11.1 No Action/Limit Level exceedance for air
quality, water quality, construction noise, ambient arsenic, built heritage and
landfill gas monitoring was recorded in the reporting month. The summary of
exceedance record in the reporting month is shown in Appendix O.
11.2 Ecological monitoring was carried out in the reporting
month. Six (6) action level exceedance and six (6) limit level exceedance for
non-aquatic fauna were recorded at T1, T3 and T6. The exceedance were considered non-project
related, as large proportion of vegetative habitat along T3 were observed
either removed, tarmacked, and concreted as haul road by construction works
outside of project, first reported in the Monthly Monitoring Report in December
2021, as well as adverse weather condition during the monitoring session saw
the non-aquatic fauna result lowered.
11.3 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that
Action / Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried
out.
11.4 No environmental non-compliance was recorded in the
reporting month.
11.5 No environmental complaint was received in the
reporting month. The Cumulative Complaint Log since the commencement of the
Project is presented in Appendix S.
11.6
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.