Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Permit/Licences

14/06/2023

The CNP was felling off to the ground after adverse weather at Portion 8a.

Improvement/Rectification was observed during follow-up audit session on 20 Jun 2023.

Waste/Chemical Management

20/06/2023

Accumulation of general refuse should be avoided.

Improvement/Rectification was observed during follow-up audit session on 27 Jun 2023.

Contract No.: ND/2019/02

Water Quality

29/05/2023

The exposed slope surface should be covered by tarpaulin sheets.

Item remarked as 230609-O01. Follow-up action is needed to be review.

09/06/2023

Debris of sediment were observed fallen off the exposed slope into nearby river. Contractor was urged to enhance water mitigation measure, cover the exposed slope with impervious sheet, to prevent further debris or runoff from entering nearby river.

Item remarked as 230612-O01. Follow-up action is needed to be review.

12/06/2023

Improvement/Rectification was observed during follow-up audit session on 21 Jun 2023.

Waste/Chemical Management

09/06/2023

Breaker should be placed on top of tarpaulin sheet to prevent land contamination from potential oil leakage.

Item remarked as 230612-R01. Follow-up action is needed to be review.

12/06/2023

Improvement/Rectification was observed during follow-up audit session on 21 Jun 2023.

Landscape and Visual

12/06/2023

Retained trees should be carefully protected. Contractor was reminded to set up a proper tree protection zone to prevent construction material to be placed on the roots of retained trees.

Improvement/Rectification was observed during follow-up audit session on 21 Jun 2023.

Contract No.: ND/2019/03

Air Quality

22/05/2023

Dusty stockpiles should be covered with tarpaulin sheets.

Item remarked as 230602-R02. Follow-up action is needed to be review.

02/06/2023

Item remarked as 230609-R01. Follow-up action is needed to be review.

09/06/2023

Item remarked as 230616-R01. Follow-up action is needed to be review.

16/06/2023

Item remarked as 230620-R01. Follow-up action is needed to be review.

20/06/2023

Item remarked as 230630-R01. Follow-up action is needed to be review.

30/06/2023

Follow-up action is needed to be reported in the following month.

Water Quality

22/05/2023

Provide adequate wheel-washing facilities for each vehicle exits, suitable for the current temporary traffic arrangement, and ensure that vehicles are properly washed before leaving the site.

Item remarked as 230602-O01. Follow-up action is needed to be review.

02/06/2023

Item remarked as 230609-O01. Follow-up action is needed to be review.

09/06/2023

Item remarked as 230616-O01. Follow-up action is needed to be review.

16/06/2023

Provide adequate wheel-washing facilities for each vehicle exits.

Item remarked as 230620-O01. Follow-up action is needed to be review.

20/06/2023

Item remarked as 230630-O01. Follow-up action is needed to be review.

30/06/2023

Follow-up action is needed to be reported in the following month.

16/06/2023

Provide sand bags to prevent muddy water discharge.

Item remarked as 230620-R02. Follow-up action is needed to be review.

20/06/2023

Item remarked as 230630-R02. Follow-up action is needed to be review.

30/06/2023

Follow-up action is needed to be reported in the following month.

Landscape & Visual

22/05/2023

Remove any construction material from tree protection zone.

Item remarked as 230602-R01. Follow-up action is needed to be review.

02/06/2023

Improvement/Rectification was observed during follow-up audit session on 9 Jun 2023.

Contract No.: ND/2019/04

Air Quality

25/05/2023

The idle stockpile of dusty materials at Portion K should be covered properly with tarpaulin sheet.

Item remarked as 230601-R01. Follow-up action is needed to be review.

01/06/2023

Improvement/Rectification was observed during follow-up audit session on 8 Jun 2023.

Water Quality

01/06/2023

The sandbag bunding should be enhanced.

Item remarked as 230608-R02. Follow-up action is needed to be review.

08/06/2023

Item remarked as 230614-R02. Follow-up action is needed to be review.

14/06/2023

Improvement/Rectification was observed during follow-up audit session on 21 Jun 2023.

Noise

08/06/2023

The noise barrier at Bridge F should be fully enclosed.

Item remarked as 230614-R01. Follow-up action is needed to be review.

14/06/2023

Improvement/Rectification was observed during follow-up audit session on 21 Jun 2023.

29/06/2023

Follow-up action is needed to be reported in the following month.

Ecology

29/06/2023

Provide maintenance for 2m high solid barrier at the lower reaches of Siu Hang San Tsuen Stream.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/05

Water Quality

05/06/2023

The earth bunding surrounding FW06 should be enhanced.

Improvement/Rectification was observed during follow-up audit session on 15 Jun 2023.

26/06/2023

Enhance the water mitigation measure for E201.

Follow-up action is needed to be reported in the following month.

Air Quality

15/06/2023

Faded NRMM label at E2-02 should be replaced.

Improvement/Rectification was observed during follow-up audit session on 19 Jun 2023.

26/06/2023

Provide impervious sheeting for dusty stockpile. (Man Young)

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--