Table 10.2       Observations and Recommendations during Site Audits

Parameters

Date

Observations and Recommendations

Follow-up

Contract No.: ND/2019/01

 

Air Quality

17/01/2023

Faded NRMM label should be replaced.

Improvement/Rectification was observed during follow-up audit session on 27 January 2023.

Waste/Chemical Management

31/01/2023

General refuse should be disposed of regularly and properly.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/02

Water Quality

28/12/2022

Sufficient mitigation measures should be deployed on the excavated section next to the Sheung Yue River.

Item remarked as 230104-R02. Follow-up action is needed to be review.

04/01/2023

Item remarked as 230113-R02. Follow-up action is needed to be review.

13/01/2023

Item remarked as 230118-R02. Follow-up action is needed to be review.

18/01/2023

Improvement/Rectification was observed during follow-up audit session on 26 January 2023.

28/12/2022

Broken silt-curtain should be replaced.

Item remarked as 230104-R03. Follow-up action is needed to be review.

04/01/2023

Item remarked as 230113-R03. Follow-up action is needed to be review.

13/01/2023

Item remarked as 230118-R03. Follow-up action is needed to be review.

18/01/2023

Item remarked as 230126-R02. Follow-up action is needed to be review.

26/01/2023

Follow-up action is needed to be reported in the following month.

Landscape and Visual

28/12/2022

To remove construction material leaning onto retained trees and set up tree protection zone.

Item remarked as 230104-R01. Follow-up action is needed to be review.

04/01/2023

Item remarked as 230113-R01. Follow-up action is needed to be review.

13/01/2023

Item remarked as 230118-R01. Follow-up action is needed to be review.

18/01/2023

Item remarked as 230126-R01. Follow-up action is needed to be review.

26/01/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/03

Air Quality

30/12/2022

Dusty debris were observed at the site exit of Yin Kong. Contractor was reminded to clear the dusty debris immediately, and enhance water and dust mitigation measures around the boundary of Yin Kong Road works area.

Item remarked as 230106-O01. Follow-up action is needed to be review.

06/01/2023

Item remarked as 230113-O01. Follow-up action is needed to be review.

13/01/2023

Item remarked as 230117-O01. Follow-up action is needed to be review.

17/01/2023

Item remarked as 230127-O01. Follow-up action is needed to be review.

27/01/2023

Follow-up action is needed to be reported in the following month.

Water Quality

30/12/2022

Dusty debris were observed at the site exit of Yin Kong. Contractor was reminded to clear the dusty debris immediately, and enhance water and dust mitigation measures around the boundary of Yin Kong Road works area.

Item remarked as 230106-O01. Follow-up action is needed to be review.

06/01/2023

Item remarked as 230113-O01. Follow-up action is needed to be review.

13/01/2023

Item remarked as 230117-O01. Follow-up action is needed to be review.

17/01/2023

Item remarked as 230127-O01. Follow-up action is needed to be review.

27/01/2023

Follow-up action is needed to be reported in the following month.

Waste / Chemical Management

30/12/2022

Provide drip tray for chemical/fuel containers.

Item remarked as 230106-R01. Follow-up action is needed to be review.

06/01/2023

Item remarked as 230113-R01. Follow-up action is needed to be review.

13/01/2023

Item remarked as 230117-R01. Follow-up action is needed to be review.

17/01/2023

Item remarked as 230127-R01. Follow-up action is needed to be review.

27/01/2023

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/04

Water Quality

29/12/2022

Covering of stockpile is required to minimize the muddy runoff during rainstorm.

Item remarked as 230105-R01. Follow-up action is needed to be review.

05/01/2023

Item remarked as 230112-R01. Follow-up action is needed to be review.

12/01/2023

Item remarked as 230116-R01. Follow-up action is needed to be review.

16/01/2023

Item remarked as 230126-R01. Follow-up action is needed to be review.

26/01/2023

Follow-up action is needed to be reported in the following month.

Waste/Chemical Management

26/01/2023

Drip tray should be provided for chemical storage.

Follow-up action is needed to be reported in the following month.

Contract No.: ND/2019/05

--

--

--

--

Contract No.: ND/2019/06

--

--

--

--

Contract No.: ND/2019/07

 

--

--

--

--