11.1 No Action/Limit Level exceedance for air
quality, water quality, construction noise, ambient arsenic, built heritage and
landfill gas monitoring was recorded in the reporting month. The summary of
exceedance record in the reporting month is shown in Appendix O.
11.2 Ecological monitoring was carried out in the reporting
month. Four (4) action level exceedance and four (4) limit level exceedance for
non-aquatic fauna were recorded at T3 and T6. The exceedance were considered non-project related..
11.3 Should the monitoring results of the environmental
monitoring parameters at any designated monitoring stations indicate that Action
/ Limit Levels are exceeded, the actions in accordance with the Event/Action
Plan in Appendix N would be carried
out.
11.4 No environmental non-compliance was recorded in the
reporting month.
11.5 Two environmental complaints were received in the
reporting month. One is for ND/2019/01 and One is for ND/2019/05. The Cumulative Complaint Log since the commencement
of the Project is presented in Appendix S.
11.6
There was no
successful environmental prosecution or notification of summons received since
the Project commencement. The Cumulative Log for environmental summon and
successful prosecution since the commencement of the Project is presented in Appendix T.