/11/2023 |
Provide drip tray for
chemical/fuel container at visiting center. |
Follow-up
action is needed to be reported in the following month. |
|
29/11/2023 |
Accumulation of general
refuse should be avoided at the riverbank of Portion 11. |
Follow-up
action is needed to be reported in the following month. |
|
Permit / Licences |
27/10/2023 |
The Environmental
Permit should be displayed on site at Dills Corner site area. |
Improvement/Rectification was
observed during follow-up audit session on 1 Nov 2023. |
Contract No.: ND/2019/03 |
|||
Air Quality |
17/11/2023 |
Exposed worksites and haul road should be watered as dust suppression. |
Improvement/Rectification
was observed during follow-up audit session on 21 Nov 2023. |
17/11/2023 |
Dusty stockpile should be covered with impervious sheets or sprayed
with water as dust suppression. |
Item remarked as 231120-R01. Follow-up action is needed to be review. |
|
20/11/2023 |
Improvement/Rectification
was observed during follow-up audit session on 28 Nov 2023. |
||
Water Quality |
03/11/2023 |
Provide wheel washing facilities at every site exit. |
Improvement/Rectification
was observed during follow-up audit session on 10 Nov 2023. |
10/11/2023 |
Enhance the water mitigation measure for the work area at Yin Kong Road. |
Improvement/Rectification
was observed during follow-up audit session on 17 Nov 2023. |
|
Contract No.: ND/2019/04 |
|||
Water Quality |
26/10/2023 |
Wheel washing facilities should be provided at every site exit. |
Item remarked as 231102-R01. Follow-up action is needed to be review. |
02/11/2023 |
Item remarked as 231109-R01. Follow-up action is needed to be review. |
||
09/11/2023 |
Item remarked as 231116-R01. Follow-up action is needed to be review. |
||
16/11/2023 |
Improvement/Rectification
was observed during follow-up audit session on 20 Nov 2023. |
||
26/10/2023 |
Mitigation measures should be enhanced to avoid surface runoff
discharge into Ng Tung River. |
Item remarked as 231102-R03. Follow-up action is needed to be review. |
|
02/11/2023 |
Improvement/Rectification
was observed during follow-up audit session on 9 Nov 2023. |
||
02/11/2023 |
Drainage system should be maintained regularly, to prevent sludge
accumulation. |
Improvement/Rectification
was observed during follow-up audit session on 9 Nov 2023. |
|
02/11/2023 |
Leakage of untreated water was observed. Contractor was reminded to
enhance the mitigation measure. |
Improvement/Rectification
was observed during follow-up audit session on 9 Nov 2023. |
|
Ecology |
09/11/2023 |
The dull green barrier of the 10m buffer zone near Siu Hang San Tsuen
should be maintained properly and regularly. |
Item remarked as 231116-R02. Follow-up action is needed to be review. |
16/11/2023 |
Item remarked as 231120-R02. Follow-up action is needed to be review. |
||
20/11/2023 |
Item remarked as 231130-R02. Follow-up action is needed to be review. |
||
30/11/2023 |
Follow-up action is needed to be reported in the following month. |
||
16/11/2023 |
The silt curtain next to A3-01 should be maintained properly |
Item remarked as 231120-R03. Follow-up action is needed to be review. |
|
20/11/2023 |
Item remarked as 231130-R03. Follow-up action is needed to be review. |
||
30/11/2023 |
Follow-up action is needed to be reported in the following month. |
||
Air Quality |
20/11/2023 |
Stockpile of dusty material at A1-03 should be covered by impervious
sheets properly. |
Item remarked as 231130-R01. Follow-up action is needed to be review. |
30/11/2023 |
Stockpile of dusty material at A1-03 and Portion K should be covered
by impervious sheets properly. |
Follow-up action is needed to be reported in the following month. |
|
Noise |
26/10/2023 |
Noise barrier should be maintained properly. |
Improvement/Rectification
was observed during follow-up audit session on 2 Nov 2023. |
Waste / Chemical Management |
26/10/2023 |
General refuse should be disposed of regularly and properly. |
Improvement/Rectification
was observed during follow-up audit session on 2 Nov 2023. |
Permit/Licences |
02/11/2023 |
Provide CNP for the site entrance. |
Improvement/Rectification
was observed during follow-up audit session on 9 Nov 2023. |
Contract No.: ND/2019/05 |
|||
Waste / Chemical Management |
30/10/2023 |
Keep clean and tidy at Portion 3 |
Item remarked as 231106-R01. Follow-up action is
needed to be review. |
06/11/2023 |
Item remarked as 231114-R01. Follow-up action is
needed to be review. |
||
14/11/2023 |
Improvement/Rectification
was observed during follow-up audit session on 20 Nov 2023. |
||
06/11/2023 |
General refuse should be disposed of properly and regularly. |
Improvement/Rectification
was observed during follow-up audit session on 14 Nov 2023. |
|
