Contract No.: ND/2019/01 |
|||
Water Quality |
19/12/2023 |
The litter in RC2 at Portion 1B should be
cleared. RC2 should be maintained properly. |
Improvement/Rectification
was observed during follow-up audit session on 28 Dec 2023. |
Air Quality |
05/12/2023 |
Provide impervious sheeting for the dusty
stockpile at portion 2. |
Improvement/Rectification
was observed during follow-up audit session on 12 Dec 2023. |
05/12/2023 |
Provide valid NRMM label for the generator
at portion 5. |
Improvement/Rectification
was observed during follow-up audit session on 12 Dec 2023. |
|
12/12/2023 |
Review and enhance the condition of
hydroseeding at Pak Shek Au. |
Item remarked as 231219-R02. Follow-up action is needed to be review. |
|
19/12/2023 |
Improvement/Rectification
was observed during follow-up audit session on 28 Dec 2023. |
||
19/12/2023 |
Review and enhance the condition of
hydroseeding at Portion 1C. |
Improvement/Rectification
was observed during follow-up audit session on 28 Dec 2023. |
|
Waste / Chemical Management |
05/12/2023 |
Keep clean and tidy for the portion 9b. |
Improvement/Rectification
was observed during follow-up audit session on 12 Dec 2023. |
12/12/2023 |
Fell trees and yard waste should be cleared
at Pak Shek Au. |
Improvement/Rectification
was observed during follow-up audit session on 19 Dec 2023. |
|
Landscape and Visual |
12/12/2023 |
Tree protection zone should be provided for
the retained trees at Portion 11b. |
Improvement/Rectification
was observed during follow-up audit session on 19 Dec 2023. |
Noise |
28/12/2023 |
The NEL of the air compressor at Portion 8a
should be displayed. |
Follow-up action is needed to be reported in the following month. |
Contract No.: ND/2019/02 |
|||
Water Quality |
29/11/2023 |
Provide maintenance for
the water mitigation measure to prevent surface runoff. |
Improvement/Rectification was
observed during follow-up audit session on 6 Dec 2023. |
29/11/2023 |
Provide maintenance for
the sandbags to prevent muddy water/ debris discharge onto cycling track. |
Improvement/Rectification was
observed during follow-up audit session on 6 Dec 2023. |
|
29/11/2023 |
Provide maintenance to
the concrete bund to prevent wheel-washing wastewater discharge. |
Item
remarked as 231206-R02. Follow-up action is needed to be review. |
|
06/12/2023 |
Item
remarked as 231214-R02. Follow-up action is needed to be review. |
||
14/12/2023 |
Improvement/Rectification was
observed during follow-up audit session on 20 Dec 2023. |
||
29/11/2023 |
Exposed slope at
Portion 5 should be properly covered by tarpaulin sheets. |
Improvement/Rectification was
observed during follow-up audit session on 6 Dec 2023. |
|
29/11/2023 |
Silt accumulating in
the nullah near the water outlet at the material storage should be cleared
continuously. Contractor was also reminded to enhance water mitigation
measures to prevent further accumulation of silt. |
Item
remarked as 231206-R03. Follow-up action is needed to be review. |
|
06/12/2023 |
Item
remarked as 231214-R03. Follow-up action is needed to be review. |
||
14/12/2023 |
Item
remarked as 231220-R02. Follow-up action is needed to be review. |
||
20/12/2023 |
Item
remarked as 231229-R02. Follow-up action is needed to be review. |
||
29/12/2023 |
Follow-up
action is needed to be reported in the following month. |
||
29/11/2023 |
Muddy water in Portion
11 should be cleared immediately to avoid overflow. |
Improvement/Rectification was
observed during follow-up audit session on 6 Dec 2023. |
|
29/11/2023 |
Leakage of muddy water
was observed at Portion 4. Contractor was reminded to repair the drainage
system. |
Improvement/Rectification was
observed during follow-up audit session on 6 Dec 2023. |
|
29/11/2023 |
Leakage of untreated
water was observed. Contractor was reminded to review the water treatment
system of Portion 5. |
Improvement/Rectification was
observed during follow-up audit session on 6 Dec 2023. |
|
06/12/2023 |
The channel should be
properly blocked to prevent contamination. |
Improvement/Rectification was
observed during follow-up audit session on 14 Dec 2023. |
|
06/12/2023 |
Provide maintenance to
sandbags to prevent muddy water/ debris discharge in river. |
Improvement/Rectification was
observed during follow-up audit session on 14 Dec 2023. |
|
06/12/2023 |
Regular cleaning of the
garbage in Portion 11 should be conducted. |
Improvement/Rectification was
observed during follow-up audit session on 14 Dec 2023. |
|
14/12/2023 |
Enhance the mitigation
measures to prevent waste or surface runoff for the discharge point of
Portion 1. |
Item
remarked as 231220-R04. Follow-up action is needed to be review. |
|
20/12/2023 |
Item
remarked as 231229-R03. Follow-up action is needed to be review. |
||
29/12/2023 |
Follow-up
action is needed to be reported in the following month. |
||
20/12/2023 |
Provide maintenance to
impervious sheeting on the exposed slope at Portion 5. |
Item
remarked as 231229-R04. Follow-up action is needed to be review. |
|
29/12/2023 |
Follow-up
action is needed to be reported in the following month. |
||
20/12/2023 |
Accumulated ground
water should be pumped out to wastewater treatment facilities prior to
discharge. |
Improvement/Rectification was
observed during follow-up audit session on 29 Dec 2023. |
|
20/12/2023 |
Provide impervious
sheeting for the exposed slope at Portion 4. |
Improvement/Rectification was
