Table II      Summary Table for EM&A Activities in the Reporting Month

EM&A Activities

Monitoring Station (s)

Works Contracts

ND/2019/01

ND/2019/02

ND/2019/03

ND/2019/04

ND/2019/05

ND/2019/06

ND/2019/07

1-hr Total Suspended Particulates (TSP) Monitoring

FLN-DMS1

N/A

N/A

6, 12, 18, 22 and 28 Dec 23

6, 12, 18, 22 and 28 Dec 23

N/A

N/A

N/A

FLN-DMS3

N/A

N/A

6, 12, 18, 22 and 28 Dec 23

FLN-DMS5

5, 11, 15, 21 and 27 Dec 23

5, 11, 15, 21 and 27 Dec 23

N/A

KTN-DMS4(B)

5, 11, 15, 21 and 27 Dec 23

5, 11, 15, 21 and 27 Dec 23

N/A

24-hr TSP Monitoring

FLN-DMS1

N/A

N/A

5, 11, 15, 21 and 27 Dec 23

5, 11, 15, 21 and 27 Dec 23

N/A

N/A

N/A

FLN-DMS3

N/A

N/A

5, 11, 15, 21 and 27 Dec 23

FLN-DMS5A

5, 11, 15, 21 and 27 Dec 23

5, 11, 15, 21 and 27 Dec 23

N/A

KTN-DMS4(B)

5, 11, 15, 21 and 27 Dec 23

5, 11, 15, 21 and 27 Dec 23

N/A

Noise Monitoring

CP-FLN-NMS1

N/A

6, 12, 18 and 28 Dec 23

N/A

CP-FLN-NMS2

N/A

6, 12, 18 and 28 Dec 23

N/A

CP-KTN-NMS2

5, 11, 21 and 27 Dec 23

N/A

N/A

CP-KTN-NMS3

CP-KTN-NMS5

CP-KTN-NMS6

N/A

5, 11, 21 and 27 Dec 23

Ecological Survey

Monitoring of Measures to Minimise Disturbance to Water Birds on Ng Tung River, Sheung Yue River, and Long Valley

N/A

N/A

4, 7, 11, 15, 18, 21, 27 and 28 Dec 2023

7, 15, 21, and 28 Dec 23

N/A

N/A

N/A

Monitoring of Measures to Minimise Impacts to Ma Tso Lung Stream and Siu Hang San Tsuen Stream

N/A*

N/A*

N/A*

N/A*

N/A*

N/A*

N/A*

Monitoring of Measures to Minimise Impacts on Ecological Sensitive Habitats from Disturbance and Pollution

5 and 12 Dec 23

5 and 12 Dec 23

12 Dec 23

12 Dec 23

12 Dec 23

N/A*

N/A*

Egretry Monitoring

N/A

N/A

N/A

N/A

N/A

N/A

N/A

24-hr RSP (Ambient Arsenic) Monitoring for Land Contamination

5, 11, 15, 21 and 27 Dec 23

N/A

5, 11, 15, 21 and 27 Dec 23

N/A

N/A

N/A

N/A

Water Quality Monitoring

N/A

1, 4, 6, 8, 11, 13, 15, 18, 20, 22, 27 and 29 Dec 23

N/A

1, 4, 6, 8, 11, 13, 15, 18, 20, 22, 27 and 29 Dec 23

N/A

N/A

N/A

Landfill Gas Monitoring

21 Dec 23

N/A

N/A

N/A

N/A

N/A

N/A

Built Heritage Monitoring

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Environmental Site Inspection

5, 12, 19 and 28 Dec 23

6, 14, 20 and 29 Dec 23

8, 15, 19 and 27 Dec 23

7, 12, 21 and 28 Dec 23

4, 14, 18 and 27 Dec 23

NIL

1, 8, 15, 22 and 29 Dec 23

Remarks:  

N/A – No relevant monitoring is required according to the updated EM&A Manual

N/A* – No relevant monitoring is required according to the Baseline Ecological Monitoring Plan (Table 3.1)

[1] Since the distance between monitoring station CP-KTN-NMS2 and site boundary of ND/2019/03 under EP-468/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03

[2] Since the distance between monitoring station CP-KTN-NMS3 and site boundary of ND/2019/03 under EP-468/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03

[3] Since the distance between monitoring station CP-KTN-NMS1 and site boundary of ND/2019/02 under EP-469/2013 exceeds 300m, the monitoring station is not applicable to ND/2019/02

[4] Since the distance between monitoring station FLN-DMS1 and site boundary of ND/2019/05 under EP-473/2013/A exceeds500m, the monitoring station is not applicable to ND/2019/05

[5] Since the distance between monitoring station FLN-DMS3 and site boundary of ND/2019/03 and ND/2019/04 under EP-473/2013/A exceeds 500m, the monitoring station is not applicable to ND/2019/03 and ND/2019/04

[6] Since the distance between monitoring station FLN-DMS5 and site boundary of ND/2019/05 under EP-473/2013/A exceeds 500m, the monitoring station is not applicable to ND/2019/05

[7] Since the distance between monitoring station CP-FLN-NMS2 and site boundary of ND/2019/03 and ND/2019/04 under EP-473/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03 and ND/2019/04

[8] Since the distance between monitoring station CP-FLN-NMS1 and site boundary of ND/2019/03 under EP-473/2013/A exceeds 300m, the monitoring station is not applicable to ND/2019/03