Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Waste/Chemical Management

27/04/2023

General refuse should be disposed of properly and regularly.

Improvement/Rectification was observed during follow-up audit session on 2 May 2023.

Contract No.: ND/2019/02

Water Quality

03/05/2023

Exposed slopes on the side of the outlet next to Sheung Yue River should be covered with tarpaulin sheets.

Item remarked as 230510-R01. Follow-up action is needed to be review.

10/05/2023

Improvement/Rectification was observed during follow-up audit session on 17 May 2023.

17/05/2023

The excavated slope surface should be covered by impervious sheets.

Item remarked as 230524-R01. Follow-up action is needed to be review.

24/05/2023

The exposed slope surface should be covered by impervious sheets.

Item remarked as 230529-R01. Follow-up action is needed to be review.

29/05/2023

The exposed slope surface should be covered by tarpaulin sheets.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Air Quality

28/04/2023

Dusty debris was observed at Yin Kong Road. Contractor was reminded to clear the dusty debris immediately.

Item remarked as 230505-O02. Follow-up action is needed to be review.

05/05/2023

Item remarked as 230512-O02. Follow-up action is needed to be review.

12/05/2023

Improvement/Rectification was observed during follow-up audit session on 16 May 2023.

05/05/2023

Dusty stockpiles should be covered with tarpaulin sheets.

Item remarked as 230512-R03. Follow-up action is needed to be review.

12/05/2023

Item remarked as 230516-R03. Follow-up action is needed to be review.

16/05/2023

Item remarked as 230522-R02. Follow-up action is needed to be review.

22/05/2023

Follow-up action is needed to be reported in the following month.

Water Quality

28/04/2023

Provide adequate wheel-washing facilities for each vehicle exits, suitable for the current temporary traffic arrangement, and ensure that vehicles are properly washed before leaving the site.

Item remarked as 230505-O01. Follow-up action is needed to be review.

05/05/2023

Item remarked as 230512-O01. Follow-up action is needed to be review.

12/05/2023

Item remarked as 230516-O01. Follow-up action is needed to be review.

16/05/2023

Item remarked as 230522-O01. Follow-up action is needed to be review.

22/05/2023

Follow-up action is needed to be reported in the following month.

Waste / Chemical Management

28/04/2023

Provide drip tray for chemical/fuel containers.

Item remarked as 230505-R01. Follow-up action is needed to be review.

05/05/2023

Item remarked as 230512-R01. Follow-up action is needed to be review.

12/05/2023

Item remarked as 230516-R01. Follow-up action is needed to be review.

16/05/2023

Improvement/Rectification was observed during follow-up audit session on 22 May 2023.

Landscape & Visual

28/04/2023

Remove any construction material from tree protection zone.

Item remarked as 230505-R02. Follow-up action is needed to be review.

05/05/2023

Item remarked as 230512-R02. Follow-up action is needed to be review.

12/05/2023

Item remarked as 230516-R02. Follow-up action is needed to be review.

16/05/2023

Item remarked as 230522-R01. Follow-up action is needed to be review.

22/05/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/04

Waste/Chemical Management

11/05/2023

Prevent oil leakage from air compressors.

Improvement/Rectification was observed during follow-up audit session on 17 May 2023.

Air Quality

25/05/2023

The idle stockpile of dusty materials at Portion K should be covered properly with tarpaulin sheet.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/05

Water Quality

08/05/2023

To enhance water mitigation measures at D2-01 to prevent muddy water runoff go through the site surface and discharge to public access road e.g. sandbag barrier.

Improvement/Rectification was observed during follow-up audit session on 18 May 2023.

18/05/2023

The earth bunding at D2-02 should be fully enclosed to prevent muddy runoff from entering the river.

Improvement/Rectification was observed during follow-up audit session on 22 May 2023.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--