Air Quality |
14/11/2023 |
Broken NRMM should be replaced at E3-04b. |
Improvement/Rectification
was observed during follow-up audit session on 20 Nov 2023. |
Noise |
14/11/2023 |
Missing NEL (Noise Emission Label) should be provided on the air
compressor. |
Improvement/Rectification
was observed during follow-up audit session on 20 Nov 2023. |
Contract No.: ND/2019/06 |
|||
-- |
-- |
-- |
-- |
Contract No.: ND/2019/07 |
|||
-- |
-- |
-- |
-- |
Table 10.3 Summary Table for the Outstanding item(s) in the reporting month
Contract No. |
Outstanding deficiencies since last
reporting month (Oct 2023) |
Deficiencies recorded in the reporting month (Nov 2023) |
Total deficiencies (including repeated
deficiencies) in the reporting month |
Deficiencies rectified in the reporting
month |
Outstanding deficiencies need to be Follow-up in the next month (Dec 2023) |
Total outstanding deficiencies |
||||||||||||||
A |
N |
W |
W/C |
CH |
L&V |
E |
P/L |
A |
N |
W |
W/C |
CH |
L&V |
E |
P/L |
|||||
ND/2019/01 |
3 |
6 |
/ |
1 |
3 |
/ |
/ |
/ |
/ |
10 |
10 |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
ND/2019/02 |
5 |
4 |
/ |
21 |
5 |
/ |
5 |
/ |
/ |
35 |
10 |
/ |
/ |
8 |
2 |
/ |
1 |
/ |
/ |
11 |
ND/2019/03 |
/ |
3 |
/ |
2 |
/ |
/ |
/ |
/ |
/ |
5 |
4 |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
ND/2019/04 |
4 |
2 |
/ |
6 |
2 |
/ |
1 |
7 |
/ |
18 |
7 |
1 |
/ |
/ |
/ |
/ |
/ |
2 |
/ |
3 |
ND/2019/05 |
1 |
2 |
1 |
3 |
6 |
/ |
/ |
/ |
/ |
12 |
4 |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
ND/2019/06* |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
ND/2019/07 |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
/ |
Legends:
A = Air Quality
N = Construction Noise Impact
W = Water Quality
W/C = Waste / Chemical Management
CH = Cultural Heritage
L&V = Landscape & Visual
E = Ecology
P/L = Permit / Licences
* The weekly site inspection for ND/2019/06 has been terminated starting
from 19/10/2023 since the termination proposal was approved by EPD on the same
day.
9.6
According
to the EIA Report, EPs and the Updated EM&A Manual, the mitigation measures
detailed in the documents are recommended to be implemented during the
construction phase. An updated summary of the Environmental Mitigation
Implementation Schedule is provided in Appendix
Q. The photographic records of measures as stipulated in EPs
to mitigate environmental impacts in the reporting month are presented in Table 10.4.
Table 10.4 Photographic Records and
Implementation Status of Measures
EP No. |
Condition |
Photographic Record |
Implementation Status |
EP-466/2013/A |
2.9 |
To
minimise adverse impacts on habitats of ecological
importance
in the vicinity of the Project, 2m high solid dull green site barrier fences
shall be erected around all active works areas. |
^[1] |
EP-467/2013/A |
2.9 |
To
minimise adverse impacts on habitats of ecological
importance
in the vicinity of the Project, 2m high solid dull green site barrier fences
shall be erected around all active works areas. |
^[1] |
EP-468/2013/A |
2.11 |
To
minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas. |
^[1] |
EP-469/2013 |
2.7 |
To
minimise adverse impacts on habitats of ecological importance
in the vicinity of the Project, 2m high solid dull green site barrier fences
shall be erected around all active works areas. |
^[1] |
EP-473/2013/A |
2.13 |
To
minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas. |
^[1] |
EP-475/2013/A |
2.7 |
To minimise adverse impacts on habitats of ecological
importance in the vicinity of the Project, 2m high solid dull green site
barrier fences shall be erected around all active works areas. |
^[1] |
Implementation status: |
^ Mitigation
measure was fully implemented * Observation/reminder
was made during site audit but improved/rectified by the contractor # Observation/reminder
was made during site audit but not yet improved/ rectified by the contractor X Non-compliance
of mitigation measure ¡P Non-compliance
but rectified by the contractor N/A Not
Applicable at this stage as no such site activities were conducted in the
reporting period |
Remark:
[1]: Barrier
fences might be subjected to change according to the phasing plan designed at
detailed design stage
9.7
The water quality mitigation measures
detailed in the EIA Report and the Updated EM&A Manual are recommended to
be implemented during the construction phase. Water quality mitigation measures
implemented by the contractors were closely monitored to prevent water
pollution, especially during rainy season. An updated summary of the
Environmental Mitigation Implementation Schedule is provided in Appendix Q.
Specific water quality mitigation measures for major construction works in the
reporting month are presented in Table 10.4.