observed during follow-up audit session on 29 Dec 2023. |
|
29/12/2023 |
Contractor was reminded
to ensure the vehicles are properly cleaned of dirt and dust before leaving the site. |
Follow-up
action is needed to be reported in the following month. |
|
Air Quality |
14/12/2023 |
Provide impervious
sheeting for the exposed slope at Portion 4. |
Item
remarked as 231220-R03 (Water Quality). Follow-up action is needed to be
review. |
20/12/2023 |
Exposed works sites and
haul roads should be sprayed with water as dust suppression. |
Improvement/Rectification was
observed during follow-up audit session on 29 Dec 2023. |
|
29/12/2023 |
Dusty stockpile and
exposed slopes should be covered with tarpaulin sheets. |
Follow-up
action is needed to be reported in the following month. |
|
Landscape and Visual |
29/11/2023 |
The removed green
hoarding along Sheung Yue River due to the construction works should be
replaced and maintained properly as soon as possible. |
Item
remarked as 231206-R01. Follow-up action is needed to be review. |
06/12/2023 |
Item
remarked as 231214-R01. Follow-up action is needed to be review. |
||
14/12/2023 |
Item
remarked as 231220-R01. Follow-up action is needed to be review. |
||
20/12/2023 |
Item
remarked as 231229-R01. Follow-up action is needed to be review. |
||
29/12/2023 |
Follow-up
action is needed to be reported in the following month. |
||
Waste / Chemical Management |
29/11/2023 |
Provide drip tray for
chemical/fuel container at visiting center. |
Improvement/Rectification was
observed during follow-up audit session on 6 Dec 2023. |
29/11/2023 |
Accumulation of general
refuse should be avoided at the riverbank of Portion 11. |
Item
remarked as 231206-R04. Follow-up action is needed to be review. |
|
06/12/2023 |
Improvement/Rectification was
observed during follow-up audit session on 14 Dec 2023. |
||
14/12/2023 |
Keep site clean and
tidy at Portion 1. |
Improvement/Rectification was
observed during follow-up audit session on 20 Dec 2023. |
|
Permit / Licences |
20/12/2023 |
Construction Noise
Permit should be available for inspection at site entrance. |
Improvement/Rectification was
observed during follow-up audit session on 29 Dec 2023. |
Contract No.: ND/2019/03 |
|||
Water Quality |
08/12/2023 |
Contractor was reminded to ensure vehicles are properly washed before
leaving the site. |
Improvement/Rectification
was observed during follow-up audit session on 15 Dec 2023. |
Waste/Chemical Management |
15/12/2023 |
Provide drip tray for chemical/fuel containers. |
Improvement/Rectification
was observed during follow-up audit session on 19 Dec 2023. |
Contract No.: ND/2019/04 |
|||
Water Quality |
12/12/2023 |
Blue hoses should be kept away from the riverside near A3-03. |
Item remarked as 231221-R02. Follow-up action is needed to be review. |
21/12/2023 |
Improvement/Rectification
was observed during follow-up audit session on 28 Dec 2023. |
||
Ecology |
30/11/2023 |
The dull green barrier of the 10m buffer zone near Siu Hang San Tsuen
should be maintained properly and regularly. |
Item remarked as 231207-R02. Follow-up action is needed to be review. |
07/12/2023 |
Improvement/Rectification
was observed during follow-up audit session on 12 Dec 2023. |
||
30/11/2023 |
The silt curtain next to A3-01 should be maintained properly |
Item remarked as 231207-R03. Follow-up action is needed to be review. |
|
07/12/2023 |
Improvement/Rectification
was observed during follow-up audit session on 12 Dec 2023. |
||
28/12/2023 |
The silt curtain at Bridge F should be maintained regularly and
properly. |
Follow-up action is needed to be reported in the following month. |
|
Air Quality |
30/11/2023 |
Stockpile of dusty material at A1-03 and Portion K should be covered
by impervious sheets properly. |
Improvement/Rectification
was observed during follow-up audit session on 7 Dec 2023. |
07/12/2023 |
Exposed site area should be watered regularly as dust suppression at
A1-03 and A3-03. |
Improvement/Rectification
was observed during follow-up audit session on 12 Dec 2023. |
|
12/12/2023 |
Dusty stockpile should be covered by impervious sheets properly at
Portion K. |
Item remarked as 231221-R01. Follow-up action is needed to be review. |
|
21/12/2023 |
Dusty stockpile at Portion K should be covered properly or watered
regularly as dust suppression. |
Improvement/Rectification
was observed during follow-up audit session on 28 Dec 2023. |
|
Waste / Chemical Management |
07/12/2023 |
Accumulation of general refuse should be avoided at A1-05. |
Improvement/Rectification
was observed during follow-up audit session on 12 Dec 2023. |
Contract No.: ND/2019/05 |
|||
Waste / Chemical Management |
04/12/2023 |
The construction site at On Lok Garden should be kept clean and tidy
generally. The contractor was reminded to clear the waste regularly. |
Improvement/Rectification
was observed during follow-up audit session on 14 Dec 2023. |
Water Quality |
18/12/2023 |
Litter in the temporary drainage at B1-02a should be cleared and
maintained properly. |
Improvement/Rectification
was observed during follow-up audit session on 27 Dec 2023. |
Contract No.: ND/2019/06 |
|||
-- |
-- |
-- |
-- |
Contract No.: ND/2019/07 |
|||
Waste/Chemical Management |
22/12/2023 |
Ensure that the drip tray remains clear to maintain adequate capacity. |
Improvement/Rectification
was observed during follow-up audit session on 29 Dec 2023. |