Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

--

--

--

--

Contract No.: ND/2019/02

Water Quality

20/02/2023

Drainage should be cleared and maintained properly.

Item remarked as 230301-R01. Follow-up action is needed to be review.

01/03/2023

Improvement/Rectification was observed during follow-up audit session on 8 March 2023.

Landscape and Visual

20/02/2023

Tree protection zone should be enhanced.

Improvement/Rectification was observed during follow-up audit session on 1 March 2023.

Air Quality

24/03/2023

To enhance dust suppression measures by watering regularly.

Improvement/Rectification was observed during follow-up audit session on 29 March 2023.

Contract No.: ND/2019/03

Air Quality

03/03/2023

Dusty debris was observed in Yin Kong Road. Contractor was reminded to clear the dusty debris immediately.

Item remarked as 230310-O01. Follow-up action is needed to be review.

10/03/2023

Improvement/Rectification was observed during follow-up audit session on 17 March 2023.

31/03/2023

Follow-up action is needed to be reported in the following month.

03/03/2023

Provide NRMM label for regulated machine.

Item remarked as 230310-R01. Follow-up action is needed to be review.

10/03/2023

Improvement/Rectification was observed during follow-up audit session on 17 March 2023.

17/03/2023

Provide impervious sheeting for dusty stockpile.

Item remarked as 230321-R01. Follow-up action is needed to be review.

21/03/2023

Improvement/Rectification was observed during follow-up audit session on 31 March 2023.

Water Quality

31/03/2023

Clear the wheel-washing bay regularly.

Follow-up action is needed to be reported in the following month.

Waste / Chemical Management

03/03/2023

Provide drip tray for chemical/fuel containers.

Improvement/Rectification was observed during follow-up audit session on 10 March 2023.

17/03/2023

Item remarked as 230321-R02. Follow-up action is needed to be review.

21/03/2023

Item remarked as 230331-R01. Follow-up action is needed to be review.

31/03/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/04

Air Quality

24/02/2023

Provide impervious sheeting or water spraying for dusty stockpile in whole sale market.

Improvement/Rectification was observed during follow-up audit session on 2 March 2023.

Water Quality

24/02/2023

Covering of stockpile is required to minimize the muddy runoff during rainstorm.

Item remarked as 230302-R01. Follow-up action is needed to be review.

02/03/2023

Item remarked as 230309-R01. Follow-up action is needed to be review.

09/03/2023

Item remarked as 230315-R01. Follow-up action is needed to be review.

15/03/2023

Item remarked as 230323-R01. Follow-up action is needed to be review.

23/03/2023

Item remarked as 230330-R01. Follow-up action is needed to be review.

30/03/2023

Follow-up action is needed to be reported in the following month.

24/02/2023

Provide barrier (e.g., sandbag) for G.I. operation.

Improvement/Rectification was observed during follow-up audit session on 2 March 2023.

Waste/Chemical Management

24/02/2023

Drip tray should be provided for chemical storage. / Provide drip tray for chemical/fuel containers.

Item remarked as 230302-R02. Follow-up action is needed to be review.

02/03/2023

Item remarked as 230309-R02. Follow-up action is needed to be review.

09/03/2023

Improvement/Rectification was observed during follow-up audit session on 15 March 2023.

Contract No.: ND/2019/05

Air Quality

27/02/2023

Provide impervious sheeting to cover the dusty stockpile in JCR.

Improvement/Rectification was observed during follow-up audit session on 6 March 2023.

06/03/2023

Provide impervious sheeting for the dusty stockpile to avoid dust generation.

Improvement/Rectification was observed during follow-up audit session on 16 March 2023.

Waste/Chemical Management

06/03/2023

Provide drip tray for chemical/fuel containers.

Improvement/Rectification was observed during follow-up audit session on 16 March 2023.

Water Quality

27/03/2023

Should provide adequate capacity of water treatment to prevent muddy runoff going through site surface in Kwu Tung site.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--