Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

--

--

--

--

Contract No.: ND/2019/02

Water Quality

19/07/2023

The exposed slopes next to Sheung Yue River should be covered by tarpaulin sheets and maintained regularly and properly to prevent muddy water discharge during rainstorm.

Item remarked as 230728-R02. Follow-up action is needed to be review.

28/07/2023

Follow-up action is needed to be reported in the following month.

Air Quality

28/07/2023

Faded NRMM label should be replaced.

Follow-up action is needed to be reported in the following month.

Landscape and Visual

19/07/2023

The removed green hoarding along Sheung Yue River due to the construction works should be replaced and maintained properly as soon as possible.

Item remarked as 230728-R01. Follow-up action is needed to be review.

28/07/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Air Quality

30/06/2023

Dusty stockpiles should be covered with tarpaulin sheets.

Item remarked as 230706-R01. Follow-up action is needed to be review.

06/07/2023

Item remarked as 230714-R01. Follow-up action is needed to be review.

14/07/2023

Item remarked as 230718-R01. Follow-up action is needed to be review.

18/07/2023

Item remarked as 230728-R01. Follow-up action is needed to be review.

28/07/2023

Follow-up action is needed to be reported in the following month.

Water Quality

30/06/2023

Provide adequate wheel-washing facilities for each vehicle exits.

Item remarked as 230706-O01. Follow-up action is needed to be review.

06/07/2023

Item remarked as 230714-O01. Follow-up action is needed to be review.

14/07/2023

Item remarked as 230718-O01. Follow-up action is needed to be review.

18/07/2023

Item remarked as 230728-O01. Follow-up action is needed to be review.

28/07/2023

Follow-up action is needed to be reported in the following month.

30/06/2023

Provide sand bags to prevent muddy water discharge.

Item remarked as 230706-R02. Follow-up action is needed to be review.

06/07/2023

Item remarked as 230714-R02. Follow-up action is needed to be review.

14/07/2023

Item remarked as 230718-R02. Follow-up action is needed to be review.

18/07/2023

Item remarked as 230728-R02. Follow-up action is needed to be review.

28/07/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/04

Noise

29/06/2023

The noise barrier at Bridge F should be fully enclosed.

Improvement/Rectification was observed during follow-up audit session on 6 Jul 2023.

Ecology

29/06/2023

Provide maintenance for 2m high solid barrier at the lower reaches of Siu Hang San Tsuen Stream.

Item remarked as 230706-R01. Follow-up action is needed to be review.

06/07/2023

Item remarked as 230713-R01. Follow-up action is needed to be review.

13/07/2023

Item remarked as 230719-R01. Follow-up action is needed to be review.

19/07/2023

Improvement/Rectification was observed during follow-up audit session on 27 Jul 2023.

Contract No.: ND/2019/05

Water Quality

26/06/2023

Enhance the water mitigation measure for E201.

Improvement/Rectification was observed during follow-up audit session on 3 Jul 2023.

03/07/2023

Sandbag barrier should be enhanced to prevent surface runoff at D2-01.

Improvement/Rectification was observed during follow-up audit session on 10 Jul 2023.

Air Quality

26/06/2023

Provide impervious sheeting for dusty stockpile. (Man Young)

Improvement/Rectification was observed during follow-up audit session on 3 Jul 2023.

Waste / Chemical Management

31/07/2023

Provide Drip tray for chemical/fuel containers.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--