Table 10.5 Specific Water Quality
Mitigation Measures for Major Construction Works in the Reporting Month
Works Contracts |
Photographic Records |
|
ND/2019/01 |
Hard paved exposed
slope surface |
Hydroseeding for
slope area |
ND/2019/02 |
Hard paved exposed
haul road |
Hard paved exposed slope surface |
ND/2019/03 |
Hard paved exposed
haul road |
Watering the main haul road regularly. |
ND/2019/04 |
Hard paved exposed slope surface |
Deployment of silt curtain around works area in Ng Tung River |
ND/2019/05 |
Covering dusty
stockpile |
Provision of sand bags around works area |
ND/2019/07 |
Covering exposed slope surface with tarpaulin |
De-silting waste water before discharge |
Water quality mitigation measures for site(s) in operation
phase, remaining defect works |
||
ND/2019/06 |
Hard paved exposed
haul road |
Hard paved exposed haul road |
9.8
Waste generated
from Contract Nos.
ND/2019/01, ND/2019/02, ND/2019/03, ND/2019/04, ND/2019/05 and ND/2019/07
included
inert construction and demolition (C&D) materials and non-inert C&D wastes
in the reporting
month.
The site of ND/2019/06 was handed over to AFCD for operation since 4 April
2022.
9.9
The amount of wastes generated by the construction works of the Contract
Nos.
ND/2019/01, ND/2019/02, ND/2019/03, ND/2019/04, ND/2019/05 and ND/2019/07 during the reporting month are shown in Appendix R. The site of
ND/2019/06 was handed over to AFCD for operation since 4 April 2022.
9.10
The
Contractors are advised to minimise
the wastes generated through recycling or reusing. All mitigation measures
stipulated in the Updated EM&A Manual and waste management plans shall be
fully implemented. The status of implementation of waste management and
reduction measures are summited in Appendix
Q.
9.11
Based on the findings of the EIA
Report, the area of Long Valley has been assessed as of high to very high
ecological value and is the largest contiguous area of freshwater wetland
habitats in Hong Kong. To safeguard the ecological value of Long Valley, about
37 hectares of land in Long Valley has been proposed to develop into Long
Valley Nature Park (LVNP) for conserving and enhancing the ecologically
important environment as well as for compensation of the wetland loss due to
the NDA development.
9.12
LVNP is developed according to the approved
Habitat Creation and Management Plan (HCMP) submitted under EP-468/2013/A. HCMP
provides a framework and specifications for development and management of LVNP
and guides the development to maintain and enhance the 37 hectares of low-lying
wetland habitats.
9.13
Regarding
the design, the zoning of land use in LVNP is intended to maintain the existing
mosaic pattern of wet and dry agriculture, while controlling the activities
that could potentially disturb target habitats and species. LVNP will be divided
into three broad zones of land use as below:
•
Biodiversity
Zone of about 21 hectares largely designated for biodiversity conservation
through cultivation of specified crops and habitat management.
•
Agricultural
Zone of about 11 hectares designated for commercially focuses crop production
and eco-friendly agricultural practice for farming.
•
Visitor
Zone of about 5 hectares designed to accommodate visitors as well as storage
and other facilities and for educational purposes.
9.14
The
construction of LVNP started in late 2019 and was expected to be completed in 2023.
During the construction
period, the progress of construction and wetland enhancement works has been
under observation by different stakeholders including AFCD and green groups.
Close communication between AFCD and CEDD were conducted to exchange views on
conservation, restoration and management of habitats
as well as on the planning and design of the park. In addition, advices
from green groups, Hong Kong Bird Watching Society (HKBWS) and The Conservancy
Association (CA), have been taken on habitat management of Long
Valley and potential effects on habitat and wildlife of each individual work
conducted in Long Valley. The last meeting was held on 18 November 2022 to share
the progress of LVNP with different stakeholders, including CEDD, AFCD, CA,
HKBWS, Contractor, ET, IEC and farmers.
9.15
Proposals
on wetland creation and restoration, dry agricultural land creation, pond
creation, water treatment wetland and design of irrigation channel were
submitted by the Contractor to achieve the objectives stated in HCMP and
accepted by the Engineer with consent from AFCD before implementation. The
Contractor would
consult the stakeholders for recommendations and suggestions on mitigation
measures to minimise the environmental impacts
arising from construction works. The progress of works would
be arranged to minimise impacts to avifauna and
maintain the habitat for avifauna. The photographic records of site activities
in LVNP are presented in Table 10.5.
Table 10.6 Photographic
Records of Site Activities in LVNP
Continuing agricultural practice in existing
farmland to maintain habitats in Long Valley |
|
Open
water Habitat |
Open
water Habitat |
Creation of wetland with designated
habitat for biodiversity conservation |
|
Planting of paddy rice to provide
foraging ground for Yellow-breasted Bunting |
|
Enhancement of irrigation channel
to provide reliable water source for farmland in Long Valley |
|
Provision of bird island (hidden area) |
Restoring of water flea pond to provide
food source to water birds |
Construction of storage sheds for farmers |
A Himantopus
himantopus was recorded |
Wet agricultural land |